Loading...
HomeMy WebLinkAboutAecom Technical Services-11/28/2016AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com FY 2017 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91160AL0200 IDOT CONTRACT NO. 18516 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description: See Attachment Scope of Services: See Attachment Compensation Compensation for services will be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed for a not -to -exceed fee of Twenty - Two Thousand Two Hundred Dollars ($22,200.00) without authorization of the Client. General Conditions Except as specifically amended by this Individual Project Agreement, services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. ("ATS") and the City of Waterloo ("Client") dated April 15, 2014. APPROVED: CITY OF WATERLOO, IOWA By Quentin Hart, Mayor APPROVED: AECOM TECHNICAL SERVICES, INC. `6 Date Date COW o. we 4 Douglas W::S„ 9hmdel, P.E. Associate Vice President November 18, 2016 SCOPE OF SERVICES FY 2017 VERTICAL INFRASTRUCTURE PROJECTS IDOT PROJECT NO. 91170AL0200 IDOT CONTRACT NO. 18516 WATERLOO REGIONAL AIRPORT WATERLOO, IOWA 1. Project Description The project is described as the projects associated with the Iowa Department of Transportation FY 2017 Vertical Infrastructure Projects. Projects identified in the grant include the following: 1. General Aviation Terminal Building Rehabilitation: Project will replace the windows in the conference room which exhibit signs of rot in the window seals and are no longer operable, replacement of the pedestrian doors on the north side of the building and replacement of two roof mounted air handling units that are in excess of 20 years old and require extensive maintenance. 2. Hangar 5 Rehabilitation: Project will replace the rain gutter system and reconstruction of the eave flashing to eliminate rain water entering the hangar. The project also involves the replacement of the existing interior lights with a new LED lighting system. 11. Scope of Services The work to be performed by ATS includes the following tasks: 1. Data Collection and Review. This task consists of the collection of existing data applicable to this project and related to the proposed work site. The record drawings of completed projects and utility information will be compiled as background information for the project. The Client shall coordinate with lease holders of the General Aviation Terminal Building and Hangar No. 5 so that ATS can gain access to these in a timely manner for the purpose of survey, investigation and photographic documentation of their existing conditions. 2. Final Design. This task consists of the preparation of the final bid documents for this project, including specifications, drawings (if required) and cost estimates. The final plans and/or specifications will set forth the requirements of the design phase. 3. Final Project Specifications. This task consists of the preparation of specifications for the project. The specifications will be in compliance with current City of Waterloo and Iowa Department of Transportation requirements in effect at the time the specifications are prepared. 4. Estimate of Probable Construction Cost. This task consists of the preparation of an estimate of construction costs based upon the plans and specifications. This statement of probable construction cost prepared by ATS represents ATS's best judgment as a design professional at the time the estimate is drawn. It is recognized, however, that neither ATS nor the Client has any control over the cost of labor, materials or equipment; over the contractor's method of determining bid prices; or over competitive bidding or market conditions. Accordingly, ATS cannot and does not guarantee that bids will not vary from any Statement of Probable Construction Cost or other cost estimates prepared by ATS. -2- 5. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 6. Bid Assistance. This task consists of assisting the Client in advertising for and receiving bids or quotes, analyzing the bids or quotes received and preparing a recommendation to the Client for award of contract. 7. Bid Document Interpretation. This task consists of answering bid document interpretation questions from bidders, preparing and issuing any required addenda. 8. Resident Review. This task consists of limited on-site construction review at key critical construction operations to observe construction operations to determine compliance with contract documents. Site reviews will be documented in a construction journal. Coordination with airport tenants related to this project will be the responsibility of the Client. 9. Project Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. O:\Administration\AGREE\PROF\ALO 2017 IDOT CSVI .doc -3- 2017 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa !DOT Project No. 91160ALO200 / Contract No. 18516 Engineering Services Consultant Cost Summary Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 8 $80.00 $640.00 Project Professional 22 $57.00 $1,254.00 Staff Professional 56 $44.50 $2,492.00 Professional 0 $36.45 $0.00 CADD Operator II 32 $33.80 $1,081.60 CADD Operator I 24 $24.45 $586.80 Senior Technician 40 $34.60 $1,384.00 Technician 0 $25.60 $0.00 Project Support 16 $29.90 $478.40 $7,916.80 198 II. Payroll Burden and Overhead Costs 139.14% $11,015.44 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 400 0.540 216.00 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 500 0.06 30.00 Color Copies 50 0.22 11.00 Plan Copier 100 0.50 50.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Nuclear Density Guage 0 40.00 0.00 Miscellaneous, Other 200.00 $507.00 IV. AECOM Estimated Actual Costs $19,439.24 Rounded $19,400.00 V. Subcontract Expense $0.00 VI. Estimated Actual Costs $19,400.00 VII. Fixed Fee (15% of Items I & II) Rounded $2,800.00 VIII. Maximum Amount Payable $22,200.00 2017 Commerical Service Vertical Infrastructure Waterloo Regional Airport Waterloo, Iowa !DOT Project No. 91160AL0200 / Contract No. 18516 Engineering Services Staff Hour Estimate Item Description No. Senior Prof Project Prof Staff Prof Prof CADD Operator II CADD Operator I Senior Technician Technician Project Support Totals 1 Data Collection & Review 8 8 2 Project Plans 8 24 32 64 3 Project Specifications 8 8 8 24 4 Estimate of Construction Cost 4 4 5 Quality Review 4 24 28 6 Bid Assistance 2 4 6 7 Bid Document Interpretation 2 4 6 8 Resident Review 40 40 9 Construction Administration 2 8 8 18 Total Engineering Services 8 22 56 0 32 24 40 0 16 198