HomeMy WebLinkAboutPeterson Construction-6/28/2010Owner City of Waterloo Project FY 2010 River Renaissance Lower Plaza Owner's Contract No. 763 CHANGE ORDER NO. 1 Date June 23, 2010 Contractor Peterson Contractors Inc. Date of Contract Start April 15. 2010 $ 3,189,424.95 You are directed to make the following changes in the Contract Documents. Description: 1-1 Drilled Concrete Piers and Shafts (Footings for Performance Structure) $55,000.00 1-2 Added Length Drilled Pier Through Non -Rock Material ($300/LF) $0.00 1-3 Deduct Length Drilled Pier Through Non -Rock Material ($150/LF) $0.00 1-4 Added Length Drilled Pier Through Rock Material ($550/LF) $0.00 1-5 Deduct Length Drilled Pier Through Rock Material ($250/LF) $0.00 TOTAL ADDITIONS $55,000.00 Reason for Change Order: 1-1 It was decided it would be beneficial to the scheduling of work on the Lower Plaza project to complete the underground footing work for the upcoming Performance Structure project as part of the ongoing work in the Lower Plaza area. The work included in this Change Order includes 4 drilled shafts and 2 pile caps which will be extended as part of the future project. 1-2 — 1-5 Because the exact depths of rock in this area are unknown, prices have been established to increase or decrease costs depending on the conditions that are discovered at the time of construction. CONTRACT PRICE CONTRACT TIMES To Substantial To Final Completion Completion Original: $ 3.189,424.95 Original Completion Date: 11/30/2010 12/31/2010 Previous C.O.s (ADD/DEDUCT): $ 0.00 Revised Completion Date: No Change No Change This C.O. (ADD/DEDUCT): $ 55,000.00 Contract Price with all approved Change Orders: $ 3244,424.95 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. Signature Date By: Lit Contractor (Au onzed Signature) ACCEPTED: % By:/ AE ufg,s�2o�o A;k-i( -23 -lb Date AECOM 60155128 / 1 Project No. Change Order No. L:\work\project\60155128\eng\Change Orders\Lower Plaza CO#1.docx Owner City of Waterloo Project FY 2010 River Renaissance Lower Plaza Owner's Contract No. 763 CHANGE ORDER NO. 1 Date June 23. 2010 Contractor Peterson Contractors Inc. Date of Contract Start April 15. 2010 $ 3.189 424.95 You are directed to make the following changes in the Contract Documents. Description: 1-1 Drilled Concrete Piers and Shafts (Footings for Performance Structure) $55,000.00 1-2 Added Length Drilled Pier Through Non -Rock Material ($300/LF) $0.00 1-3 Deduct Length Drilled Pier Through Non -Rock Material ($150/LF) $0.00 1-4 Added Length Drilled Pier Through Rock Material ($550/LF) $0.00 1-5 Deduct Length Drilled Pier Through Rock Material ($250/LF) 50.00 TOTAL ADDITIONS $55,000.00 Reason for Change Order. 1-1 It was decided it would be beneficial to the scheduling of work on the Lower Plaza project to complete the underground footing work for the upcoming Performance Structure project as part of the ongoing work in the Lower Plaza area. The work included in this Change Order includes 4 drilled shafts and 2 pile caps which will be extended as part of the future project. 1-2 —1-5 Because the exact depths of rock in this area are unknown, prices have been established to increase or decrease costs depending on the conditions that are discovered at the time of construction. CONTRACT PRICE CONTRACT TIMES To Substantial To Final Comnletion Completion Original: $ 3.189.424.95 Original Completion Date: 11/30/2010 12/31/2010 Previous C.O,s (ADD/Dl): $ 0.00 Revised Completion Date: No Change No Change This C.O. (ADD/DEDUCF): $ 55.000.00 Contract Price with all approved Change Orders: $ 3.244.424.95 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. ACCEPTED: o'` By: . AECOMM tfig‘s[2.00 Date »ate (16,-2- -I0 Date AECOM 60155128 / Project No. Change Order No. L:\work\project1601551281eng\Change Orders\Lower Plaza CO#1.docx