HomeMy WebLinkAboutAecom Technical Services-11/22/2010A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com U.S. HIGHWAY 63 IMPROVEMENTS NEWELL STREET TO DONALD STREET FINAL DESIGN MODIFICATION WATERLOO, IOWA SUPPLEMENTAL AGREEMENT NO. 4 WHEREAS, a Professional Services Agreement was entered into by the City of Waterloo, Iowa ("City"), and AECOM Technical Services, Inc., formerly Earth Tech, Inc. ("Consultant"), of Waterloo, Iowa, dated April 3, 2006, for the alternative evaluation, traffic analysis, environmental documentation, preliminary design, final design and construction review for improvements on U.S. Highway 63 between the U.S. 218 Interchange and Donald Street in Waterloo, Iowa; and WHEREAS, Preliminary Engineering (NHSX-63-6(69)-3H-07) was defined and authorized in said agreement dated April 3, 2006; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 1 dated July 27, 2007, for engineering services during the construction phase of the U.S. Highway 63 — Westfield Avenue Connection Project; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 2 dated December 14, 2007, to increase the Estimated Actual Costs for Task 15 — Management of Contaminated Subsurface Soil provided by Weston Solutions, Inc., due to delay in construction progress related to inclement weather conditions and management/disposal for excess spoil; and WHEREAS, the City and Consultant entered into Supplemental Agreement No. 3 dated August 19, 2010, to include the final design of a 4 -lane highway between Newell Street and Donald Street in Waterloo, Iowa, in accordance with the Preliminary Plans completed in November 2009; and WHEREAS, the City and Consultant desire to amend the previous agreements to remove the water main design from the Scope of Services. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. SCOPE OF SERVICES The Scope of Services in Supplemental Agreement No. 3 is modified such that Task 31, Water Main Design, which follows, is removed. Task 31 - Water Main Design. This task includes preparation of final plans and details for the replacement of the existing north -south water main between Parker Street and Donald Street. Included are the replacement of valves, valve boxes, fire hydrants and reconnection of existing live water services. Also included is the design of a temporary PVC water main to maintain water service during construction. It is anticipated that the new permanent water main will be increased in size to a 12" main. This task also includes preparation of the Iowa DNR construction permit application. II. TIME OF BEGINNING AND COMPLETION All work under this Supplemental Agreement No. 4 shall be completed within the schedule defined in Supplemental Agreement No. 3. A=COM Page 2 111 COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement, as stated below and as shown in Attachment A, are integrated with Supplemental Agreement No. 3. S.A. No. 3 S.A. No. 4 Revised Total Estimated Actual Costs $493,300.00 ($70,100.00) $423,200.00 Fixed Fee 55,600.00 ( 9,000.00) 46,600.00 Contingency 45,800.00 ( 7,000.00) 38.800.00 Maximum Amount Payable $594,700.00 ($86,100.00) $508,600.00 IV. In all other aspects, the obligations of the City and Consultant shall remain as specified in the Professional Services Agreement dated April 3, 2006, and subsequent amendments. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 4 as of the dates shown below: AECOM TECHN _ SERVICES, INC. By Joe A. Becker Vice President CITY OF WATERLOO, IOWA By _/e/f4eAtt7t4/ rnest . Clark Mayor IOWA DEPARTMENT OF TRANSPORTATION ACCEPTED FOR AUTHORIZATION By Robert Welper, P.E. Local Systems Engineer District 2 L:\work\ADM I N\AGREE\SUPPLE\SA4Hwy63.doc Date November 17, 2010 Date NAit 2)2\1,Poid Date / a/U 3/02 Attachment A U.S. HIGHWAY 63 IMPROVEMENTS NEWELL STREET TO DONALD STREET WATERLOO, IOWA FINAL DESIGN MODIFICATION - (REMOVE WATER MAIN DESIGN) Cost Analysis I. Direct Labor Cost (AECOM Technical Services) Category Hours Rate/Hour Amount Senior Professional 20 $80.00 $1,600.00 Project Professional 220 $53.50 $11,770.00 Staff Professional 40 $37.50 $1,500.00 Professional 0 $30.75 $0.00 CADD Operator II 240 $28.50 $6,840.00 CADD Operator I 202 $20.20 $4,080.40 Senior Technician 0 $30.60 Technician 0 $22.70 $0.00 Project Support 26 $25.60 $665.60 $26,456.00 748 II. Payroll Burden and Overhead Provisional Costs 165.00% $43,652.40 III. Direct Project Expenses Category Unite Rate/Unit Amount Mileage 0 0.5 0.00 Per Diem 0 40.00 0.00 Lodging 0 80.00 0.00 B/W Copies 0 0.06 0.00 Color Copies 0 0.12 0.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 0.00 IV. AECOM Technical Services Estimated Actual Costs Rounded V. Subcontract Expense na na $0.00 $70,108.40- $70,100.00 $0.00 VI. Estimated Actual Costs $70,100.00 VII. Fixed Fee $9,000.00 VIII. Contingency $7,000.00 AECOM Technical Services $7,000.00 na IX. Maximum Amount Payable $86,100.00