Loading...
HomeMy WebLinkAboutB & B Builders and Supply-12/13/2010CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 2 PROJECT: F.Y. 2010 SIDEWALK REPAIR PROGRAM — ZONE 10 AND TRAIL REPAIRS CONTRACT. NO. 779 Date Prepared: Deoember3, 2010 AMOUNT: $26,775.00 INCREASE TO: B & B BUILDERS AND SUPPLY , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 12, 2010. A. Description of change to be made or extra work to be done: 2001 Additional removal of existing asphalt trail and replacement with 5 -inch PCC B. Reason for ordering change or extra work: 2001 Review of funds showed additional older General Obligation bond monies available to make trail repairs beyond the amount originally put out for bid and amount added in Change Order #1. Settlement for cost of work to be made as follows: 2001 Remove existing asphalt trail, replace 5950 SF @ $4.50 per SF $26,775 with 5" PCC TOTAL INCREASE $26,775.00 BY: I40 016 B & B BUILDERS AND SUPPLY Mayor Date Change Order No. 2 CONTRACTOR BY: /A `if zo/° bate 171131410 71I3 4(0 TITLE: ae Date APP OVED: /2/q/0/0City Engineer Date Contract No. 779 Sheet 1 of 1