ARAIA Document G704 - 2000 Certificate of Substantial Completion PROJECT: (Name and address) Riverfront Stadium Grandstand ADA Ramp Project, 850 Park Road, Waterloo, IA. TO OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 PROJECT NUMBER: 08005 -ramp/ CONTRACT FOR: General Construction CONTRACT DATE: September 22, 2009 TO CONTRACTOR: (Name and address) Peters Construction Corporation 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty StruXture Architects, PLC (49/// �!/ ARCHITECT BY DATE OF ISSUANCE Date of Commencement July 20, 2010 A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Thirty (30) days from the above date of Substantial Completion. Peters Construction Corporation CONTRACTOR DATE The Owner accepts the Work or designated portion substantially complete and will assume full possession at 12:01 a.m. (time) on May 15, 2010. (date). City of Waterloo OWNER ala11,90o DATE AIA Document G704" — 2000. Copyright O 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:20:44 on 07/20/2010 under Order No.1000367524_1 which expires on 08/21/2010, and is not for resale. User Notes: (1886022261) The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Owner shall be responsible for maintenance, heat, utilities, insurance and damage caused by the Owner's personnel. AIA Document G704T" — 2000. Copyright © 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11:20:44 on 07/20/2010 under Order No.1000367524_1 which expires on 08/21/2010, and is not for resale. User Notes: (1886022261)