HomeMy WebLinkAboutAspro Inc-12/5/2016CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: F.Y. 2015 STREET RECONSTRUCTION PROGRAM CONTRACT NO. 873 Date Prepared: November 28, 2016 AMOUNT: $163,957.18 INCREASE TO: ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated March 16, 2015 . A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid items. See attached summary. CITY OF WATERLOO BY: !.. Mayor ATTEST: ity Clerk Change Order No. 3 NET INCREASE $163,957.18 ASPRO, INC. Date CONTRACTOR /e", Date BY:772 PRINTED NAME: Milt Dakovich /i.// 9//I Date TITLE: President APPROVED: City Engineer Date Contract No. 873 Page 1 of 1 F.Y. 2015 STREET RECONSTRUCTION PROGRAM - CONTRACT NO. 873 QUANTITY INCREASE DECREASE SUMMARY BID ITEM DESCRIPTION UNIT ASPRO PLAN FINAL INCR/DECR INCR/DECR UNIT $ QTY QTY QTY AMOUNT DIVISION I BASE BID - SECTION I 1 MISC. CURB AND GUTTER, PCC, 6", C-4 LF $35.00 21.0 0 (21.0) ($735.00) 2 REMOVE AND REPLACE MISC. 7.5" HMA SY $140.00 87.9 0 (87.9) ($12,306.00) 3 REMOVE AND REPLACE MISC. 6" PCC, M-4 SY $75.00 44.4 110.6 66.2 $4,965.00 4 REMOVE/REPLACE MISC. SEALCOAT W/ 2" HMA SY $42.25 15.1 0 (15.1) ($637.98) 5 ACC DRIVEWAY APPROACH TON $190.00 20.0 1.3 (18.7) ($3,553.00) 6 REMOVE AND REPLACE MISC. HMA, 4" SY $50.00 453.7 319.5 (134.2) ($6,710.00) 7 DRIVEWAY APPROACH AND S/W, 6" PCC, C-4 SY $44.75 571.8 555.3 (16.5) ($738.38) 8 DRIVEWAY APPROACH AND S/W, 5" PCC, C-4 SY $43.75 1577.1 2041.8 464.7 $20,330.63 9 SIDEWALK, 4" PCC, C-4 SY $42.50 390.1 451.9 61.8 $2,626.50 10 PEDESTRIAN RAMP, PCC SIDEWALK, 6" PCC, C-4 SY $46.00 451.5 561.4 109.9 $5,055.40 11 PEDESTRIAN RAMP DETECTABLE WARNING SURFACE SF $37.00 584.0 561.6 (22.4) ($828.80) 12 SIDEWALK CURB SECTION LF $35.00 163.9 60.3 (103.6) ($3,626.00) 13 MISCELLANEOUS CONCRETE CY $800.00 3.0 1 (2.0) ($1,600.00) 14 CONCRETE PAVEMENT REMOVAL SY $4.25 18064.6 22134.3 4,069.7 $17,296.23 15 ASPHALT PAVEMENT REMOVAL SY $4.25 12566.3 9476.8 (3,089.5) ($13,130.38) 16 SIDEWALK AND DRIVEWAY REMOVAL SY $4.25 2632.5 2657.7 25.2 $107.10 17 SIDEWALK REMOVAL SY $10.00 250.5 455 204.5 $2,045.00 18 SAW CUT LF $5.00 1635.0 1764 129.0 $645.00 19 GEOGRID SY $4.50 9494.5 0 (9,494.5) ($42,725.25) 20 WOVEN GEOTEXTILE SY $4.50 13211.6 16827.5 3,615.9 $16,271.55 21 MODIFIED SUBBASE TON $22.00 14496.30 21577.4 7,081.1 $155,784.20 22 RECYLED ASPHALT PAVING