Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plumb Tech Inc-4/5/2010
:;AIA Document A101 TM- 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 24th day of March in the year 2010 (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other information) City of Waterloo Waterloo City Hall 715 Mulberry Street Waterloo, IA 50703 and the Contractor: (Name, legal status, address and other information) Plumb Tech, Inc. 32161 W. Airline Hwy Waterloo, IA 50703 for the following Project: (Install sump pumps for City of Waterloo Flood Mitigation located in Waterloo City Hall Building, Waterloo City Annex Building, Waterloo Public Library, and Waterloo Youth Pavilion) City of Waterloo Buildings Flood Mitigation Design Waterloo, IA This project is to install sump pumps for the City of Waterloo Flood Mitigation located in Waterloo City Hall Building, Waterloo City Annex Building, Waterloo Public Library, and Waterloo Youth Pavilion. The Engineer (Name, legal status, address and other information) Gilmor + Doyle, Ltd. 214 E. 4`h St. Waterloo, IA 50703 The Owner and Contractor agree as follows. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 T _2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A101 T" — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963,1967, 1974, 1977, 1987, 1991,1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) Upon signature of contracts. If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. I§ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: Work shall be completed by 7-14-2010 (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work) AIA Document A101"' — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and Is not for resale. User Notes; (1330996045) Inst. Portion of Work Substantial Completion Date , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work) ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be One hundred fifteen thousand eight hundred fifty dollars and no cents ($115,850.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) § 4.3 Unit prices, if any. (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit ($0.00) § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Price ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Engineer not later than the 15th day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the 15th day of the following month. If an Application for Payment is received by the Engineer after the application date fixed above, payment shall be made by the Owner not later than thirty ( 30 ) days after the Engineer receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. AIA Document A101 T" - 2007. Copyright ® 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201T"-2007, General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of percent ( %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-2007. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-2007. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. AIA Document A101" — 2007. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced byAlA software at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) § 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201-2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction) Arbitration pursuant to Section 15.4 of AIA Document A201-2007 Litigation in a court of competent jurisdiction Other (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-2007. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any) % § 8.3 The Owner's representative: (Name, address and other information) Debra Anderson Waterloo City Hall 715 Mulberry Street Waterloo, IA 50703 § 8.4 The Contractor's representative: (Name, address and other information) Mr. Zack Behrends Plumb Tech, Inc. 3261 W. Airline Hwy Waterloo, IA 50703 AIA Document A101 TM - 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) Init. § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner and Contractor. § 9.1.2 The General Conditions are AIA Document A201-2007, General Conditions of the Contract for Construction. 1 § 9.1.3 The Supplementary and other Conditions of the Contract: See attached list Document Title Date Pages 1 § 9.1.4 The Specifications: See attached list (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Date Pages 1 § 9.1.5 The Drawings: See attached list (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number § 9.1.6 The Addenda, if any: Tide Date Number Date Pages #1 3-9-2010 3 #2 3-11-2010 1 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents: .1 AIA Document E201TM-2007, Digital Data Protocol Exhibit, if completed by the parties, or the following: .2 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201-2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents AIA Document A101 "' - 2007. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. AH rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced byAlAsoftware at 16:09:51 on 03/24/2010 under Order No.3459948695_1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AM Document A201-2007.) Type of insurance or bond Bid Bond This Agreement tered into as of the day %/ OWNER ( ignature) `6-nt2s-- &. 06U/4--1 (Printed name and title) y Limit of liability or bond amount ($0.00) 5% ear first written above. CONTRACTOR (Signature) LA -e-I 1. I ( tp 'tom (Printed name and title) AIA Document A1017O - 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:09:51 on 03/2412010 under Order No.3459948695 1 which expires on 11/05/2010, and is not for resale. User Notes: (1330996045) TABLE OF CONTENTS GD - DIVISION 00 00 0101 NOTICE OF PROPOSED PUBLIC IMPROVEMENTS 1 001113 NOTICE TO BIDDERS 2 00 1115 INVITATION TO BID 1 00 2113 INSTRUCTIONS TO BIDDERS 6 00 2114 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 3 00 4100 BID FORM 1 00 7200 GENERAL CONDITIONS - AIA 1 00 7300 SUPPLEMENTARY CONDITIONS — AIA 1 GD - DIVISION 01 01 1100 SUMMARY OF WORK 1 01 1600 MATERIAL AND EQUIPMENT 2 01 1900 CONTRACT CONSIDERATIONS 2 01 3119 COORDINATION AND MEETINGS 3 01 3200 PROGRESS SCHEDULES 2 01 4000 QUALITY CONTROL 2 01 5000 CONSTRUCTION FACILITIES AND TEMPORARY 2 CONTROLS 01 7000 CONTRACT CLOSEOUT 3 City of Waterloo Buildings Bidding Information Flood Mitigation Design Table of Contents TABLE OF CONTENTS GD - DIVISION 22 PLUMBING 22 0050 BASIC PLUMBING REQUIREMENTS 7 22 0080 MINOR PLUMBING DEMOLITION FOR REMODELING 2 22 0090 PLUMBING SCHEDULE OF VALUES 1 22 0529 HANGERS & SUPPORTS/PLUMBING PIPING & 3 EQUIPMENT 22 0719 DOMESTIC PLUMBING INSULATION 4 221116 DOMESTIC PLUMBING PIPING 5 221119 DOMESTIC PLUMBING SPECIALTIES 3 22 3000 PLUMBING EQUIPMENT 3 City of Waterloo Buildings Division 22 Flood Mitigation Table of Contents GD - DIVISION 26 0050 26 0080 26 0090 26 0519 26 0526 26 0529 26 0533 26 0553 TABLE OF CONTENTS 26 ELECTRICAL BASIC ELECTRICAL REQUIREMENTS ELECTRICAL SCHEDULE OF VALUES MINOR ELECTRICAL DEMOLITION FOR REMODELING ELECTRICAL POWER CONDUCTORS AND CABLES GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS IDENTIFICATION FOR ELECTRICAL SYSTEMS 7 1 3 4 5 2 5 2 City of Waterloo Buildings Division 26 Flood Mitigation Table of Contents From: Sent: To: Subject: M E001 A100 M100 M200 E100 E200 Page 1 of 1 Travis J. Schrage, P.E. Monday, March 22, 2010 9:56 AM Julianne Kahn Water mitigation sheet index SYMBOL LIST, SEAL, SHEET INDEX ARCHITECTURAL FLOOR PLAN YOUTH PAVILION & LIBRARY MECHANICAL PLAN CITY HALL & CARNEGIE ANNEX MECHANICAL PLAN YOUTH PAVILION & LIBRARY ELECTRICAL PLAN CITY HALL & CARNEGIE ANNEX ELECTRICAL PLAN file://X:\Waterloo\2009\09-166 Waterloo Water Mitigation\Record Drawings\Spec\FINAL... 3/24/2010