Cardinal Construction Inc-6/14/2010
IttA Document G701' - 2001 Change Order PROJECT (Name and address): New Fire Statin for the City of Waterloo, IA. TO CONTRACTOR (Name and address): Cardinal Construction, Inc. 531 Commercial Street PO Box 897 Waterloo, IA 50704 CHANGE ORDER NUMBER: 006 DATE: May 25, 2010 ARCHITECT'S PROJECT NUMBER: 08068 CONTRACT DATE: September 14, 2009 CONTRACT FOR: General Construction OWNER: 0 ARCHITECT: 0 CONTRACTOR: 0 FIELD: ❑ OTHER: 0 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. Cost to adjust walls to allow dining area to increase in size as requested by Owner. B. Credit to delete interior bollards at the overhead doors in apparatus bay. C. Cost to install 3" PVC conduit under East drive for future for traffic controls as requested by Owner. D. Cost to add 3" floor drain and vent in room #113 Work Room as requested by Owner. REDUCE SPECIFIED GENERAL ALLOWANCE FROM $3,200.00 TO ZERO. REDUCE SPECIFIED ELECTRICAL ALLOWANCE FROM $2,500.00 TO $588.00 it CONTRACT SUM REMAINS THE SAME The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be Add $1,485.00 Deduct ($ 170.00) Add $2,545.00 Add $1.252.00 TOTAL $5,112.00 ` S,/l� $ 1,601,780.00 $ 51,066.00 $ 1,652,846.00 $ 0.00 $ 1,652,846.00 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is September 30, 2010. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive: NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, PLC ARCHITECT (Firm name) 314 East 4th Street, Waterloo, IA 50703 ADDRES��S ' C6)",' BY (Signature) Daniel C. Charmer (Typed name) X1/7 DATE Cardinal Construction, Inc. CONTRACTOR (Finn name) 531 Commercial Street, PO Box 897, Waterloo, IA 5.0704 ADDRE City of Waterloo OWNER (Firm name) 715 Mulberry Street, Waterloo, IA 50703 BY (Signature Jon Mixdorf (Typed name) DATE (Signature) Ernest G. Clark (Typed name) DATE AIA Document G701 T1° - 2001. Copyright© 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:30:32 on 05/25/2010 under Order No.1000367524_1 which expires on 08/21/2010, and is not for resale. User Notes: (1179666992)