Loading...
HomeMy WebLinkAboutKW Electric Inc-6/28/2010CHANGE ORDER NO.1 Owner Waterloo Reotonal Aliroo, Citv of Waterloo, Iowa Date November 16.2009 - Project 400 Hz Ground Power Unit �+ Owner's Contract No. FAA AIP Project No. 3-19-0094-36 Contractor KW Electric Inc. Vit' Date of Contract Start July 13 2009 You are directed to make the following changes in the Contract Documents Description: Rein Unit , No. Desafption Unit Price Quantity Amount 2 Control Wring Modification LS $389.00 1.0 $389.00 Change Order Total 5389.00 Reason for Change Order. Provide control wiring to prevatt the Passenger Boarding Bridge from moving when the Ground Power Unit is attached to an aircraft. This is an optional function when both the boarding bridge and the Ground Power Unit are installed at the same time, The Ground Power Unit was added to an existing boarding bridge and this limit switch with control wiring was not provided by the boarding bridge supplier. 400 Hz Ground Power Unit CO- 1 Project No - 112230 1 CONTRACT PRICE Original: $ 92.550 00 Previous C s (ADD): $ 0.00 This C (ADD): $ 3S9.00 Contract Price with all approved Change Orders: $ _72.939.00. CONTRACT TIMES (Calendar Days) Io substantial To fatal completion completion Original: 210 Previous C 0.s (ADD): This C,.O. (ADD): REVLSED: 0 0 210 Original Completion Date: 210 Revised Completion Date: 210 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the changc(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. IBIS DOCUMENT SHALL BECOME AN AMENDMENI TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO ACCEPTED: 13q fr- Contractor (Authorized Signature) 6/z1,0 Date (1(216'6(6 Date Date 400 Hz Ground Power Unit CO -1 Project No —112230 2 134808 - Hart/Welper that Change Order No. 1 for a net increase of $389.00 for work performed by K&W Electric of Cedar Falls, Iowa in conjunction with Ground Power Unit project at the Waterloo Regional Airport, be received, placed on file and approved and Mayor authorized to execute same. Ayes: Six. Absent: Greenwood. Motion carried. 134809 - Hart/Welper that "Resolution approving Final Acceptance and Completion of Project performed by K&W Electric of Cedar Falls, Iowa at a total cost of $72,939.00 in conjunction with Ground Power Unit project at the Waterloo Regional Airport", be adopted. Ayes: Six. Absent: Greenwood. Resolution adopted and upon approval by Mayor assigned No. 2010-577. .i .. A \i) rte.`) ..��1 . Pay Estimate No. 2 (Final) 400 Hz Ground Power Unit Waterloo Municipal Airport Waterloo, Iowa FAA AIP 3-19-0094-36 AECOM Project No. 112230 PERIOD ENDING: June 17, 2010 item No. Spec. No. Description Unit Unit Bid Price Contract Quantity Contract Amount Authorized Quantity Authorized Amount Quantity To Date Amount To Date 1 26 35 43 40D Hz Ground Power Unit Installed L.S. $ 72.550.00 1 $ 72.550.00 1 $ 72,550.00 1 $ 72,550.00 2 26 35 43 Control Wiring Modification (CO Al) L.S. $ 389.00 0 $ - 1 $ 389.00 1 $ 389.00 Total Amount $ 72,550.00 $ 72.939.00 $ 72,939.00 Prepared by: AECOM Waterloo Regional Airport Repre entative rt Director mg Total Earned to Date Stored Materials Subtotal Less Retainage (5%) Subtotal Less Previous Payments Total Amount Per Division $ 72,939.00 $ - $ 72,939.00 $ - $ 72,939.00 $ 68,922.50 $ 4,016.50 Total Amount Due This Estimate $ 4,016.60 Percent Complete 100.0%