Loading...
HomeMy WebLinkAboutAecom Technical Services-11/1/2010 (2)AZ -COM Project Description AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com IDOT VERTICAL INFRASTRUCTURE PROJECTS - FY 2011 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA The project is described as the projects associated with the Iowa Department of Transportation FY 2011 Vertical Infrastructure Projects. Projects identified in the grant include the following: 1) Painting Hangar No. 1, Hangar No. 5 and Snow Removal Equipment (SRE) Building 2) Replacement of Siding and Roofing on Existing T -Hangar A Scope of Services The work to be performed by the Consultant includes the following tasks: 1. Data Collection and Review - This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and utility information will be compiled as background information for the project. As part of this task a field survey will be performed to collect dimensional sketches as necessary. The Client shall coordinate with lease holders of each of the hangar units so that the Consultant can gain access to these in a timely manner for the purpose of survey and photographic documentation of the hangar space. 2. Final Design - This task consists of the preparation of the final bid documents for this project, including specifications, drawings (if required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications - This task consists of the preparation of specifications for the project. The specifications will be in compliance with current Iowa Department of Transportation and Federal Aviation Administration requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost - This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by the Consultant represents the Consultant's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither the Consultant nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, the Consultant cannot and does not guarantee that bids will not vary from any statement of Probable Construction Cost or other cost estimates prepared by the Consultant. 5. Quality Review - This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel that are not directly involved in the project. A=COM 6. Bid Assistance - This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. 7 Bid Document Interpretation - This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review - This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration - This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. Compensation Compensation for work defined in the above Scope of Services will be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed for a not -to -exceed fee of Nine Thousand Dollars ($9,000.00) without authorization of the Client. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services, Inc.(formerly Earth Tech, Inc.), and the Waterloo Airport Board dated December 5, 2008. APPROVED: CITY OF WATERLOO B Date Ernest G. Clark Mayor Novtyvt6y- 1,700 L:lworkWDMI NWGREE\PROF\WatAir2011 I DOTVertI nfra Proj.doc APPROVED: AECOM TECHNICAL SERVICES, INC. By Joe A. Becker Vice President Date October 26, 2010