Loading...
HomeMy WebLinkAboutAduddell Restoration and Waterproofing Inc-5/24/2010CHANGE ORDER NO. 3 Owner: City of Waterloo, Iowa Date: April 5, 2010 Project: Divisions I and II, East Park Avenue Parking Ramp Repairs Owner's Contract No.: — Contractor: Aduddell Restoration and Waterproofing, Inc/Granite-RE Date of Contract Start: June 25, 2008 $ You are directed to make the following changes in the Contract Documents. Description: 8006: Add - 2.5"x1.5" Hose Adaptors to Sprinkler Valve Assemblies- ADD $ 577.00 8007: Add - Repair Light Poles Top Level, Including Wiring and Lamps- ADD 1,643.00 8008: Add - Hose Connection Signs Near Each Sprinkler Valve- ADD .00 NET ADD TO CONTRACT PRICE $2,220.00 Reason for Change Order: 8006: Required by Fire Marshall 8007: Lights Not Working 8008: Required by Fire Marshall Signs to be supplied by City of Waterloo. Installation required by Contractor. CONTRACT PRICE Original: $ 1,177,047.06 Original: Previous C.O.s (ADD/DE-DUCT): $ 4,299.99 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DE-DUCT): $ 2,220.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,183,567.05 REVISED: CONTRACT TIMES (Calendar Days) To Final Completion November 30, 2008 May 30, 2009 Revised Completion Date: May 30, 2009 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT MALL APPLY HERETO APPROVED: By: ACCEPT By: er (Authorized Signature) t---tapt 471111.4( ontractor (Au orized Signature) Date: Date: Gia Lf to C:\Documents And Settings\Brad\Local Settings\Temporary Internet Files\OLKD\CO3-Eparkramp.Doc AECOM 105557.11.000 Project No. 3 Change Order No. CHANGE ORDER NO.3 Owner: City of Waterloo, lowa Date: April 5, 2010 Project: Divisions I and II, East Park Avenue Parking Ramp Repairs Owner's Contract No.: Contractor: Aduddell Restoration and Waterproofing, Inc/Granite-RE Date of Contract Start: June 25, 2008 $ You are directed to make the following changes in the Contract Documents. Description: 8006: Add - 2.5"x1.5" Hose Adaptors to Sprinkler Valve Assemblies- ADD $ 577.00 8007: Add - Repair Light Poles Top Level, Including Wiring and Lamps - ADD 1,643.00 8008: Add - Hose Connection Signs Near Each Sprinkler Valve- ADD _ .00 NET ADD TO CONTRACT PRICE $2,220.00 Reason for Change Order: 8006: Required by Fire Marshall 8007: Lights Not Working 8008: Required by Fire Marshall Signs to be supplied by City of Waterloo. Installation required by Contractor. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To Final Completion Original: $ 1,177,047.06 Original: November 30, 2008 Previous C.O.s (ADDT): $ 4,299.99 Previous C.O.s (ADD/DEDUCT): This C.O. (ADDT): $ 2,220.00 This C.O. (ADD/DEDUCT): May 30, 2009 Contract Price With All Approved Change Orders: $ 1,183,567.05 REVISED: Revised Completion Date: May 30, 2009 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT $TALL APPLY HERETO APPROVED: Aw By: gIJ ACCEPTED: By: er (Authorized Signature) Date: Co r�t`c or (Authorized Signature) Date: q -vv" IS? Zvi® C:\Documents And Settings\Brad\Local Settings\Temporary Internet Files\OLKD\CO3-Eparkramp.Doc AECOM 105557.11.000 3 Project No. Change Order No.