HomeMy WebLinkAboutPeters Construction Corp-6/7/2010PETERS CONSTRUCTION CORPORATION To: Larry Kurtz AHTS Architects, PLC. 327 E. 4th St. Ste. 204 Waterloo, IA 50703 Ph: (319)233-1163 Fax: (319)233-9863 Change Request Description: Davis -Bacon Wage Decision Overpayment Source: Bulletin Number. 4 Date: 3/2/10 Job: 09-050 Waterloo Boat House Phone: 901 Black Hawk Road Waterloo, IA 50701 Ph : 319-236.2003 We are pleased to offer the following specifications and pricing to make the following changes: Difference in Davis -Bacon wages from wage determination specified/bid to correct wage decision required to be paid. Duration of work from start of project to recognition of incorrect wage decisionlissue on 1/22/2010 - prior to receipt of notification that Davis -Bacon wages not required on 2/26/2010. See attached summary. ft is assumed that no subcontractors have been affected by this change, as minimal work was performed on-site by subcontractors during the period in question and no requests have been made. We don't feel it is appropriate to request changes from them unless requested by the City of Waterloo. Description Labor Material Equipment Subcontract Other Price Reinforcing Steel $6,011.01 If you have any questions, please contact me at 319-236-2003. Submitted by: Dan Keagle Peters Construction Corp. Cc: File 86,011.01 Subtotal: $6,011.01 Bond $6,011.01 1.50% 890.17 Contractor's Fee $6,101.18 15.00% $915.18 Approved by: Date* Total: 87,016.36 Page 1 of 1 PETERS CONSTRUCTION CORPORATION To: Larry Kurtz AHTS Architects, P.L.C. 327 E. 4th St Ste. 204 Waterloo, IA 50703 Ph: (319)233-1163 Fax: (319)233-9863 Change Request Description: Flood Demobilization-Remobilization-Clean-up Source: Other Number: 6 Date: 5/12110 Job: 09-050 Waterloo Boat House Phone: 901 Black Hawk Road Waterloo, IA 50701 Ph : 319-236-2003 We are pleased to offer the following specifications and pricing to make the following changes: Demobilization, Remobil nation, and Clean-up Expenses for flooding that occurred at the project site from March 12-22, 2010. Work Includes: Flood Evacuation of Materials/Equipment Remobiiization of Materials/Equipment to the jobsite Flood Clean -Up. Pumping Water from building excavations. Repairs to Temporary Electric Panel from being submerged. "REVISED 5/12/2010 to remove Premium Time for Wall Pour per rejection by Rick Curran. **Repairs of asphalt parking due to flood damage not included in this change request, but to be included In a different change request at a Tater date if work required by owner. *'`Loss of backfill material stockpile not included in this change request, will be processed under a different change request at a later time once volume can be determined. Description Labor Material Equipment Subcontract Other Price Flood Evacuation - 63 hours $1,764.00 $1215.00 $2,979.00 Re -Mobilization - 30 hours $840.00 $775.00 $1,615.00 Flood Clean -Up -6 hours $168.00 $60.00 $228.00 Pump Water from Bldg. -4 hours $112.00 $30.00 $142.00 Electrical - Repair Temp Elec. Panel $340.00 $340.00 Subtotal: $5,304.00 Bond $5,304.00 1.50% $79.56 Contractor's Fee $5,383.56 15.00% $807.53 Please note that Peters Construction Corporation will require an extra 15 days. If you have any questions, please contact me at 319-236-2003. Submitted by: Dan Keagle Peters Construction Corp. Cc: File Approved by: Date. Total: 66,191.09 Page 1 of 1 PETERS CONSTRUCTION CORPORATION To: Larry Kurtz AHTS Architects, P.L.C. 327 E. 4th St. Ste. 204 Waterloo, IA 50703 Ph: (319)233-1163 Fax: (319)233-9863 Change Request Number: 7 Date: 4/7/10 Job: 09-050 Waterloo Boat House Phone: Description: Additional Lighting Fixtures per Lighting Re -Submittals Source: Other We are pleased to offer the following specifications and pricing to make the following changes: Lighting Cost Changes per Lighting Resubmittals. 901 Black Hawk Road Waterloo, IA 50701 Ph : 319-236-2003 Description Labor Material Equipment Subcontract Other Price Electrical If you have any questions, please contact me at 319-236-2003. 8280.00 $280.00 Subtotal: $280.00 Bond $280.00 1.50% $4.20 Contractor's Fee $28420 15.0D% $42.63 Total: $326.83 Submitted by: Dan Keagle Peters Construction Corp. Cc: File Approved by: -'. `- Date: tell 1,0 i° Page 1 of 1