HomeMy WebLinkAboutCardinal Construction-12/13/2010Document G704' - 2000 Certificate of Substantial Completion PROJECT: PROJECT NUMBER: 08068/ (Name and address) CONTRACT FOR: General Construction New Fire Station #2 for the City of CONTRACT DATE: September 14, 2009 Waterloo, IA. TO OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 TO CONTRACTOR: (Name and address) Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 OWNER: 0 ARCHITECT: 0 CONTRACTOR: 0 FIELD: 0 OTHER: ❑ PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: StruXture Architects, LLC Date of Commencement November 4, 2010 ARCHITECT BY DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Thirty (30) days from the above date of Substantial Completion. Cardinal Construction, Inc. % , _ ,- November 10, 2010 CONTRACTOR DATE The Owner accepts the Work or designated portioassume full possession at 12:01 a.m. (time) on October 29, 2010 (date). City of Waterloo OWNER DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owners and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Owner shall be responsible for maintenance, heat, utilities, insurance and damage caused by the Owner's personnel. AIA Document G704T" —2000. Copyright ©1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA© Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 10:09:14 on 11/04/2010 under Order No.6812383453_1 which expires on 08/21/2011, and Is not for resale. User Notes: (1162163297) October 12, 2010 Mike Jackson Cardinal Construction 531 Commercial Street Waterloo, IA 50704 Re: Waterloo Fire Station #2 The following are punch list items from my walk-thru of October 12, 2010. General Exterior: Clean roofs of debris. Clean glass. Complete installation of pressure plates on aluminum windows. Light fixture above opening #127B appears to be scratched. Remove excess mortar from north jamb at opening #202A. General Interior: Install screens on all operable windows. Verify that interior of all cabinetry has been cleaned. Clean interior side of glass. Install sprinkler head covers. Clean window framing. 101: Replace damaged ceiling tile. 102: Replace damaged ceiling tile 103: Adjust wall cabinet door on the south end. It appears to be racked. 104: Replace damaged ceiling tile at detector. Replace rough cut ceiling tile along north and east walls. 105: Replace damaged ceiling tile at diffuser. Remove white marking on burnish block below speaker knob. Touch up or replace ceiling tile along the south wall. 106: No items at this time. STRUTURE (sv ARCHITECTS 314 E. 4th Street Waterloo, A 50703-4704 tel: 319.234.1515 fax: 319.234.1517 STRUTURE ARCHITECTS 107: No items at this time 108: Clean 109: Clean room Replace ceiling tile at sprinkler head. Caulk at door head. Clean ceiling grid along north wall. Install tile base at cabinetry. 110: No items at this time. 111: Clean room 112: Clean Install glass in door. 113: Clean exposed overhead pipes of construction residue. Clean top of switch box adjacent to door. Paint bottom of access door. Install glass in door. 114: Replace stained ceiling tile above opening #115A. Replace damaged ceiling tile along north wall. 115: No items at this time. 116: This room was deleted for ADA shower compliance. 117: Clean ceiling grid adjacent to south wall. Remove marks on wall tile at shower head/controls. Paint bottom of access door opening #118B. 118: Clean Install caulk in oversized floor joints adjacent to wall. 119: Complete installation of glazing in opening adjacent to Vestibule. Remove utility knife blade from interior of exit light above opening #119B. Replace damaged ceiling tile above opening # 120A. Install glass in door of opening#119B. 121: Complete glass installation at opening #121B 314 E. 4th Street Waterloo, IA 50703-4704 tel: 319.234.1515 fax: 319.234.1517 STR J TURF 122: 10.7 No items at this time. 123: Paint exterior opening lintels. Paint opening above opening #121B. Complete glass installation at opening #121B. Replace damaged ceiling tile above tackboard on west wall. 124: Replace damaged ceiling tile above opening #124A. 125: Clean 126: Paint exterior opening lintels. Install additional grommet horizontally in cabinet on north wall or paint black if grommet will not cover exposed particle board. Install glass in opening #126A. Complete painting on precast above the counter on the south wall and carry the same finish to below the counter. Paint exposed portion of counter support brackets at each end. Clean ceiling grid. 127: Install glass in transom of opening #127B. Install light fixture in fire pole landing area. Install fire pole landing pad. Install ceiling tile above opening # 124A. 201: Install aluminum trim piece at west end of the north curtain wall. Complete caulking adjacent to window sill on the east wall. 202: Clean room Clean support bracket of computer station in SW corner. 203: Clean 204: Install tile base on cabinet. Remove marks on tile above mirror. Remove marks on tile at light switch. Caulk or grout at ceiling grid to match. 