Loading...
HomeMy WebLinkAboutAecom Technical Services-11/1/2010AoCOM October 19, 2010 Honorable Mayor Buck Clark and City Council 715 Mulberry Street Waterloo, Iowa 50703 Subject: Waterloo WPCF Aeration Equipment Replacement City Contract No. 788 AECOM #113632.31 Dear Mayor and Council: By this letter, we hereby state: AECOM 319.232.6531 tel 501 Sycamore Street 319.232.0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com 1. To the best of our knowledge and belief, based on observations of city staff and AECOM staff during construction, the contractor, Hauptly Construction Co., has performed the work in accordance with the plans and specifications and contract documents in effect for the above -referenced project. 2. The total cost of the completed work is $443,013.96. o0oi110 . "al,,,,1 °• •1lt .. eq ''''�.,, , 0�.•*\GENsFa s,�' 9509 '° • ' —Abe SS'ONAL itGc/ °`` %num nuuuoo�` .' I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the state of Iowa. ���`` �� (6;67 � RO:ERT E. BAMSEY, P. License No. 9509 Date My license renewal date is December 31, 2011. Pages or sheets covered by this seal: Date Issued: L:\work\project\113632\admn\31 \Statement of Completion.doc Contractor Pay Request #3 Aeration Equipment Replacement Waterloo Water Pollution Control Facility City Contract # 788 AECOM Project # 113632.31 Contractor: Robert C. Hauptly Construction Co. Period: August 28, 2010 through October 15, 2010 Hauptly Consruction Co. Total Earned to Date Less 5% Retainage Subtotal Less Previous Payments Amount Due This Estimate L:\work\project\113632\eng\Aeration Pay request\Aeration Pay Request #3.xlsx $443,013.96 $22,150.70 $420,863.26 $179,777.66 $ 241,085.60 Contract Completed % of Item Item Description Units Unit Price Quantity Amount Quantity Amount 1 Satellite Basin No. 1- Remove & Replace Diffuser Membrane/Frames, Air Distribution Headers and Laterals in Aerobic Zone Nos. 1- 7 LS $ 295,000.00 1 $ 295,000.00 170,000 100% 2 Satellite Basin No. 1- Remove & Replace Diffuser Membrane/Frames, Air Distribution Headers and Laterals in Anoxic Zones Nos. 1-5 and Aerobic Zone No. 8 LS $ 18,000.00 1 $ 18,000.00 18,000 100% 3 Satellite Aeration Basin No. 2 - Remove and Replace Diffuser Membranes/Frames in Aerobic Zones Nos. 1-7 Each $ 45.85 2072 $ 95,001.20 2072 $ 95,001.20 100% 4 Easton Aeration Basin No. 1- Remove and Replace Diffuser Membranes/Frames in Aerobic Zones 1-3 Each $ 46.09 716 $ 33,000.44 716 $ 33,000.44 100% 5 Easton Aeration Basin No. 2 -Remove and Replace Diffuser Membranes/Frames in Aerobic Zones 1-3 Each $ 46.09 716 $ 33,000.44 716 $ 33,000.44 100% 6 Easton Aeration Basin No. 3 -Remove and Replace Diffuser Membranes/Frames in Aerobic Zones 1-3 Each $ 46.09 716 $ 33,000.44 716 $ 33,000.44 100% 7 Easton Aeration Basin No. 4 - Remove and Replace Diffuser Membranes/Frames in Aerobic Zones 1-3 Each $ 46.09 716 $ 33,000.44 716 $ 33,000.44 100% 8 Extra Work - CO #1 & #2 LS 1 $ 28,011.00 100% Hauptly Consruction Co. Total Earned to Date Less 5% Retainage Subtotal Less Previous Payments Amount Due This Estimate L:\work\project\113632\eng\Aeration Pay request\Aeration Pay Request #3.xlsx $443,013.96 $22,150.70 $420,863.26 $179,777.66 $ 241,085.60