Loading...
HomeMy WebLinkAboutModern Builders Inc-10/17/2016 (2)CHANGE ORDER NO. 1 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 11, 2016 Project Bag Makeup Door Replacement on Terminal Building Owner's Contract No. State Contract Nos. 16609 and 17448 Contractor Modern Builders, Inc. Date of Contract Start September 19, 2016 You are directed to make the following changes in the Contract Documents. Description: ITEM DESCRIPTION UNIT PRICE QUANTITY AMOUNT 101 INTERLOCK EXISTING DOORS WITH HIGH SPEED ROLL UP DOORS LS $ 2,600.00 1 $ 2,600.00 TOTALS $ 2,600.00 Reason for Change Order: Item 101 — Decision was made during the bidding process to leave existing garage type doors in place and install high speed roll up doors on the exterior of the building. This change order interlocks the two door operator systems so that the high speed door will not operate unless the slower garage door is open. The interlocking of these systems will help provide potential damage to the garage doors that are remaining in place. Terminal Building Bag Makeup Doors CO -1 Project No — 60482850 1 CONTRACT PRICE CONTRACT TIMES (Calendar Date) Substantial Final completion completion Original: 11/18/2016 Previous C.O.s (ADD): 0 This C.O. (ADD): 0 REVISED: 11/18/2016 Original: Previous C.O.s (ADD): This C.O. (ADD): Contract Price with all approved Change Orders: 48,800.00 0.00 2,600.00 $ 51,400.00 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: i. Engineer (Authorized Signature) APPROVED: By: Owner (Authorized Signature) ACCEPTED: By: Cori ctor (Authorized n ature) Date Date Date Terminal Building Bag Makeup Doors CO -1 Project No — 60482850 2