Loading...
HomeMy WebLinkAboutAecom Technical Services-3/8/2010A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com DRY RUN CREEK ARCH REVIEW AND FINAL PLANS AND SPECIFICATIONS FOR ARCH GATE REPAIR CITY OF WATERLOO, IOWA CONSTRUCTION REVIEW SERVICES FOR THE DRY RUN CREEK ARCH GATE REPAIR SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc., (ATS), of Waterloo, Iowa, dated April 6, 2009, for the review of sanitary and storm sewer components of the Dry Run Creek Arch, including construction repair estimates, completion of a summary report, final design and specifications for the arch gate repairs in Waterloo, Iowa; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for Phase III — Construction -Review Services for that portion of the project including the Dry Run Creek Arch Gate Repair. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. Project Description The project consists of the replacement of the existing Dry Run Creek Arch Gate located near the south end of the 6th Street Bridge. The work includes removal of the existing roller gate and frame and replacement with a new electrically operated 13'x10' sluice gate and associated items. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the Dry Run Creek Arch Gate Replacement. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, ATS and affected utilities. Task 2. Provide construction -staking for horizontal and vertical controls for the project, including project control and alignment of electrical feed for gate controls. Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. A=COM Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 10. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 11. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 12. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 13. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 14. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 15. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on any hourly basis in accordance with Part III of the original agreement. Estimated fee for the services is Eighteen Thousand Dollars ($18,000.00) and shall not be exceeded without authorization of the Client. IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated March 30, 2009; and subsequent amendments. AZCOM IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: CITY OF WATERLOO, IOWA By: 'Id Date ilitilkk S./ 260 Ernest G. Clark Mayor ATTEST: AECOM TECHNICAL SERVICES, INC. By Joe A. Becker Vice President Date March 2, 2010 L:\work\ADMIN\AGREE\SUPPLE\SA1-DryRunCrk Arch Gate.doc