Loading...
HomeMy WebLinkAboutAecom Technical Services-10/24/2016A=COM October 14, 2016 Mr. Steven Hoambrecker Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Subject: Sanitary Sewer Improvements FY 2015 Phase II CIP Pipe Lining Project Change Order No. 3 City of Waterloo, Iowa City Contract No. 876 AECOM #60339160 Dear Mr. Hoambrecker. Attached is Change Order No. 3 for the Sanitary Sewer Improvements FY 2015 Phase II CIP Pipe Lining project. The following is included in this Change Order 1. Deductions for CIPP segment removals due to damaged pipe. These segments could not be Tined. 2. Addition for pipe cleaning associated with the damage pipe deductions. The contractor must clean the pipe segments prior to completing the Pre -Televising work. The contractor spent time cleaning the pipe before the damage was discovered. Cleaning is incidental to the CIPP lining and the contractor would not be paid for this work. The contractor requested to be paid for this work that is no longer covered under the CIPP bid items. 3. Reconciliation of the Bid Quantities and Change Order No. 1 and 2 Quantities to match quantities installed. AECOM recommends that the City of Waterloo authorize Change Order No. 3 for the deduction amount of - $30,388.65 decreasing the total project cost to $1,734,590.95. Yours sincerely, Christopher G. Oelkers, P.E. Attachment Change Order No. 3 Authorization form Change Order No. 3 Tabulation Pipe Cleaning Tabulation c: Ms. Suzy Schares — City of Waterloo (w/attachment) P:1603391601600 Construction_Support1665 Change Orders1CO No. 3120161014 CIP Phase II - CO No 3 LTR.docx Owner. Project: City of Waterloo CHANGE ORDER NO. 3 Date: October 14, 2016 Sanitary Sewer Improvements FY 2015 Phase II CIP Pipe Lining Project Owner's Contract No.: 876 Contractor: Municipal Pipe Tool Company, LLC Date of Contract Start: February 2, 2015 $ 1,471,353.90 You are directed to make the following changes in the Contract Documents. Description: See attached Change Order No. 3 spread sheet. • 10 segments are removed from the project for the following reasons o Existing Pipe is too damaged to install the CIPP. o Time constraints due to the onset of winter. • Removed Segment Cleaning o Recommend that the contract be paid on a time basis for cleaning of the existing pipes that were removed from the project due to existing pipe damage. • Quantity Reconciliation o Pipe quantity changes are due to differences in the planned quantity and the actual installed quantity. o Manhole quantity changes are due to over estimation and change of installed product. • Change Order No. I manhole quantity correction reconciles quantities added to the contract in Change Order No. 1 Reason for Change Order: Segment removals and final quantity reconciliation. CONTRACT PRICE Original: Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,471,353.90 $ 293,625.70 $ (30,388.65) Original: Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/): CONTRACT TIMES (Calendar Days) To Substantial To Final Completion Completion September 25, 2015 October 9, 2015 3 Months 3 Months 