Change Request
Description: Davis -Bacon Wage Decision Overpayment
Source: Bulletin
Number. 4
Date: 3/2/10
Job: 09-050 Waterloo Boat House
Phone:
901 Black Hawk Road
Waterloo, IA 50701
Ph : 319-236.2003
We are pleased to offer the following specifications and pricing to make the following changes:
Difference in Davis -Bacon wages from wage determination specified/bid to correct wage decision required to be paid. Duration of
work from start of project to recognition of incorrect wage decisionlissue on 1/22/2010 - prior to receipt of notification that
Davis -Bacon wages not required on 2/26/2010. See attached summary.
ft is assumed that no subcontractors have been affected by this change, as minimal work was performed on-site by subcontractors
during the period in question and no requests have been made. We don't feel it is appropriate to request changes from them unless
requested by the City of Waterloo.
Description
Labor Material Equipment Subcontract Other Price
Reinforcing Steel $6,011.01
If you have any questions, please contact me at 319-236-2003.
Submitted by: Dan Keagle
Peters Construction Corp.
Cc: File
86,011.01
Subtotal: $6,011.01
Bond $6,011.01 1.50% 890.17
Contractor's Fee $6,101.18 15.00% $915.18
Approved by:
Date*
Total: 87,016.36
Page 1 of 1
PETERS
CONSTRUCTION CORPORATION
To: Larry Kurtz
AHTS Architects, P.L.C.
327 E. 4th St Ste. 204
Waterloo, IA 50703
Ph: (319)233-1163 Fax: (319)233-9863
Change Request
Description: Flood Demobilization-Remobilization-Clean-up
Source: Other
Number: 6
Date: 5/12110
Job: 09-050 Waterloo Boat House
Phone:
901 Black Hawk Road
Waterloo, IA 50701
Ph : 319-236-2003
We are pleased to offer the following specifications and pricing to make the following changes:
Demobilization, Remobil nation, and Clean-up Expenses for flooding that occurred at the project site from March 12-22, 2010.
Work Includes:
Flood Evacuation of Materials/Equipment
Remobiiization of Materials/Equipment to the jobsite
Flood Clean -Up.
Pumping Water from building excavations.
Repairs to Temporary Electric Panel from being submerged.
"REVISED 5/12/2010 to remove Premium Time for Wall Pour per rejection by Rick Curran.
**Repairs of asphalt parking due to flood damage not included in this change request, but to be included In a different change
request at a Tater date if work required by owner.
*'`Loss of backfill material stockpile not included in this change request, will be processed under a different change request at a later
time once volume can be determined.
Description
Labor Material Equipment Subcontract Other Price
Flood Evacuation - 63 hours $1,764.00 $1215.00 $2,979.00
Re -Mobilization - 30 hours $840.00 $775.00 $1,615.00
Flood Clean -Up -6 hours $168.00 $60.00 $228.00
Pump Water from Bldg. -4 hours $112.00 $30.00 $142.00
Electrical - Repair Temp Elec. Panel $340.00
$340.00
Subtotal: $5,304.00
Bond $5,304.00 1.50% $79.56
Contractor's Fee $5,383.56 15.00% $807.53
Please note that Peters Construction Corporation will require an extra 15 days.
If you have any questions, please contact me at 319-236-2003.
Submitted by: Dan Keagle
Peters Construction Corp.
Cc: File
Approved by:
Date.
Total: 66,191.09
Page 1 of 1
PETERS
CONSTRUCTION CORPORATION
To: Larry Kurtz
AHTS Architects, P.L.C.
327 E. 4th St. Ste. 204
Waterloo, IA 50703
Ph: (319)233-1163 Fax: (319)233-9863
Change Request
Number: 7
Date: 4/7/10
Job: 09-050 Waterloo Boat House
Phone:
Description: Additional Lighting Fixtures per Lighting Re -Submittals
Source: Other
We are pleased to offer the following specifications and pricing to make the following changes:
Lighting Cost Changes per Lighting Resubmittals.
901 Black Hawk Road
Waterloo, IA 50701
Ph : 319-236-2003
Description
Labor Material Equipment Subcontract Other
Price
Electrical
If you have any questions, please contact me at 319-236-2003.
8280.00 $280.00
Subtotal: $280.00
Bond $280.00 1.50% $4.20
Contractor's Fee $28420 15.0D% $42.63
Total: $326.83
Submitted by: Dan Keagle