Loading...
HomeMy WebLinkAboutCardinal Construction Inc-9/7/2010 (2)sew IA Document G701" - 2001 Change Order PROJECT (Name and address): New Fire Station #2 for the City of Waterloo, IA. TO CONTRACTOR (Name and address): Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 CHANGE ORDER NUMBER: 007 DATE: July 30, 2010 ARCHITECT'S PROJECT NUMBER: 08068 CONTRACT DATE: September 14, 2009 CONTRACT FOR: General Construction OWNER: ARCHITECT: 0 CONTRACTOR: 0 FIELD: 0 OTHER 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. B. C. D. E. F. G. Credit to delete vehicle exhaust system accepted under Alternate #4. Cost to revise/add storm sewer along LaPorte Road per owner's request. Cost to provide access door at stairs for improved data wiring access. Cost to adjust operation/controls for the overhead doors as requested by owner. Cost to provide new flagpole in lieu of reusing existing. Cost to add microphone in office area. Cost to add Terracon testing per owner's request. DEDUCT ($17,990.00) ADD $13,535.00 ADD $ 258.00 ADD $ 180.00 ADD $ 1,451.00 ADD $ 809.00 ADD $ 1.395.00 TOTAL DEDUCT ($ 362.00) TOTAL AMOUNT OF THIS CHANGE ORDER, DEDUCT FROM CONTRACT SUM ($362.00). The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 30, 2010. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.. $ 1,601,780.00 $ 51,066.00 $ 1,652,846.00 $ t 362.00 ) $ 1,652,484.00 NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, LLC ARCHITECT (Firm name) 314 East 4th Street Waterloo, IA 50703 DRES,(Sj /29 BY (Signature) Daniel C. Charmer (Typed name) DATE Cardinal Construction, Inc. CONTRACTOR (Finn name) 531 Commercial Street, PO Box 897 Waterloo, IA 50704 ADDRES City of Waterloo OWNER (Firm name) 715 Mulberry Street Wats oo, IA 50703 /2 C BY (Signatur ) Jon Mixdorf (Typed name) 2 - DATE SS (Signature) Ernest G. Clark (Typed name) l � 0DATE "�� AIA Document G701TM —2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 08:15:00 on 07/30/2010 under Order No.0855916195_1 which expires on 07/29/2011, and Is not for resale. User Notes: (1331844974)