6 Months 6 Months $ 1,734,590.95 REVISED: June 24, 2016 June 30, 2016 Original Completion Date: Revised Completion Date: September 25, 2015 October 9, 2015 June 24, 2016 June 30, 2016 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVE BY: Owner (Authorized Signature) ACCEPTED: By: 7 Contractor (Authorized Signature) Date: 10/14/16 Date: P:\60339160\600_Corewction_Support\665 Change Orders \CO No. 3\20161014 PH H C1P Change Order No. 3.doc AECOM 60339160 3 Project No. Change Order No. NM MN MI OEM MN RIME Ma MINN 113.11.10.11.1. 1111 Mpl NOW -21.101” MOO LEMMILII 6.0 SL 1=.3 CEMM11 O . mmm 13M0IM)CYfl11717lE•0 10E1.11111E1 19,mo 001.0 0.8 00 1.8.11 00-0 CCO MN VIM NM MM. NM MEW Ea•cuao drat MTN �� lerAt IBI 1.1.111 1111111111=1==1mM=1110 7ii1 =lll:=Mmm111=E000= .00210 WOK $ 131rell 00 03111,00. OAlmnoSENNIN 0 6 ON .111m1. MOM UM M=1=i=lomorr m=mmmm00000 MMMT •r�•[>_�->_••r[>—. - •c'n� `-.>_c>.,.—�.-.- -131 mac:.—.:>�•u—>� ::21mmmVTmmmm mg Inawao'�.wa 'CO Y9@IonmW 09L6.3308 xMA%de MOWN w•n•wmoam o�aw� uekwl.wn am GIA! • mvwuan+W a•e6 w6 Pipe Cleaning for Segments Removed from the Project San Sewer Improvements - FY15 CIPP Listing Project City of Waterloo City Contract No. 876 AECOM Project No: 60339160 Wednesday, August 31, 2016 INSTALL - DEDUCT Cleaning DWG CO SA MH MH Route 8' 10' 12 Rd Cost Total Hours Cost TOTAL Description 13 1 16 12-07 12-00 Aladdin Street 233 $ 19.35 $(4,508.55) 5.2 3275.00 $ 1,430.00 Collapsed Pipe 85 -ft south of MH 12-08 14 1 16 10-15 10-18 Carriage Hifi Road 200 $ 19.35 $(3,870.00) 4.2 $275.00 $ 1,155.00 Service Protrusions 29 2 15 05-05-08 05-05-07 Coachman Drive 160 $ 19.35 5(3,096.00) 333 5275.00 $ 915.75 Collapsed/Offset Pipe @ 8.6 ft 35 2 17 20-06-01 20-06-02 Williston RD/Leavitt ST Alley 330 $ 19.35 $(6,385.50) 6.86 5275.00 $ 1,868.50 Collapsed Pipe 12 -ft West of MH 20-08-02 4 2 11 10-07 10-08 Sumner Street 69 $ 28.50 $(1,96&50) 4.4 3275.00 $ 1,210.00 Collapsed Line 20 and 63 -ft from MH 10-08 4 2 11 10-08 10-09 Sumer Street 200 $ 28.50 5(5,700.00) 4.2 5275.00 $ 1,155.00 Collapsed Line 74 and 122 -ft from MH 10-09 13 18 12-07 12-08 Aladdin Street 16 $ 19.35 $ (309.80) Quantity entered as 233-5 in CO 1. Bid Length is 249 -If 28 19 10-18 10-15 Prospect Boulevard 300 $ 21.50 5(6,450.00) 6.24 3275.00 $ 1,716.00 flows 22547-11488 Collapsed Pipe 14 -ft South of MH 10-15 26 19 10-18 10-19 Prospect Boulevard 398 $ 21.50 5(8,557.00) 828 5275.00 $ 2,277.00 Collapsed Pipe 218 -ft South of MH 10-18 32 19 30-16-03 30.18-02 Winn Street 301 $ 28.50 5(8,578.50) 628 $275.00 $ 1,721.50 No MH on the end. Can't fine 29 16 12-21 12-20 Valley Drive 280 $ 19.35 $(5,031.00) 5.41 5275.00 $ 1,487.75 Collapsed pipe at 83' and 200 30 18 10-11 10-11-01 Carriage Hill Road 247 $ 19.35 5(4,779.45) 11.81 5275.00 $ 3,247.75 Transition from 8' to 6' 15 _ 16 10-01 10-01-03 Hickory Street 144 $ 19.35 $(2,786.40) 3 3275.00 $ 825.00 Service Protrusions TOTAL DEDUCT $ (62,018.50) CLEANING TOTAL $19,027.25 CHANGE ORDER NO. 1 $ (8,378.55) CHANGE ORDER NO. 2 $ (17,148.00) CHANGE ORDER NO. 3 $ (38,491.85) $ 2,885.00 $ 8,167.25 $ 11,276.00