Loading...
HomeMy WebLinkAboutAecom Technical Services-1/25/2010A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com SNOW REMOVAL EQUIPMENT (SRE) ACQUISITION SERVICES WATERLOO REGIONAL AIRPORT WATERLOO, IOWA FAA PROJECT NO. 3-19-0094-37 Project Description - See Attachment Scope of Services - See Attachment Compensation A. Compensation for Services for this task order shall be a cost plus fixed fee not -to -exceed Forty Thousand Dollars ($40,000.00). See attachment. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport between AECOM Technical Services, Inc., formerly known as Earth Tech, Inc., and the Waterloo Airport Board dated December 5, 2008. APPROVED CITY OF WATERLOO, IOWA APPROVED AECOM TECHNICAL SERVICES, INC. By Ernest G. Clark, Mayor / Joe A. Becker Date 3-wr1,0j.: ` )5/?0 L:\work\ADMIMAGREE\PIRi WatAirSRE.doc Date January 14, 2010 ATTACHMENT FOR ACQUISITION OF SNOW REMOVAL EQUIPMENT (SRE) FOR THE WATERLOO REGIONAL AIRPORT WATERLOO, IOWA FAA AIP PROJECT NO. 3-19-0094-37 I. PROJECT DESCRIPTION The project is described as the acquisition of snow removal equipment (SRE) consisting of a truck mounted aircraft deicing/anti-icing system and a snow removal truck with sweeper for the Waterloo Regional Airport, Waterloo, Iowa. II. GENERAL PROJECT SCOPE The work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide background research, develop specifications, provide bidding services, prepare grant application, and provide grant administration for the acquisition of the snow removal equipment for the Waterloo Regional Airport. Work shall be divided into the following tasks: A. Design Phase 1. Design Conference - This task consists of a pre -design conference called by the City of Waterloo, Iowa (hereinafter referred to as Sponsor) and held between the Sponsor, the Consultant and the FAA. The purpose of this conference is to define project requirements, finances, schedules, phasing and other pertinent data that affects the scope of work, design standards and presentation of bid documents. The requirements set forth in this design conference will be confirmed in writing by the Consultant to the Sponsor, with copies to each participating unit of government. 2. Data Collection and Review — This task consists of the collection of existing data applicable to this project and related to the proposed snow removal equipment. 3. Prosect Specifications - This task consists of the preparation of specifications for the acquisition of the snow removal equipment. It is anticipated that separate bid documents will be prepared for each piece of snow removal equipment (truck with aircraft deicing/anti-icing system and truck with sweeper). The specifications will be in compliance with current Central Region Federal Aviation Administration requirements in effect at the time the specifications are prepared. 4. Quality Review - This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel that are not directly involved in the project. Page 2 5. Bid Assistance — This task consists of assisting the Sponsor in advertising for and receiving bids, answering bid document interpretation questions from bidders, analyzing the bids received and preparing a recommendation to the Sponsor for award of contract. 6. Pre -Bid Conference — This task consists of attending and conducting a "Pre -Bid Conference" at the Project site for prospective bidders. 7 Grant Application — This task consists of assisting the Sponsor in preparation of grant application. 8. Shop Drawings and Submittals — This task consists of reviewing shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the Project and compliance with the information given in the contract documents. 9. Pay Applications and Reimbursement Forms — This task consists of preparing and processing monthly applications for payment to the Contractor and forwarding to the Sponsor for execution with recommendations for approval and payment. This task also includes preparation of federal reimbursements forms for the Sponsor. 10. Project Closeout — This task consists of assisting the Sponsor with Project completion and final closeout documentation from the Contractor for the FAA by providing a statement covering the following. a) Sponsor Certification for Equipment Final Acceptance. b) Final Outlay Report — Standard Form SF -271. c) Final Project Cost Summary. d) Final Acceptance Report. 1) Provide brief description of procured equipment. Identify the make, model and serial number of the acquired equipment. 2) Provide a minimum of two photographs of the each acquired item. All sides of the acquired equipment should be depicted in the submitted pictures. 3) Summary of key milestone dates - Receipt of bids, NTP, delivery date, final acceptance and warranty date. 4) Change order summary (if needed). 5) Summary of the acceptance tests that were conducted. (Note: Consult the appropriate Advisory Circular for specific acceptance criteria that may be required.) 6) Sponsor statement addressing contractor compliance with Buy American provisions. NOTE: The Sponsor shall maintain documentation that demonstrates their actions to verify contractor compliance with Buy American provisions. Upon request of the FAA project Page 3 manager, the sponsor shall provide this documentation to the FAA as part of the closeout documentation. 7) Copies of vendor certifications. 8) Statement from accepting official attesting to their concurrence with the acceptance of the subject equipment. e) Sponsor Cover Letter. 1) Amendment Request. 2) Statement of compliance with approved procurement specifications. 3) Eligibility of Claimed Costs. 4) Inventory. • Description of the property. • Serial number or other identification number. • Source of the property, who holds title. • Acquisition date. • Cost of the property. • Percentage of Federal participation in the cost of the property. • Location, use and condition of the property. 11. Project Administration - This task consists of administration and coordination of the project. Preparation of 25 sets of bid documents for each piece of snow removal equipment for distribution to Sponsor, FAA, plan rooms, suppliers and potential bidders is included in this task. Preparation of contracts, reports on progress, preparation of pay estimates, and grant reimbursement and project close-out documentation are a part of this task. L:\work\ADMINWGREE\PROF\WaterlooAir SRE Scope.doc Snow Removal Equipment (SRE) Acquisition Services Waterloo Regional Airport Waterloo, Iowa FAA Project No. 3-19-0094-37 Design & Acquisition Phase Services Cost Summary I. Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 56 $80.00 $4,480.00 Project Professional 10 $65.50 $655.00 Staff Professional 160 $39.50 $6,320.00 CADD Operator 0 $25.00 $0.00 Senior Technician 0 $31.00 $0.00 Technician 0 $24.50 $0.00 Project Support 68 $19.50 $1,326.00 $12,781.00 294 Il. Payroll Burden and Overhead Provisional Costs 165.00% $21,088.65 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 1000 0.550 550.00 Per Diem 0 30.00 0.00 Lodging 0 55.00 0.00 Copier 5000 0.06 300.00 Plan Copier 0 0.50 0.00 GPS 0 25.00 0.00 Geodimeter 0 12.50 0.00 Miscellaneous, Other 250.00 $1,100.00 IV. Earth Tech Estimated Actual Costs $34,969.65 Rounded $35,000.00 V. Subcontract Expense None $0.00 VI. Estimated Actual Costs $35,000.00 VII. Fixed Fee $5,000.00 VIII. Maximum Amount Payable $40,000.00 Snow Removal Equipment (SRE) Acquisition Services Waterloo Regional Airport Waterloo, Iowa FAA Project No. 3-19-0094-37 Design & Acquisition Phase Services Staff Hour Estimate Item No. Description I Profession?rofessionOrofessionE Senior Project Staff Project Support Totals 1 Design Conference 4 4 2 Data Collection 16 16 3 Pro'ect Specifications a Truck with Deicing/Anti-icing System 12 32 24 68 b Truck with Sweeper 12 32 24 68 4 Quality Review 4 4 5 Bid Assistance 4 4 8 6 Pre -Bid Conference 4 4 8 7 Grant Application 4 2 6 8 Shop Drawings 4 24 2 30 9 Pay Applications & Reimbursements 4 12 16 10 Project Closeout 12 32 8 52 11 Project Administration 4 2 8 14 Total SRE Equipment Acquisition Services 56 10 160 68 294