Loading...
HomeMy WebLinkAboutCardinal Construction Inc-5/24/2010_L9IA Document G701TM - 2001 Change Order PROJECT (Name and address): New Fire Station #2 for the City of Waterloo, IA. TO CONTRACTOR (Name and address): Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 CHANGE ORDER NUMBER: 005 DATE: April 1, 2010 ARCHITECT'S PROJECT NUMBER: 08068 CONTRACT DATE: September 14, 2009 CONTRACT FOR: General Construction OWNER: ARCHITECT: 0 CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. Revise location of 2" cold water riser, 3/4" hose bib, duplex receptacles in sleeping rooms & the CATV outlet in the apparatus bay per owner's request per CD #3. B. Credit to delete automatic slide pole with a standard stainless steel pole and add a wall and door access to it per owner's request. C. Cost to provide weatherproof covers for wall receptacles in the apparatus bay, add door position switch & exterior door keypads as requested by owner. D. Cost to change finish on overhead doors to a Kynar finish. E. Cost to add three (3) additional empty conduit from apparatus bay to right of way in LaPorte Road per Owner's request. TOTAL TOTAL AMOUNT OF THIS CHANGE ORDER, REDUCE CONTRACT SUM BY ($1,434.00). The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 30, 2010. NO CHANGE DEDUCT ($10,075.00) ADD $ 5,051.00 ADD $ 1,490.00 ADD $ 2,100.00 ($ DEDUCT 1,434.00) $ 1,601,780.00 $ 52,500.00 $ 1,654,280.00 $ ( 1,434.00 i $ 1,652,846.00 AIA Document G701Th —2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:53:42 an 04/01/2010 under Order No.9839989696_1 which expires on 07/30/2010, and is not for resale. User Notes: (1735027571) NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, LLC ARCHITECT arm name) 314 East 4th Street, Waterloo, IA 50703 Ampi : r /, r' ( BY (Signatu fie) Daniel C. Charmer (Typed name) DATE Cardinal Construction, Inc. CONTRACTOR arm name) 531 Commercial Street, PO Box 897, Waterloo, IA 50704 ADDRESS BY (Signature) Jon Mixdorf (Typed name) — r0 DATE City of Waterloo OWNER (Firm name) 715 Mulberry Street, Waterloo, IA 5070 AD S 6 07J B ` (Signature) Ernest G. Clark (Typed nape) ley 10(0 DATE AIA Document G701", — 2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. Alt rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:53:42 on 04/01/2010 under Order No.9839989696_1 which expires on 07/30/2010, and is not for resale. User Notes: (1735027571) itAI A® Document G701 - 2001 Change Order PROJECT (Name and address): New Fire Station #2 for the City of Waterloo, IA. TO CONTRACTOR (Name and address): Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 CHANGE ORDER NUMBER: 005 DATE: April 1, 2010 ARCHITECT'S PROJECT NUMBER: 08068 CONTRACT DATE: September 14, 2009 CONTRACT FOR: General Construction OWNER: ARCHITECT: 0 CONTRACTOR: ❑ FIELD: 0 OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. Revise location of 2" cold water riser, 3/4" hose bib, duplex receptacles in sleeping rooms & the CATV outlet in the apparatus bay per owner's request per CD #3. NO CHANGE B. Credit to delete automatic slide pole with a standard stainless steel pole and add a wall and door access to it per owner's request. DEDUCT ($10,075.00) C. Cost to provide weatherproof covers for wall receptacles in the apparatus bay, add door position switch & exterior door keypads as requested by owner. ADD $ 5,051.00 D. Cost to change finish on overhead doors to a Kynar finish. ADD $ 1,490.00 E. Cost to add three (3) additional empty conduit from apparatus bay to right of way in LaPorte Road per Owner's request. ADD $ 2,100.00 TOTAL DEDUCT ($ 1,434.00) TOTAL AMOUNT OF THIS CHANGE ORDER, REDUCE CONTRACT SUM BY ($1,434.00). The original Contract Sum was $ 1,601,780.00 The net change by previously authorized Change Orders $ 52,500.00 The Contract Sum prior to this Change Order was $ 1,654,280.00 The Contract Sum will be decreased by this Change Order in the amount of $ C 1,434.00 } The new Contract Sum including this Change Order will be $ 1,652,846.00 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 30, 2010. AIA Document G701 TM — 2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. AB rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:53:42 on 04/01/2010 under Order No.9839989696_1 which expires on 07/30/2010, and is not for resale. User Notes: (1735027571) NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, LLC Cardinal Construction, Inc. City of Waterloo ARCHITECT (Firm name) CONTRACTOR (Firm name) 314 East 4th Street, Waterloo, IA 531 Commercial Street, PO Box 897, 50703 Waterloo, IA 50704 ADDRESS ADDRESS S / e, j OWNER (Firm name) 715 Mulberry Street, Waterloo, IA 5070 BY (Signature) Daniel C. Charmer (Typed name) DATE BY (Signature) Jon Mixdorf BY (Signature) Ernest G. Clark (Typed name) (Typed name), DATE DATE AIA Document G701 TM - 2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:53:42 on 04/01/2010 under Order No.9839989696_1 which expires on 07/30/2010, and is not for resale. User Notes: (1735027571)