HomeMy WebLinkAboutRobert C Hauptly Construction-11/1/2010CHANGE ORDER NO. 2 Owner: City of Waterloo, Iowa Date: October 19, 2010 Project Aeration Equipment Replacement - Waterloo Water Pollution Control Facility Owner's Contract No.: No. 788 Contractor: Robert C. Hauptly Construction Co. Date of Contract Start: $ You are directed to make the following changes in the Contract Documents. Description: See Attached List of Extra Work (Easton Aeration Basins No. 2, No. 3 and No. 4 Reason for Change Order: 1) Directed by City WPCF Staff - Cleaning and Dewatering Basins and Repair Miscellaneous Items Discovered During Rehabilitating the Aeration System (+$4,350) 2) Delete Work in Satellite Basin No. 2 as a Result of Inspection by Equipment Manufacturer (-$125,000) CONTRACT PRICE CONTRACT TIMES To Substantial To Final Completion Completion Original: $ 540,002.96 Original: Previous C.O.s (ADD/DEDUCT): $ 23,661.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DEDUCT): $ 120,650.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 443,013.96 REVISED: Revised Completion Date: It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED By: er (Authorized Signature ACCEPTED: By:f"...,61,e/ ontractor (Authorized Signature) ft (7 Date: Date: AECOM 113632.31 2 Project No. Change Order No. L:\work\project\113632\admn\31 \CO2.doc