Loading...
HomeMy WebLinkAboutHR Green Company-10/11/2010Howard R. Green Company 8710 Earhart Lane SW P. O. Box 9009 Cedar Rapids, IA 52409-9009 (319) 841-4000 FAX (319) 841-4012 CHANGE ORDER Distribution: Owner X Engineer Contractor X Field Other HRG PROJECT: Phase 2 Demolition Former Chamberlain Manufacturing Property Contract No. 762 Waterloo, Iowa Change Order No. 1 E Date September 28, 2010 To Contractor: Active Thermal Concepts, Inc. 2805 Stonegate Court Hiawatha, Iowa 52233 Contract No. 762 Original Contract Date May 17, 2010 The contract is changed as follows: 1.Complete additional work of asbestos abatement in accordance with the procedures required in the Specifications dated April 12, 2010, including Attachment A requirements, as follows: Abate the asbestos not in Attachment A in Building No. 1, 2 & 3. Total Cost Change Order No. 2 is $8,832.00. The original Contract Sum was $547,427.00 Net change by previously authorized Change Orders $47,720.00 The Contract Sum prior to this Change Order was $595,147.00 The Contract Sum will be increased by this Change Order in the amount of $8,832.00 The new Contract Sum including this Change order will be $603,979.00 The Contract Time will be increased by zero (0) days The date of Substantial Completion as of the date of this Change Order therefore is October 30, 2010 NOT VALID UNTIL. SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE, if applicable, AND OWNER Contractor Active Thermal Concepts, Inc. Owner's Representative Howard R. Green Company Owner City o, = aterloo, low By Cory Albers, Vice President By Gene H. Fritch, P. E. B �" < ' est G. Clark, Mayor Date: ` Date: Date: 10 Li J?o( 6 F:iChamberlain Phase 2 demo\Pay EstimateslChange Order No. 2-092810.doc