Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cardinal Construction Inc-1/11/2010
!AIADocument G701rm - 2001 Change Order PROJECT (Name and address): New Fire Station #8 for the City of Waterloo, IA. TO CONTRACTOR (Name and address): Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 CHANGE ORDER NUMBER: 004 DATE: December 17, 2009 ARCHITECT'S PROJECT NUMBER: 08068 CONTRACT DATE: September 14, 2009 CONTRACT FOR: General Construction OWNER: 0 ARCHITECT: 0 CONTRACTOR: FIELD. ❑ OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. Cost for mechanical sub -contractor increase. B. Cost for structural steel increase. ADD $28,000.00 ADD $ 1,300.00 TOTAL ADD $29,300.00 REDUCE SPECIFIED GENERAL ALLOWANCE FROM $25,000.00 TO $3,200.00. REDUCE SPECIFIED MECHANICAL ALLOWANCE FROM $10,000.00 TO $5,000.00. REDUCE SPECIFIED ELECTRICAL ALLOWANCE FROM $5,000.00 TO $2,500.00. CONTRACT SUM REMAINS THE SAME. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 30, 2010. $ 1,601,780.00 $ 52,500.00 $ 1,654,280.00 $ 0.00 $ 1,654,280.00 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, PLC ARCHITECT (Firm name) 314 East 4th Street, Waterloo, IA 50703 ADDRESS Y (Signature) Cardinal Construction, Inc. CONTRACTOR (Finn name) 531 Commercial Street, PO Box 897, Waterloo, _ 50704 ADDRESS City of Waterloo OWNER (Firm name) 715 Mulberry Street, Waterloo, IA 50703 Daniel C. Channer (Typed name) A z2/2 DATE Jon Mixdorf (Typed name) DATE (Signature) +omt7.-.Ernest G. Clark (Typed name) DATE AIA Document G701", — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This A1A© Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:01:48 on 12/17/2009 under Order No.9839989696_1 which expires on 07/30/2010, and is not for resale. User Notes: (1131178610) 1