CITY OF WATERLOO, IOWA
CHANGE or EXTRA WORK ORDER NO. 8
PROJECT: F.Y. 2008 E. 4T" STREET RECONSTRUCTION AND STREETSCAPE IMPROVEMENTS
CONTRACT NO. 742
Date Prepared:
October 18, 2010 AMOUNT: $31,213.44 INCREASE
TO: PETERSON CONTRACTORS, INC. , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated June 16, 2008 .
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering change or extra work:
As -built quantities varied for some bid items.
C. Settlement for cost of work to be made as follows:
Compensation already made to contractor through original bid items.
See attached summary.
NET INCREASE $31,213.44
CITY OF , L' ERLOO
BY: /1 aw PETERS CONTRACTORS, INC.
ATTEST:
Change Order No. 8
Date . CO COR
_QTA%irolN. LQ.(L�
Date
cordell q. peters=
PRINTED NAME:
Date
TITLE:
APPROVED:
City Engineer
Contot 742
Page 1 of 1
F.Y. 2008 E. 4TH STREET RECONSTRUCTION & STREETSCAPE IMPROVEMENTS --- CONTRACT NO. 742
QUANTITY ADJUSTMENTS
BID ITEM
DESCRIPTION
UNIT
PCI
PLAN
FINAL
INCR/DECR
INCR/DECR
UNIT $
QUANTITY
QUANTITY
QUANTITY
AMOUNT
DIVISION I - STREET RECONSTRUCTION
1
REMOVE/REPLACE MISC. PCC CURB AND GUTTER,?", C-4
LF
$25.00
100.0
102.1
2.1
$52.50
2
PCC DRIVEWAY APPROACH AND S/W, 6", A-4
SY
$30.60
50.0
194.6
144.6
$4,424.76
3
CONCRETE PAVEMENT REMOVAL
SY
$6.50
5,403.0
5,354.6
(48.4)
($314.60)
4
DRIVEWAY PAVEMENT REMOVAL
SY
$6.50
50.0
104.1
54.1
$351.65
5
PARTIAL DEPTH PCC PATCH, TYPE A
SF
$23.00
185.0
127.0
58.0
$1,334.00
6
TYPE E -1-C INLET
EACH
$3,100.00
8.0
8.0
0.0
$0.00
7
STORM SEWER, 2000D, 12"
LF
$36.00
36.0
65.0
29.0
$1,044.00
8
DRAIN TILE, 4"
LF
$13.00
70.0
178.0
108.0
$1,404.00
9
RF -19C, INLET OUTLET DETAIL RODENT GUARD
EACH
$180.00
8.0
10.0
2.0
$360.00
10
REMOVE EXISTING STRUCTURE
EACH
$400.00
8.0
8.0
0.0
$0.00
11
PCC PAVEMENT, 7", C-4
SY
$40.00
5,403.0
5,377.9
$1,004.00
12
EXCAVATION
CY
$11.00
595.0
595.0
0.0
$0.00
13
SUBGRADE PREPARATION
SY
$1.50
5,640.0
5,640.0
0.0
$0.00
14
GEOGRID
SY
$4.50
550.0
0.0
550.0
$2,475.00
15
MODIFIED SUBBASE
TON
$20.00
1,200.0
1,667.70
487.7
$9,354.00
16
LINSEED OIL TREATMENT
SY
$2.40
3,570.0
2,524.3
(1045.7)
($2,509.68)
17
RELOCATE STREET LIGHT, CONDUIT, WIRING, ETC.
