HomeMy WebLinkAboutCedar Valley Corporation-1/11/2010CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date December 15, 2009 Project Rehabilitation of Taxiway 'A' Owner's Contract No. FAA AIP Project No. 3-19-0094-31 Contractor Cedar Valley Corporation Date of Contract Start September 10, 2007 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Quantity Unit Price Total Amount 2 Portland Cement Concrete Pavement Removal SYD 220.6 $ 6.34 $1,398.60 4 Removal of Paint SFT 675.5 $ 0.84 $567.42 6 Aggregate Subbase Course CYD 90.9 $ 36.35 $3,304.22 7 12" Portland Cement Concrete Pavement SYD (68.0) $ 55.11 -$3,747.48 8 Edge Repair of Existing PCC Pavement SFT (33.8) $ 150.09 -$5,073.04 9 Asphalt Transition Pavement TON (4.3) $ 192.00 -$825.60 11 Taxiway Painting (Yellow - Epoxy) SFT 609.0 $ 3.87 $2,356.83 12 Temporary Paint (White/Yellow - Waterborne) SFT 642.3 $ 0.83 $533.11 7a Smoothness Deduct for West Track 1 & 3 SYD (23.1) $ 55.11 -$1,273.04 100 Remove Non -Movement Area Marking SFT (4,805.0) $ 0.84 -$4,036.20 101 Non -Movement Area Painting (Yellow - Epoxy) SFT (541.5) $ 3.87 -$2,095.61 110 Remove Existing Taxiway 'A' East Marking SFT 2,486.8 $ 0.84 $2,088.91 111 Taxiway 'A' East Painting (Yellow - Epoxy) SFT (622.7) $ 3.87 -$2,409.85 120 Remove Existing Taxiway 'A' West Marking SFT 2,092.5 $ 0.84 $1,757.70 121 Taxiway 'A' West Painting (Yellow - Epoxy) SFT (59.5) $ 3.87 -$230.27 130 Remove Existing Taxiway Centerline Markings SFT 1,750.0 $ 0.84 $1,470.00 131 Enhanced Taxiway Centerline Painting (Yellow - Epoxy) SFT (56.0) $ 3.87 -$216.72 15 Portland Cement Concrete Pavement Removal SYD 391.1 $ 6.34 $2,479.57 19 12" Portland Cement Concrete Pavement SYD (19.2) $ 50.07 -$961.34 20 Edge Repair of Existing PCC Pavement SFT (52.7) $ 150.09 -$7,909.74 21 Asphalt Transition Pavement TON (4.7) $ 192.00 -$902.40 Total Amount of Change Order -$13,724.92 Terminal Apron Rehabilitation CO -2 Project No -103755 1 Reason for Change Order: All quantities have been adjusted to final field measured quantities. Item 7a is a smoothness deduct for Profilometer Tracks 1 & 3 on the west side of Taxiway A. CONTRACT PRICE Original: $ 532,192.96 Previous C.O.s (ADD): $ 37,471.20 This C.O. (ADD): $ (13,724.92) Contract Price with all approved Change Orders: $ 555,939.24 CONTRACT TIMES (Calendar Days) To final completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: To substantial completion 75 0 6 81 Original Completion Date: 75 Revised Completion Date: 81 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: APPR ED: �� By: `' I '`G:. Owner (Authorized ignature) rnesf- 6- Clitkici Or ACC ' TED: By: Contractor (Authorized Signature) ) /2//6"/09 ZI () (0el Date Date Terminal Apron Rehabilitation CO -2 Project No -103755 2