HomeMy WebLinkAboutHR Green Co-12/13/2010Howard R. Green Company 8710 Earhart Lane SW P. O. Box 9009 Cedar Rapids, IA 52409-9009 (319) 841-4000 FAX (319) 841-4012 CHANGE ORDER Distribution: Owner X Engineer Contractor X Field Other HRG PROJECT: Phase 2 Demolition Former Chamberlain Manufacturing Property Contract No. 762 Waterloo, Iowa Change Order No. 3 Date December 1, 2010 To Contractor: Active Thermal Concepts, Inc. 2805 Stonegate Court Hiawatha, Iowa 52233 Contract No. 762 Original Contract Date May 17, 2010 The contract is changed as follows: Delete- import soil and compaction Total Cost Change Order No. 3 is ($1,500.00). The original Contract Sum was $547,427.00 Net change by previously authorized Change Orders $56,552.00 The Contract Sum prior to this Change Order was $603,979.00 The Contract Sum will be increased by this Change Order in the amount of ($1,500.00) The new Contract Sum including this Change order will be $602,479.00 The Contract Time will be increased by zero (0) days The date of Substantial Completion as of the date of this Change Order therefore is October 30, 2010 NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE, if applicable, AND OWNER Contractor Owner's Representative Howard R. Green Company Owner City,faterloo, low Active Th rmal Con epts, Inc. By V David Reisner, President By /6 i,V:„ . . 7,,,.4 a est G. Clark, Mayor Date: Date:/ /f Date: /211-490Cd C:\Documents and Settings\mvanriper\Local Settings\Temporary Internet Files\Content.Outlook\B1DPS601\Change Order No 3-762-120110.doc