LS
$2,000.00
1.0
1.0
0.0
$0.00
18
PAVEMENT MARKINGS
STA
$50.00
18.75
0.0
(18.75)
($937.50)
19
CONSTRUCTION SURVEY
LS
$6,000.00
1.0
1.0
0.0
$0.00
20
TRAFFIC CONTROL
LS
$7 500.00
1.0
1.0
0.0
$0.00
4002
STORM MANHOLE, MODIFIED
EACH
$2,500.00
1.0
1.0
0.0
$0.00
6002
REMOVE AND REPLACE 7" PAVING (UTILITY PATCH)
LS
$1,650.00
1.0
1.0
0.0
$0.00
TOTAL DIVISION I INCREASE
$8,416.13
DIVISION II - STREETSCAPE IMPROVEMENTS
1
MOBILIZATION - DIVISION II
LS
$35,000.00
1.0
1.00
0.0
$0.00
2
EXCAVATION, CLASS 10
CY
$12.00
679.3
679.3
0.0
$0.00
3
SUBGRADE PREPARATION
SY
$1.75
4,641.0
4,641.0
0.0
$0.00
4
TOPSOIL, FURNISH AND SPREAD
CY
$35.00
20.3
10.7
(9.6)
($336.00)
5
MODIFIED SUBBASE
TON
$22.00
938.3
1,298.50
360.2
$7,924.40
6
PCC SIDEWALK, 4"
SF
$3.00
29,845.8
33,370.2
3524.4
$10,573.20
7
PCC PLANTER CURB
LF
$25.00
353.0
176.4
176.6
$4 415.00
8
BRICK PAVERS (CONCRETE)
SF
$6.35
6,217.5
6,650.0
432.5
$2,746.38
9
GEOGRID REINFORCEMENT
SY
$4.50
313.3
388.9
75.6
$340.20
10
PLASTIC PAVER EDGING
LF
$1.50
70.0
39.5
30.5
$45.75
11
REMOVALS, AS PER PLANS
LS
$14,000.00
1.0
1.00
0.0
$0.00
12
REMOVAL OF PAVEMENT
SY
$7.50
414.0
597.1
183.1
$1,373.25
13
REMOVAL OF SIDEWALK
SF
$1.50
38,595.6
42,310.8
3715.2
$5,572.80
14
STRUCTURAL SIDEWALK REPAIR AND OVERLAY
SF
$15.00
3,240.0
3,530.4
290.4
$4,356.00
15
SAFETY CLOSURES
LF
$3.50
3,000.0
2,521.0
479.0
$1,676.50
16
REMOVE DECORATIVE LIGHT POLE BASE
EA
$3 500.00
12.0
12.0
0.0
$0.00
17
NEW 5 -GLOBE LIGHT FIXTURE, INCLUDING WIRING, ETC.
EA
$9,000.00
1.0
1.0
0.0
$0.00
18
REGLOBE EXISTING 5 -GLOBE LIGHT FIXTURE
EA
$1,000.00
3.0
4.0
1.0
$1,000.00
19
REPAINT EXISTING 5 -GLOBE LIGHT FIXTURE
EA
$650.00
35.0
31.0
(4.0)
($2,600.00)
Page - 1
Page - 2
F.Y. 2008 E. 4TH STREET RECONSTRUCTION & STREETSCAPE IMPROVEMENTS -- CONTRACT NO. 742
QUANTITY ADJUSTMENTS
BID ITEM
DESCRIPTION
UNIT
PCI
PLAN
FINAL
INCR/DECR
INCR/DECR
UNIT $
QUANTITY
QUANTITY
QUANTITY
AMOUNT
DIVISION II - STREETSCAPE IMPROVEMENTS
20
TREE GRATES
EA
$1,850.00
4.0
4.0
0.0
$0.00
21
TREE GRATE FRAMES
EA
$950.00
37.0
37.0
0.0
$0.00
22
SHADE TREES
EA
$500.00
13.0
15.0
2.0
$1,000.00
23
SHRUBS
EA
$55.00
86.0
44.0
(42.0)
($2,310.00)
24
BED PREP, GRAVEL MULCH, AND FABRIC
SF
$3.25
549.0
288.0
(261.0)
($848.25)
25
TURFGRASS SOD
SF
$1.50
1,520.0
525.0
(995.0)
($1,492.50)
26
BENCHES
EA
$1,500.00
10.0
10.0
0.0
$0.00
27
WASTE RECEPTACLES
EA
$1,800.00
5.0
5.0
0.0
$0.00
28
BIKE RACKS
EA
$1,700.00
5.0
5.0
0.0
$0.00
1001
SCHEDULE 80, 2 INCH PVC
LF
$8.60
3,018.0
3,256.0
238.0
$1,570.80
1002
CONDUCTOR, #4
LF
$2.75
12,078.0
10,456.0
(1622.0)
($4,460.50)
1003
CONDUCTOR, #6
