Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Pries Roofing-8/16/2010
ARAIADocument G704' - 2000 Certificate of Substantial Completion PROJECT: (Name and address): 09025 Gates Park Pro Shop Roof Replacement Gates Park Pro Shop 820 E Donald St Waterloo IA 50703 TO OWNER: (Name and address): City of Waterloo 715 Mulberry St. Waterloo, Iowa 50703 PROJECT NUMBER: 09025/ CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR: (Name and address): Pries Roofing 7544 E Reinbeck Road LaPorte City, Iowa 50651 OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: 0 FIELD: 0 OTHER: ❑ PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty INVISION Architecture Date of Commencement ARCHITECT BY April 27, 2010 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of Substantial Completion. Pries Roofing CONTRACTOR P-441 a/S/ RC/ 41 BY DATE The Owner accepts the Work or designated portio substantially complete and will assume full possession at 5:00 PM (time) on April 27, 2010 (date). ,� - , �/ City of Waterloo C�G�Y d X7/6) OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) AIA Document G704T" — 2000. Copyright O 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This A!A° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:36:59 on 04/26/2010 under Order No.8478586463_1 which expires on 08/23/2010, and is not for resale. User Notes: (1298941548) kAIA AIA Document G7O4TM - 2000 Certificate of Substantial Completion AIA Document G704-2000. Copyright Copyright © 1963, 1978, 1992 and 2000 by by The American Institute of Architects. Ali rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this ABA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:36:59 on 04/26/2010 under Order No.8478586463_1 which expires on 08/23/2010, and is not for resale. User Notes: (1298941548)