205 — Pole Room: Clean Install escutcheon at top of fire pole. Paint precast walls. ARCHITECTS 314 E. 4th Street Waterloo, IA 50703-4704 tel: 319.234.1515 fax: 319.234.1517 STRUXTURE If you have any questions or concerns regarding these items please contact me as soon as possible. Sincerely, StruXture Architects Daniel C. Charmer, AIA xc. Debra Anderson — City of Waterloo Brent Waskow - MODUS ARCHITECTS 314 E. 4th Street Waterloo, IA 50703-4704 tel: 319.234.1515 fax: 319.234.1517 I j { OBSERVATION REPORT # 1 PROJECT: Waterloo Fire Station PROJECT NUMBER: 09-030 DATE: Oct. 14, 2010 To: StruXture FROM BrentLWaskow/David W. Kline, P.E. NOTE { GENERAL ITEMS OBSERVATION DATE Oct. 13, 2010 Submit as -built drawings as required by the architectural specifications. Submit operation and maintenance manuals for mechanical, electrical, plumbing and telecommunication systems as required by the architectural specifications. Instruct owner in operation and maintenance of mechanical, electrical, plumbing and telecommunication systems as required by the architectural specifications. Ensure equipment warranty information has been completed and given to the owner as required by the architectural specifications. r-'ECHANICAL ITEMS Clean all plumbing fixtures per Specification Section 22 4000. Clean out all sanitary sewers to remove any debris prior to substantial completion (trench drains, floor drains, etc). Submit balancing report as per Specification Section 23 0593. Clean filters per Specification Section 23 8101. The supply air diffuser core appears bend/not installed flat. Repair or replace as required. Verify the bottom of the shower head is mounted at 77" above the finished floor. Move to specified height as required. Verify the bottom of the shower head is mounted at 77" above the finished floor. Move to specified height as required. 214 EAST FOURTH STREET r 235 0380 1 TEL WATERLOO, IOWA 50703 319 it 235 0544 J FAX 1717 INGERSOLL AVE. STE. III 251 7280 1 TEL DES MOINES, IOWA 50309 515 it 25 1 7349 J EAx MODUS-ENG.COM TOILE LO OBSERVATION REPORT # 1 cs_ N° ED Remove marks on the tile around shower controls and shower head. Exhaust hood is not operational when the power is activated at the exhaust switch on the hood. Coordinate with the electrical contractor. The electrical contractor was instructed to remove the motor starter and wire the unit similar to how the AAON startup technician had the unit wired. Replace damaged aluminum filter. The filter is dented and scratched. Install thermostat for radiant floor heating. The sprinkler contractor shall install all concealed head sprinkler cover plates. Sprinkler head cover plates are to be installed flush with the finished ceilings. CTR .A, L ITEM S Submit electrical service ground rod test report per Specification Section 26 0529. Provide engraved plastic nameplates and typed circuit directory for all branch and distribution panels per Specification Section 26 2416. Clean all light fixtures and replace failed lamps per Specification Section 26 5100. Label data, fiber, and voice cables/outlets in accordance with owner's standards. Submit data and fiber test results Submit a hard copy and electronic file of data, fiber, and voice system as -built drawings. As -built information shall include actual device locations and device addresses. Submit a hard copy and electronic file of fire alarm as -built drawings. As -built information shall include locations of initiating devices, signaling appliances, shut down relays. and offline devices; including all device addresses. Install wiring to the hot water recirculation pump. Provide a label for the boiler emergency shutdown pushbutton. Remove cover on smoke detector. Install paging speaker. 214 EAST FOURTH STREET 235 0650 I TEL WATERLOO, IOWA 50703 319 1 235 0844 I FAX 1717 INGERSOLL AVE. STE. III 251 7280 l rEL DES MOINES, IOWA 50309 515 j` 25 I 7349 J FAX MODUS-ENG.COM reams KA 1 i Q { OBSERVATION REPORT # 1 cr,r-rr-,,u • Install paging speakers and paging system strobe light. • Align devices and faceplates under computer desk. e Remove smoke detector cover. Remove smoke detector cover. Install the over -bed wall light when the fixture arrives. • Connect the two 2x2 fixtures to the three-way switches. Connect the 2x4 fixture to the single pole switch. Complete the exhaust fan/makeup air unit wiring. Install a GFCI receptacle for the microwave. Align devices and faceplates in the room, especially on the south wall. Install all devices. Replace the light fixture with a type RI compact fluorescent fixture. Install the light fixture above the exterior door. Touch up paint on unit heater grille where scratched near screws during installation. E,E1•3K 2:5 G Install all devices. Install the light fixture nearest the northeast door. Trim the cables hanging from the lights. Remove cover on smoke detector. Replace failed lamps/ballasts. Install gas detection system detectors. Complete the installation of the door access system. Provide a cover for the open box near the ceiling by the northwest door. Install the 208V receptacle. z Install trippers for the time clock. Install ground jumper across the water meter. Remove smoke detector cover. Install the type A2 flagpole lights. 214 EAST FOURTH STREET { 235 0650 } TEL WATERLOO, IOWA 50703 319 235 0644 FAX 1717 INGERSOLL AVE. STE. 111 ( 251 7200 1 TEL DES MOINES, IOWA 50309 51511251 7349 1 FAX MODUS-ENG.COM 0 JT • F