12 TWISTED PAIR 19 AWG W/ COPPER SHIELD
LF
LF
$2.48
$3.30
2,654.0
1,007.0
2,614.0
918.0
(40.0)
(89.0)
($99.20)
($293.70)
1004
1005
HANDHOLE
EACH
$660.00
3.0
2.0
(1.0)
($660.00)
1006
CONDUCTOR, #8
LF
$2.20
2,022.0
2,304.0
282.0
$620.40
1007
ADJUST TO ITEM 16 - REM DECORATIVE LIGHT POLE BASE
EACH
($825.00)
12.0
12.0
0.0
80.00
2001
POWER PLANT RENTAL
MONTH
$775.00
2.0
3.0
1.0
$775.00
2002
FUEL FOR POWER PLANT
DAY
$50.00
60,0
98.0
38.0
$1,900.00
2003
CARE OF POWER PLANT
DAY
$100.00
60.0
98.0
38.0
$3,800.00
3001
PREFORMED LOOP DETECTOR
EACH
$880.00
4.0
4.0
0.0
$0.00
3002
2C #14 LOOP WIRE
LF
$1.10
800.0
800.0
0.0
$0.00
3003
12C #14 SIGNAL WIRE
LF
$3.30
600.0
475.0
(125.0)
($412.50)
3004
#6 GREEN GROUND WIRE
LF
EACH
$2.75
$125.62
600.0
24.0
475.0
22.0
(125.0)
(2.0)
($343.75)
($251.24)
4001
REPLACE ROCK MULCH IN EXISTING TREE PITS
5001
PCC DRIVEWAY APPROACH AND SA/V, 6", A-4
SY
$30.60
150.0
124.8
(25.2)
($771.12)
5002
BASEMENT TOP AT 106 E. 4TH ST.
L.S.
$1,100.00
1.0
1.0
0.0
$0.00
6001
TREE GRATE MODIFICATIONS (PER TREE)
EACH
$165.00
33.0
33.0
0.0
$0.00
6003
SIDEWALK CAP AT BUILDING FOR 110 E. 4TH ST.
L.S.
$550.00
1.0
1.0
0.0
$0.00
7001
MISCELLANEOUS ASPHALT PATCH
TON
$195.00
7.00
6.12
(0.88)
($171.60
7002
FURNISH AND INSTALL BANNER ARMS
LS
$230.00
1.0
1.0
0.0
$0.00
7003
LIGHT BASE FILL IN AND REPAIR
LS
$2,090.00
1.0
1.0
0.0
$0.00
TOTAL CONSTRUCTION COST BASE BID DIVISION II
$22,364.82
ADD ALTERNATE 1 - DIVISION II
29
CLAY BRICK PAVERS INSTEAD OF CONCRETE PAVERS
SF
$1.00
6,217.5
6,650.0
432.5
$432.50
DIVISION I
$8,416.13
DIVISION II + ALTERNATE 1
$22,797.31
TOTAL INCREASE
$31,213.44
ORIGINAL CONTRACT AMOUNT
$876,375.98
CHANGE ORDER NO. 1
859,566.72
CHANGE ORDER NO. 2
$10,550.00
CHANGE ORDER NO. 3
$8,030.00
CHANGE ORDER NO. 4
$5,514.88
CHANGE ORDER NO. 5
$5,690.00
CHANGE ORDER NO. 6
$7,645.00
CHANGE ORDER NO. 7
$3,685.00
CHANGE ORDER NO. 8 (INCREASE -DECREASE)
$31,213.44
FINAL CONTRACT AMOUNT
$1,008,271.02
PAYMENTS TO CONTRACTOR
ESTIMATES 1-18
$957,857.49
RETAINAGE
$50,413.53
TOTAL
$1,008,271.02
CITY OF WATERLOO, IOWA
CHANGE or EXTRA WORK ORDER NO. 8 /
PROJECT: F.Y. 2008 E. 4T" STREET RECONSTRUCTION AND STREETSCAF
CONTRACT NO. 742
Date Prepared:
-s7)
October 18, 2010 AMOUNT: $31.213.44 INCREAsc
TO: PETERSON CONTRACTORS. INC. , Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated June 16, 2008 .
A. Description of change to be made or extra work to be done:
Adjust original construction quantities to actual construction quantities.
B. Reason for ordering change or extra work:
As -built quantities varied for some bid items.
