Loading...
HomeMy WebLinkAboutInVision Archittecture-9/13/20108/11/10 Rick Curran Waterloo Leisure Services 1101 Campbell Avenue Waterloo, IA 50701 Rick: RE: Young Arena Expansion - Phase 1 Amendment for Additional Services We are submitting this amendment for additional services for the project to make provisions for the energy recovery unit to be installed in the future. This was discussed during design and authorized to proceed. We propose our fee be increased by $4,500 to cover the design and documentation to provide the design for the unit and ductwork. This design work has been completed and was bid with the project. The majority of the fee will go to Modus for their design work. I have attached an amendment to the contract. Please print two copies, sign and return one copy to our office. We appreciate the opportunity to provide these services for the City and Young Arena. Sincgrely, Michael Broshar, FAIA enclosure 'OINES WATERLOO PROFESSIONAL SERVICES AGREEMENT AMENDMENT NO. 1 DATE: 8/11/2010 PROJECT NO.: 10014 For the Owner/Architect Agreement dated 4/12/2010, between the Owner, City of Waterloo, and INVISION Architecture, providing for professional services for the Young Arena Expansion — Phase 1. A. Scope Change: Design an energy recovery system for future installation, including an energy recovery ventilator and related ductwork for the addition, and include the necessary ductwork in the bid documents for construction in the current project. B. Other conditions: None. C. All conditions of the Agreement shall apply to this Amendment unless specifically stated otherwise above. D. Agreement Status: 1. Basic Services - Original Agreement Amount: Amendment No. Approved By: No. 1 Total Basic Services Michael Bros ar, FAIA $20,500 Add $4,500 $25,000 tor INVISION Architecture Date: 8/11/2010 for the Owner Title: Mayor Date: t (N1.00 DES MOINES WATER 1.00