TON $48.00 10.0 0 (10.0) ($480.00) 23 ROADSTONE, 3/4" TON $48.00 88.70 54.07 (34.6) ($1,662.24) 24 DRAIN TILE, 6" LF $8.95 17858.9 17147 (711.9) ($6,371.51) 25 DRAIN TILE, 4" LF $7.40 76.0 172 96.0 $710.40 26 DRAIN TILE STUB, 4" LF $17.40 1120.0 1105 (15.0) ($261.00) 27 DRAIN TILE TAP AND COLLAR EACH $650.00 19.0 16 (3.0) ($1,950.00) 28 SUBDRAIN OUTLET (DR -303) EACH $300.00 63.0 57 (6.0) ($1,800.00) 29 CONVERT WATER VALVE MANHOLE TO ROADBOX EACH $525.00 3.0 5 2.0 $1,050.00 30 WATER SERVICE CORPORATION, 3/4" EACH $50.50 23.0 1 (22.0) ($1,111.00) 31 WATER SERVICE CURB STOP, 3/4" EACH $155.00 23.0 3 (20.0) ($3,100.00) 32 WATER SERVICE PAVE BOX, 3/4" EACH $155.00 23.0 4 (19.0) ($2,945.00) 33 COPPER WATER SERVICE, 3/4" LF $23.60 641.0 157 (484.0) ($11,422.40) 34 WATER SERVICE CORPORATION, 1" EACH $54.00 1.0 1 0.0 $0.00 35 WATER SERVICE CURB STOP, 1" EACH $205.00 1.0 0 (1.0) ($205.00) 36 WATER SERVICE PAVE BOX, 1" EACH $205.00 1.0 1 0.0 $0.00 37 COPPER WATER SERVICE, 1" LF $24.20 40.0 0 (40.0) ($968.00) 38 WATER SERVICE CORPORATION, 2" EACH $290.00 1.0 0 (1.0) ($290.00) 39 WATER SERVICE CURB STOP, 2" EACH $500.00 1.0 0 (1.0) ($500.00) 40 WATER SERVICE PAVE BOX, 2" EACH $255.00 1.0 0 (1.0) ($255.00) 41 COPPER WATER SERVICE, 2" LF $35.95 45.0 0 (45.0) ($1,617.75) 42 WATER SERVICE KILL EACH $385.00 12.0 11 (1.0) ($385.00) 43 WATER SERVICE TAP, 2" EACH $115.00 1.0 0 (1.0) ($115.00) 44 LOWER WATER SERVICE, 3/4" OR 1" EACH $775.00 1.0 0 (1.0) ($775.00) 45 UNDERGROUND INVESTIGATION -WATER EACH $335.00 2.0 9.5 7.5 $2,512.50 46 TOPSOIL, 4" SY $16.75 4874.2 5489.3 615.1 $10,302.93 47 HYDROSEED SY $3.10 1020.0 744.4 (275.6) ($854.36) 48 TOPSOIL REMOVAL FROM PARKING, EARTHWORK SY $10.40 1530.0 7163.5 5,633.5 $58,588.40 49 CONSTRUCTION SURVEY LS $42, 935.00 1.00 1 0.0 $0.00 2001 CONSTRUCTION SURVEY - EXTRA FOR MOURNING DOVE LS $527.50 1.00 1 0.0 $0.00 50 TRAFFIC CONTROL LS $35,000.00 1.00 1 0.0 $0.00 51 DETOUR ROUTES - HUMMINGBIRD CIRCLE LS $3,000.00 1.0 0 (1.0) ($3,000.00) 52 DETOUR ROUTES- E. MITCHELL/BALTIMORE LS $3,000.00 1.0 1 0.0 $0.00 53 PAINTED PAVEMENT MARKING, WATER BASED STA $50.00 43.180 19.355 (23.8) ($1,191.25) 1001 REMOVE AND REPLACE MISC CURB AND GUTTER, 8" PCC (E 4TI- LF $34.10 75.0 74 (1.0) ($34.10) 1002 REMOVE AND REPLACE 4" PCC SIDEWALK (E 4TH) SF $6. 