C. Settlement for cost of work to be made as follows:
Compensation already made to contractor through original bid items.
See attached summary.
NET INCREASE $31,213.44
CITY OF RLOO
BY: -vi 1d /.4710 PETER •_, CONTRACTORS INC.
ATTEST:
City CIe k
Change Order No. 8
D to . CO OR
Date
B
PRINTED NAME:
Mordell q. peterson
Date
TITLE:
APPROVED:
City Engineer Date
Cont _n.o.t .;o. 742 Page 1 of 1
W
W V
W 01AwN-+0
13 REMOVAL OF SIDEWALK
14 ?STRUCTURAL SIDEWALK REPAIR AND OVERLAY
11 REMOVALS, AS PER PLANS
12 1REMOVAL OF PAVEMENT
9 _GEOGRID REINFORCEMENT
10 PLASTIC PAVER EDGING
1 7 1PCC PLANTER CURB
8 BRICK PAVERS (CONCRETE)
._.,_ 5_J[MODIFIED SUBBASE
8 PCC SIDEWALK, 4" _
_ 3 SUBGRADE PREPARATION
4 TOPSOIL, FURNISH AND SPREAD
1 MOBILIZATION - DIVISION ti
2 EXCAVATION, CLASS 10
DIVISION II - STREETSCAPE IMPROVEMENTS
TOTAL DIVISION I INCREASE
8002 REMOVE AND REPLACE 7" PAVING (UTILITY PATCH)
20 TRAFFIC CONTROL
4002 STORM MANHOLE, MODIFIED
W W
i
16 LINSEED OIL TREATMENT
17 RELOCATE STREET LIGHT, CONDUIT, WIRING, ETC.
14 GEOGRID
15 MODIFIED SUBBASE
12 EXCAVATION
13 SUBGRADE PREPARATION
8 DRAIN TILE, 4"
9 RF -19C, INLET OUTLET DETAIL (RODENT GUARD)
8 TYPE E -1-C INLET
7 STORM SEWER, 2000D, 12"
4 DRIVEWAY PAVEMENT REMOVAL
5 PARTIAL DEPTH PCC PATCH, TYPE A
2 PCC DRIVEWAY APPROACH AND SNV, 6", A-4
3 CONCRETE PAVEMENT REMOVAL
BID ITEM DESCRIPTION
F.Y. 2008 E. 4TH STREET RECONSTRUCTION & STREETSCAPE IMPF
QUANTITY ADJUSTMENTS
REPAINT EXISTING 5 -GLOBE LIGHT FIXTURE
NEW 5 -GLOBE LIGHT FIXTURE, INCLUDING WIRING, ETC.]
REGLOBE EXISTING 5 -GLOBE LIGHT FIXTURE
SAFETY CLOSURES
REMOVE DECORATIVE LIGHT POLE BASE
D
DD
A TTT�
CnTr000rr{TWIT
TZ-C'C
o or
-(fn
C!
oo
o D
(!1-<----
'-C
oo
Tm7m
oT"C
oor
"C-<71
850.00
$9,000.00 1
31,000.00
w
CT
0fA
O w
0 m
00000000
fj f9f9Of
N_ V
o C T m
to
A
O
fm
O a
o c n 0 n
325.00
$8.35
taw
699'69-0
w AD
O O
000000
o
f9 O
MN O
O `. 3 O O
-. N rV
rm CT
CT 00
00000
O O O
0 0 0
m
O fA
0 0
O O
0 0
N
O
0f9
ONO
O. P
0 0
fd
N f9f9
O tl t U I
0 0 0
69 f9
A
.+00000
O O
0 0
A f-. f9 f9
O W
O O O O
0 0 0 0
C
fA
O Nw
0 wm9'0
O O tl 1 b 161
0 0 0 0
tete
WN
p
o
0 0
C
T
01 n
w
9'
0
-0
w-+.Np
0 0 0
w
w Lw W
O N0a 9
ACO V
ow,a—pw
0 O W 0 0 O w
353.0
6,217.51
938.3
29,845.8
a
o W
NA V___
O $D--�
w O w 0
0 0 0
w
O1NU
W V
"v" 000000030(7100P0
0 Ut 0 0
_" Pm
mCTA
OCTA(00
0 0 O
...4w
0 0 0 0 0 0 C
91
W CT O
O C O
CT O
O OI
I PLAN
QUANTITY
r NO. 742
6 A+ N`N
.00006
176.4
6,850.0
388.9
39.5
1.00
597.1
42,310.8
3,530.4.
