Loading...
HomeMy WebLinkAboutKWS Inc-11/22/2010Contract & Final Acceptance Amount Modification Date: November 15, 2010 Project: US 218 & 18th/Williston Traffic Safety Improvements Traffic Operations Project Number: TRF -150 Iowa DOT Project Number: CS -TSF -8155(706)--85-07 Contractor: KWS of Cedar Falls, Iowa The construction contract KWS and the final acceptance amount with for the above mentioned project is here by modified as described in this Modification Document the effective date of which is the date it signed by the Mayor of Waterloo. Reason For Modification: No loops were shown on the plans but the contractor was asked to provide the loop detectors. Contractor provided them. The vendor recently invoiced the contractor because the plans did not mention existence of the loops. The original price was quoted based on having no loop detectors. Items & Cost Number Item Unit price Unit Total Item Price 1 Rack Mount 2 -Channel Loop Detector Amplifier $235.00 EA $1645.00 2 Shipping $21.14 LS $21.14 Total: $1666.14 Contract Modification: Contract is hereby modified to include 7 loop detectors. Final construction cost: The final construction cost as presented to Council on September 20, 2010 is now increased to $99,648.14 to reflect the cost of 7 loop detectors. For KWS Electric: For City of Waterloo: Name: Signature: Title: ONEX1r---- V.P. Date: 444 Date: " he -,,P- 1(Q�(y /(/ Veyc