CHANGE ORDER
Distribution:
Owner X
Engineer
Contractor X
Field
Other HRG
PROJECT:
Phase 2 Demolition
Former Chamberlain Manufacturing Property
Contract No. 762
Waterloo, Iowa
Change Order No.
3
Date
December 1, 2010
To Contractor:
Active Thermal Concepts, Inc.
2805 Stonegate Court
Hiawatha, Iowa 52233
Contract No.
762
Original Contract Date
May 17, 2010
The contract is changed as follows: Delete- import soil and compaction
Total Cost Change Order No. 3 is ($1,500.00).
The original Contract Sum was
$547,427.00
Net change by previously authorized Change Orders
$56,552.00
The Contract Sum prior to this Change Order was
$603,979.00
The Contract Sum will be increased by this Change Order in the amount of
($1,500.00)
The new Contract Sum including this Change order will be
$602,479.00
The Contract Time will be increased by
zero (0) days
The date of Substantial Completion as of the date of this Change Order therefore is
October 30, 2010
NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE, if applicable, AND OWNER
Contractor
Owner's Representative
Howard R. Green Company
Owner
City,faterloo, low
Active Th rmal Con epts, Inc.
By V
David Reisner, President
By /6 i,V:„
. .
7,,,.4
a est G. Clark, Mayor
Date:
Date:/ /f
Date: /211-490Cd