2,521.01
w -+
0
wm
-4m-.4a-
N O
A
mm
o
V O W O
O O O
CA fi1
tTW wow
�0_. V 0o
O O O w O 0 0
5,354.6
104.1
127.0
8.0
65.0
178.0
10.0
8.0
5,377.8
595.0
0
C
DT-1
f"'
d-+0000
00000AN
3524.4
(176.8)
432.5
75.6
(30,51
0.0
183.1
3715.2
1 290.4
(479.0)
W
NWO
0.0
0.0
0.0
00 O
OOO
0.0
(550_0)
467.7
(1045.7,
0.0
(18.75)
0.0
(48.4)
54.1
(58.0)
0.0
29.0
108.0
2.0
0.0
(25.1)
0.0
A N
A
INCR/DECR
1 QUANTITY
f9 6
N
030
O O N N
003)00
OOOON
000040
$10,573.20
(34,415.00)
32,746.38
3340.20
($45.75)
30.00
$1,.373_25
35,572.80
34,356.00
(31,878.50)
30.00
(3338.00)
37.924.40
f9'W
Of
A
m
-,
w
(9 f9 f9
0000,100A,
0000610
00000000
$0.00
(32,475.00)
39,354.00
(32,509.88)
$0.00
1$837.50)
30.00
($314.60)
$351.85
1 (31,334.00)
30.00
' $1,044.00
31,404.00
3380.00
_ $0.00
�_ (31,004.00)
30.00
49
A
N N
A N
V 61
INCRIDECR
1 AMOUNT
Po
0
-4 -4
o o
o CD
-4 CD
CD CD
CD Ca
CO 01
CD 0
Cs 0
ow 4.
0 0
C) c,
ca 41
0 0
0 o
Ca Ca
0 0
a 0
ha Ka
0 0
CA 0
ha
0 0
0 0
0 Cs
0 0
0 0
Ca Ca
0 0
Ca Ca
NA NI
as -4
NI 1.0
CD us
ha ha
4. t..4
h3 Ka
1,a
ha
0
a
q
1F.Y. 2008 E. 4TH STREET RECONSTRUCTION & STREETSCAPE IMPROVEMENTS - CONTRACT NO. 742
>
1
ESTIMATES 1-18
RETAINAGE
PAYMENTS TO CONTRACTOR -1
FINAL CONTRACT AMOUNT •
1
CHANGE ORDER NO, 8 (INCREASE -DECREASE)
CHANGE ORDER NO. 8
CHANGE ORDER NO. 7
CHANGE ORDER NO. 1
CHANGE ORDER NO. 2
CHANGE ORDER NO. 3
CHANGE ORDER NO.
CHANGE ORDER NO. 5
ORIGINAL CONTRACT AMOUNT
CLAY BRICK PAVERS INSTEAD OF CONCRETE PAVERS
HDD ALTERNATE 1 - DIVISION II
TOTAL CONSTRUCTION COST BASE BID DIVISION II
FURNISH AND INSTALL BANNER ARMS
LIGHT BASE FILL IN AND REPAIR
SIDEWALK CAP AT BUILDING FOR 110 E. 4TH ST.
MISCELLANEOUS ASPHALT PATCH
BASEMENT TOP AT 106 E. 4TH ST.
TREE GRATE MODIFICATIONS (PER TREE)
;REPLACE ROCK MULCH IN EXISTING TREE PITS
PCC DRIVEWAY APPROACH AND S/W, EV, A-4
112C #14 SIGNAL WIRE
#6 GREEN GROUND WIRE
!PREFORMED LOOP DETECTOR
12C #14 LOOP WIRE
FUEL FOR POWER PLANT
;CARE OF POWER PLANT
!ADJUST TO ITEM 16 - REM DECORATIVE LIGHT POLE BASE
LEOWER PLANT RENTAL
1HANDHOLE
'CONDUCTOR, #8
CONDUCTOR, #8
12 TWISTED PAIR 19 AWG W/ COPPER SHIELD
WASTE RECEPTACLES
BIKE RACKS
FTURFORASS SOD
BENCHES
SHADETREES
SHRUBS
BED PREP, GRAVEL MULCH, AND FABRIC
TREE GRATES
TREE GRATE FRAMES
DIVISION 0 - STREETSCAPE IMPROVEMENTS
Y ADJUSTMENTS
DESCRIPTION
g
0
x
r-
-n 0
x
r- r-
-n -n
-cl ' n
S; >n
)› ln
T T
T 3>
Z
q
44
a
0
Co
ha
,1
0
N4
ta
in Da
CT 01
0 -4
4k Co
CD 4.
