Loading...
HomeMy WebLinkAboutKWS Co-2/1/2010Contract Modification Number 1 Project: 218/380- Williston/W. 18th Traffic Safety Improvements Contract Date: August 24, 2009 Contractor: KWS of Cedar Falls, Iowa DOT Project Number: CS -TSF -8155(706)-85-07 The undersigned parties hereby agree to modify the above referenced contract according to the terms and conditions described below: 1. Work & Items Furnish and install two 10' signal poles and push buttons. 2. Why is this work needed: At southbound US 218 at Williston the existing poles are only 8 ft in length. The contractor has added 3 -section heads as per plans. Addition of 3 -section heads has made the signal head's vertical clearances non-compliant. 10 ft poles and new pedestrian push buttons are needed. 3. Work Involved: This contract modification is for taking off the existing installed signal heads, removing the existing 8 ft poles, furnishing and installing new 10 ft poles, re -installing signal heads, and installing new push buttons. Poles will be with cast -alum t -bases (breakaway). 4. Costs: The cost for each pole shall be $2,100. The total change shall be $4,200. The contract price of $93,782 shall increase to $97,982. The cost includes removing the existing bases and installing new bases or working with the existing concrete base. Either way the cost shall remain the same. Contractor: KWS Inc By: Title: 0 9_ Date: I � tO City of Waterloo. / /7dBy: zfriZJ Title: Date: n CJfr