Loading...
HomeMy WebLinkAboutIowa Bridge & Culvert LC-6/28/2010CHANGE ORDER NO. 2 Owner City of Waterloo. Iowa Project FY 2010 Cedar Prairie Trail Bridge Repairs Owner's Contract No. 764 Date June 17. 2010 Date of Contract Start April 12. 2010 Contractor Iowa Bridge & Culvert. L.C. $ 114.550.00 You are directed to make the following changes in the 2-1 Additional Removal of Existing Structure 2-2 Additional Piles, Sleet Pipe. 12 In, (P1 OA, Type 1) 2-3 Additional Steel, W14x90 Support Beams 2-4 Additional Steel W18x50 Cap Beams 2-5 Beam Splice Connections 2-6 Additional Piling and Freight Charge 2-7 Tree Removal TOTAL ADDITIONS Contract Documents. Description: (1EAaQ $1500) 51,500.00 (140 LF @ $65) $9,100.00 (720 LBS © 52.50) $1,800.00 (1600 LBS @ $2.50) $4,000.00 (20 © $2100 EA) $42,000.00 (1 LS ® 863.80) $863.80 (2 EA ® 950.00) 51,900.00 561,163.80 Reason for Change Order: 2-1 — 2-7 During construction, some additional damage and deterioration of the existing bridge was discovered below the normal water line and beneath the timber debris adjacent to the bridge pile groups. In addition, due to the configuration of the beam lines found during construction, beam splice connections are required to complete the bent removals. Cost is for additional repair items necessary to cornplete the repairs of these areas. CONTRACT PRICE Original: Previous C.O.s (ADD/BC-136F): This C.O. (ADD/DEDUCT): $ 61,163.80 Contract Price with all approved Change Orders: $ 178.188.80 CONTRACT TIMES To Substantial To Final Completion Completion $ 114.550.00 Original Completion Date: 5/28/2010 5/28/2010 $ 2A75.00 Revised Completion Date: 7/162010 7/16/2010 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS A i COVENANTS OF THE CONTRACT SHALL APPLY HERETO. By:; ed Signature) ACCEP_ By Contractor (Authorized Signature) Date 6(agl aocd Date _640/i0 Date AECOM 1139401601320131 / 2 L \work\project\I 13940\eng\Change Orders\CO#2-Cedar Prairie Trail Bridge.docx