Ca a
40
-..
0
0
p
n)
_,,,
b
N4
Oa
(.
-.
io
0
4+
.0.
$7,645.00
$3,685.00
40 40
69 69 ea -. cm
V. _cncop(0
r cn
co -. 0 01 0)
par. ta a 0)
ca 6 ka Co 44
0 03 0 0 14
Co
-4
0
V69
0-+
6
C.
•
0
$230.00
$2,090.00
$550.00
$195.00
ea
or ..7'
-. -.
CO CD
511 5a
ca ca
0 vo.
91
09 -.
Ca AI
ca
CD
0 NI
4A9
Oa
4 919 49 03
cn a o CD
10 4•9 409
-9 01 -4 Oa
QS 0, -4 Is)
op 5D 5n 5n
0 o o a
Ca Ca 0 0
69
0)
EA 01
pa p
t..) a
Ca 0
4I) Oa
fol pa
ka .o.
0 CO
$1,700.00
$8.80
$2.75
$1.50
$1 500.00
$1,600.00
40
40 Cu
40 Csi 0
pa 5A 6
NI 0 O
0 C7 Ca
69
09 _7'
0 Co
CA CT,
53 53
o 0
Ca CD
c
Z -0
A 0
4/9 ---
TOTAL INCREASE
3
DIVISION I
0)
-
,i
0)
...... .....
00
...4
0_
00
1.0
33.0
-.
CA 1,0
0 A.
000o000000
0 CA CO
0 Ca Ca CA
5a 5a Ca laa Ca
CA -.
0 ha NJ
3.0
2,022.0
2854.0
1,007.0
Ca
A
CD 01
bizbab00000
..
OiT
Cn :CS 0" 50
g ?al ..1 y.
PLAN
QUANTITY
LTERNATE 1
_o)
0
33.0
1.0
8.12
1.0
1.0
88.0
4.0
800.0
475.0
475.0
22.0
124.8
1.0
-•,.
"01
0
2,614.0
918.0
hCnn
ooI
288.0
525.0
10.0
5.0
00
0
C -n
> —
z Z
m..
Cla
,
5'3
F) 0 c,
0'0006
Ca CD
282.0
0.0
1.0
38.0
38.0
1 0.0
0.0
(125.0)
(125.0)
(2.0)
(25.2)
0.0
.......,
.... Ca 0.•
-9 pa pa
8 hi
PJ Ca
pa co 0
CO ts)
CO CO
ca ca cn -.
0.0
0.0
2.0
02.0)
INCR/pECR
QUANTITY
40
Ca
kk
_.
Oa
ha4040,
1.4
pa
:4
f.4
d.a.
0
S.
01
L
0
03.....
kl
01
y.
co
ha
49
40 60 :1
p 0 -
0 0 6k
00+
ca ,
......
49 00
c)
5a 0 0
c) ca
...... fa
92 49 E9179%
c 0- 49
-4 ha a 4, qp -4
40 g co -4 69
CD ... 1.0.. to 5) 5) 5) p p 5a
o 1.. ha -4 01 40 C3 0 CD C) Ca
0 Olki,Z) CD 0 0 C) CD 0
91 rfr a ,....
CD CD ha 4 *
ha 01 (0
0 ca 54 pa
.4. C7 -4 n4
CD 0CD
..,-.......-•
$0.00
$1,570.80
1 ($4,460.50)
01
49 40 CO -0.
53 53 ?4 so
0 CD CM ha
0 0 Le C.
--,
4.9 CO
03
-. 0 40 OP
53 p 5) 57
C7 0 CD CD
Ca 0 00
I I
FINCR/DECR
AMOUNT