HomeMy WebLinkAboutAment-3/15/2010Agreement Addendum Number 1 Project: US 63/ Ridgeway Engineering Design for Traffic Safety Improvements Agreement Date: Signed By Mayor on February 23, 2009 Engineering Firm: Ament The undersigned parties hereby agree to modify the above referenced agreement according to the terms and conditions described below: 1. Work & Items The following items required extra work that was not anticipated at the time of signing the agreement: • Design changes based on Iowa DOT's review of preliminary plans. Mast arm pole configuration was changed to keep the existing truss. • Additional surveying and design effort was also necessary when it was determined that the existing roadway culvert to drain the median adjacent to the lengthened northeast -bound US 63 left -turn lane could not be utilized and that two new pipe culverts would need to be jacked under the southwest -bound lanes ofUS63. • Changes to plans and specifications format to accommodate a DOT letting. 2. Costs: The Agreement amount is increased by $6,500. The original agreement amount was $32,900. The new "not to exceed" amount is $39,400. Engineering Firm: Ament By: Title: pJ, -i),(< f' 4'0` 6/13 / Date: City of Waterloo' By: .,e •%a-tY 6e/df Title: Date: 3 olQ Agreement Addendum Number 1 Project: US 63/ Ridgeway Engineering Design for Traffic Safety Improvements Agreement Date: Signed By Mayor on February 23, 2009 Engineering Firm: Ament The undersigned parties hereby agree to modify the above referenced agreement according to the terms and conditions described below: 1. Work & Items The following items required extra work that was not anticipated at the time of signing the agreement: • Design changes based on Iowa DOT's review of preliminary plans. Mast arm pole configuration was changed to keep the existing truss. • Additional surveying and design effort was also necessary when it was determined that the existing roadway culvert to drain the median adjacent to the lengthened northeast -bound US 63 left -turn lane could not be utilized and that two new pipe culverts would need to be jacked under the southwest -bound lanes of US 63. • Changes to plans and specifications format to accommodate a DOT letting. 2. Costs: The Agreement amount is increased by $6,500. The original agreement amount was $32,900. The new "not to exceed" amount is $39,400. Engineering Firm: Ament By: Title: Date: City of Waterlo By: Title: Date: 6‘, f