HomeMy WebLinkAboutAecom Technical Services-12/13/2010A=COM
AECOM 319 232 6531 tel
501 Sycamore Street 319 232 0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
CEDAR VALLEY RIVERFRONT RENAISSANCE
WATERLOO VISION IOWA PROJECTS
FINAL DESIGN SERVICES FOR ELECTRICAL IMPROVEMENTS TO
CATTLE CONGRESS SANITARY PUMP STATION
SUPPLEMENTAL AGREEMENT NO. 11
WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo,
Iowa (Client), and AECOM Technical Services, Inc., formerly Earth Tech, Inc. (Consultant), of
Waterloo, Iowa, dated September 22, 2003, for the preliminary design, final design and
construction -related services for the Cedar Valley Riverfront Renaissance, Waterloo Vision Iowa
Projects, including the three major projects known as the Riverwalk Loop, Cedar River Dam
Improvements and the Cedar River Plaza and Amphitheatre in Waterloo, Iowa; and
WHEREAS, Supplemental Agreement No. 1 was entered into between the Client and the
Consultant dated January 24, 2005, for Phase II - Final Design Services of selected alternatives;
and
WHEREAS, Supplemental Agreement No. 2 was entered into between the Client and the
Consultant dated October 10, 2005, for Phase III - Construction -Review Services for that portion of
the project including floodwall modifications at the Lower Plaza and Waterloo Center for the Arts
Youth Pavilion; and
WHEREAS, Supplemental Agreement No. 3 was entered into between the Client and the
Consultant dated September 18, 2006, for Phase III — Construction -Review Services for that portion
of the project including the Riverwalk Loop Trail from East eh Street to 18th Street; and
WHEREAS, Supplemental Agreement No. 4 was entered into between the Client and the
Consultant dated May 21, 2007, for Phase III — Construction Review Services for that portion of the
project including the Waterloo Dam Rehabilitation and River Wall Reconstruction; and
WHEREAS, Supplemental Agreement No. 5 was entered into between the Client and Consultant
dated June 15, 2007, for Phase III - Construction Review Services for that portion of the project
including the Riverwalk Loop Trail from Cedar Bend Park to Mullan Avenue; and
WHEREAS, Supplemental Agreement No. 6 was entered into between the Client and the
Consultant dated September 2, 2008, for Phase III - Construction Review Services for that portion
of the project including the Riverwalk Loop Trail Enhancements (Overlooks) along the north side of
the Cedar River, from 6th Street to the Cedar River Dam; and
WHEREAS, Supplemental Agreement No. 7 was entered into between the Client and the
Consultant dated October 20, 2008, for Phase III - Construction Review Services for repairs of
damage to portions of the project along the Cedar River caused by the flood of 2008; and
WHEREAS, Supplemental Agreement No. 8 was entered into between the Client and the
Consultant, dated August 17, 2009, for final design services for Mark's Park and additional design
services for a Performance Structure for the amphitheatre area of the lower plaza; and
WHEREAS, Supplemental Agreement No. 9 was entered into between the Client and the
Consultant, dated March 26, 2010, for Phase III - Construction Review Services for that portion of
the project including the Riverwalk Loop Trail from West 6th Street to 18th Street on the south side of
the Cedar River; and
A=COM
WHEREAS, Supplemental Agreement No. 10 was entered into between the Client and the
Consultant, dated April 26, 2010, for Phase III - Constructed Review Services for that portion of the
project including the Lower Plaza, additional construction review services for the Waterloo Dam
Rehabilitation and River Wall Construction, and for additional design services for the Cedar Valley
Riverfront Renaissance Waterloo Vision Iowa Projects; and
WHEREAS, the Client and the Consultant now desire to enter into Supplemental Agreement No. 11
for that portion of the project including electrical service modifications for the Cattle Congress
Sanitary Pump Station.
NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement
as follows:
I. Project Description
The project consists of the replacement of the existing electrical service to the Cattle
Congress Sanitary Sewer Pump Station, which includes a new transformer from
MidAmerican Energy, a new transformer pad and replacing the electrical service from the
transformer pad to the pump station building, including installation of a disconnect switch
and distribution panel. This work will be completed during construction of the Cattle
Congress Storm Water Pump Station.
II. Scope of Services
The Scope of Services will encompass and include services, materials, equipment,
personnel and supplies necessary to provide design survey, electrical plans and
specifications, site plan development and project coordination. The Scope of Services is
further defined as follows:
Task 1 - Field Survey and Base Mapping. This task includes field survey and development
of base mapping to be utilized for the design of the project.
Tasks 2-4 - Final Design. These tasks include the preparation of final construction
drawings for the project, which will be incorporated into the Cattle Congress Storm Water
Pump Station documents. Included in the Final Design are the following tasks:
Task 2 - Site Plan Development
Task 3 - Electrical Plan and Specifications
Task 4 - Quantities and Estimate Reference Notes
Task 5 - Project Administration. This task includes a site visit, coordination with
MidAmerican Energy and one (1) project meeting. The task also includes answering
questions from contractors prior to bidding.
III. Compensation
Compensation for the above services will be on an hourly basis in accordance with Part III
of the original agreement. Estimated fee for the services is Nine Thousand Dollars
($9,000.00) and shall not be exceeded without authorization of the Client. The fee will be
integrated with the fee authorized in Supplemental Agreement No. 1.
Page 2
A=COM
IV. In all other respects, the obligations of the Client and the Consultant shall remain as
specified in the Professional Services Agreement dated September 22, 2003; and
subsequent amendments.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 11
as of the dates shown below:
CITY OF WATERLOO, IOWA
By: Date 1' M(b
Ernest G. Clark
Mayor
ATTEST:
By:
AECOM TECHNIC RVICES, INC.
By
Joe A. Becker
Vice President
Date December 3, 2010
L:\work\AN\AGREE\SUPPLE\SAI1 CVRiverRenCattleCongressPumpStation.doc
Page 3