HomeMy WebLinkAboutK Cunningham Construction-1/11/2010CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date December 15, 2009 Project Rehabilitation of GA Apron and Taxilanes (Phase 2) Owner's Contract No. FAA AIP Project No. 3-19-0094-32 Contractor K. Cunningham Const. Inc. Date of Contract Start August 4, 2008 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Quantity UNIT PRICE TOTAL AMOUNT 2 Pavement Removal SY (267.3) $4.70 -$1,256.31 3 Storm Sewer Pipe Removal LF (10.0) $10.00 -$100.00 5 Unclassified Excavation CY (356.9) $12.00 -$4,282.80 6 Subbase Course CY (149.0) $46.00 -$6,854.00 7 Silt Fence Installation & Removal LF (575.0) $2.50 -$1,437.50 8 6" Portland Cement Concrete Pavement SY (403.2) $48.50 -$19,555.20 9 9" Portland Cement Concrete Pavement SY (7.3) $42.90 -$313.17 10 Asphalt Transition Pavement TON (44.3) $219.00 -$9,701.70 11 12 inch, RCP Storm Sewer Pipe, Class III LF 75.0 $36.75 $2,756.25 12 12 inch Slotted Drain Pipe, 14-Guage LF (72.0) $195.00 -$14,040.00 13 Perforated PVC Underdrain, 4 -inch LF (132.0) $6.95 -$917.40 14 Porous Backfill CY (10.0) $90.00 -$900.00 15 Filter Fabric SY (115.0) $7.00 -$805.00 18 6 -inch Ductile Iron Water Main Pipe LF 22.5 $42.75 $961.88 19 Water Service -Trenched In Place, 2 -inch Dia. Copper LF (20.0) $37.95 -$759.00 20 Water Service -Bored In Place, 2 -inch Dia. Copper LF (175.0) $49.00 -$8,575.00 23 Schedule 80 PVC Conduit w/ Pull Rope, 4 -inch Dia. LF (0.5) $16.00 -$8.00 24 12 -Pair, 19 Gage, Gel Filled, TypePE39 Telephone Cable LF 50.0 $7.50 $375.00 Total Amount of Change Order -$65,411.95 Reason for Change Order: • Items 2,3,5,6,8,9,10,11,18,19,23 and 24 reflect actual field measured quantities. • Item 7 was deleted from the contract. • Items 12, 13, 14 and 15 were deleted from the contract as the slotted drain pipe was replaced with 74' of 12" RCP. • Item 20 was deleted from the contract. General Aviation Apron (Phase 2) CO -2 Project No - 105485 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 424,002.15 Original: 105 Previous C.O.s (ADD): $ 8,775.00 Previous C.O.s (ADD): 0 This C.O. (Deduct): $ (65,411.95) This C.O. (ADD): 0 Contract Price with all REVISED: 105 approved Change Orders: $ 367,365.20 Original Completion Date: 105 Revised Completion Date: 105 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMME Engineer d Signature) APPRO D:("d_ By: Owner (Authorized Signature) 611t54- G. Clark -, le ACCEPTED: Contractor (Authorized Signature) /2/.5"- ate 111g-016 Date /2//4,7,9 Date General Aviation Apron (Phase 2) CO -2 Project No — 105485 2