HomeMy WebLinkAboutAllied Construction Company Inc-6/28/2010CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date June 22, 2010 Project Rehabilitation of GA Apron and Taxilanes (Phase I) Owner's Contract No. FAA AIP Project No. 3-19-0094-30 Contractor Allied Constr. Company, Inc. Date of Contract Start April 15, 2008 You are directed to make the following changes in the Contract Documents. Description: ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL AMOUNT 3 Storm Sewer Pipe Removal LFT -7.2 $ 17.75 $ (127.80) 5 Storm Sewer Structure Removal EA 1.0 $ 285.00 $ 285.00 6 Removal of Paint SFT -777.5 $ 1.50 $ (1,166.25) 9 Silt Fence Installation & Removal LFT -175.0 $ 4.25 $ (743.75) 13 Taxiway Painting (Yellow -Epoxy) SFT -404.7 $ 3.82 $ (1,545.95) 14 15" RCP Storm Sewer Pipe LFT 21.0 $ 43.00 $ 903.00 15 18" Slotted Drain LFT -6.5 $ 220.00 $ (1,430.00) 17 Storm Sewer Intake Adjustment EA -2.0 $ 750.00 $ (1,500.00) Total Amount of Change Order (5,325.75) Reason for Change Order: All quantities have been adjusted to final field measured quantities. The following quantities are substantial changes and are further defined. • Item 6. Majority of paint removal was completed under another project. • Item 7. Construction Phasing required less silt fence installation. • Items 13. Majority of paint was completed under another project. Rehabilitation of GA Apron & Taxilanes (Phase I) CO -2 Project No — 103753 1 CONTRACT PRICE Original: $ 671,317.25 Previous C.O.s (ADD): $ 13,126.70 This C.O. (ADD): $ (5,325.75) Contract Price with all approved Change Orders: $ 679,118.20 CONTRACT TIMES (Calendar Days) To substantial completion To final completion Original: 105 Previous C.O.s (ADD): 0 This C.O. (ADD): 0 REVISED: 105 Original Completion Date: 105 Revised Completion Date: _ 105 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. Owner (Authorized Signature) ACCEP By: 1Z3//) Date (0(2)812p0 Date a/ -9 -e -e -e --L. 14'2 64/147 Contractor (Authorized Signature) Date Rehabilitation of GA Apron & Taxilanes (Phase I) CO -2 Project No - 103753 2