05 100.0 91.3 (8.7) ($52.64) TOTAL BASE BID - DIVISION I SECTION I $170,353.81 Page - 1 12/5/2016 3:29 PM F.Y. 2015 STREET RECONSTRUCTION PROGRAM - CONTRACT NO. 873 QUANTITY INCREASE DECREASE SUMMARY UNIT ASPRO PLAN FINAL INCR/DECR INCR/DECR DIVISION I BASE BID - SECTION II UNIT $ QTY QTY QTY AMOUNT 54 STORM SEWER, 2000D, 36" LF $88.15 20.0 0 (20.0) ($1,763.00) 55 STORM SEWER, 2000D, 30" LF $78.00 20.0 0 (20.0) ($1,560.00) 56 STORM SEWER, 2000D, 24" LF $70.00 10.0 0 (10.0) ($700.00) 57 STORM SEWER, 2000D, 18" LF $68.00 12.0 16 4.0 $272.00 58 STORM SEWER, 2000D, 15" LF $39.15 329.3 279 (50.3) ($1,969.25) 59 STORM SEWER, 2000D, 12" LF $38.00 1024.8 978.8 (46.0) ($1,748.00) 60 STORM MANHOLE, TYPE A, 48" EACH $3, 705.00 10.0 12 2.0 $7,410.00 61 STORM MANHOLE, TYPE A, 60" EACH $5, 000.00 2.0 2 0.0 $0.00 62 SW -402 MODIFIED RECTANGULAR STORM MANHOLE EACH $4,500.00 3.0 4 1.0 $4,500.00 63 REMOVE EXISTING STRUCTURE EACH $525.00 28.0 23 (5.0) ($2,625.00) 64 REMOVE STORM SEWER PIPE LESS THAN 36" LF $9.30 399.3 327 (72.3) ($672.39) 65 TYPE E -1-C INLET EACH $2,475.00 18.0 17 (1.0) ($2,475.00) 66 TYPE E -2-C INLET EACH $3,395.00 11.0 11 0.0 $0.00 67 TYPE E -3-C INLET EACH $4, 425.00 2.0 2 0.0 $0.00 68 TYPE E -1-C INLET, MODIFIED EACH $3,920.00 2.0 2 0.0 $0.00 69 TYPE E -2-C INLET, MODIFIED EACH $4,980.00 2.0 0 (2.0) ($9,960.00) 70 TYPE SW -507 INLET EACH $3,700.00 2.0 0 (2.0) ($7,400.00) 71 TYPE SW -509 INLET EACH $4,500.00 2.0 0 (2.0) ($9,000.00) 72 REM/REPL INLET BOXOUT, E -1-C EACH $1,035.00 6.0 5 (1.0) ($1,035.00) 73 REM/REPL INLET BOXOUT, E -2-C EACH $1,140.00 3.0 3 0.0 $0.00 74 REM/REPL INLET BOXOUT, E -3-C EACH $1,700.00 3.0 3 0.0 $0.00 75 REM/REPL INLET BOXOUT, MODIFIED E -2-C EACH $1, 500.00 1.0 0 (1.0) ($1,500.00) 76 TAP AND COLLAR STRUCTURE OR PIPE EACH $1,315.00 9.0 8.5 (0.5) ($657.50) 77 INSULATE EXISTING COPPER WATER SERVICE EACH $765.00 2.0 0 (2.0) ($1,530.00) 78 FURNISH AND INSTALL MANHOLE RING AND COVER EACH $875.00 4.0 0 (4.0) ($3,500.00) 79 STORM WATER PROTECTION FOR STRUCTURES EACH $460.00 53.0 39 (14.0) ($6,440.00) TOTAL BASE BID - DIVISION I SECTION II ($42,353.14) BID ITEM DESCRIPTION UNIT ASPRO PLAN FINAL INCR/DECR INCR/DECR DIVISION I BASE BID - SECTION III UNIT $ QTY QTY QTY AMOUNT 80 RECONSTRUCT SANITARY SEWER, 12" LF $69.00 2287.0 2290 3.0 $207.00 81 RECONSTRUCT SANITARY SEWER, 8" LF $55.00 650.3 635 (15.3) ($841.50) 82 REMOVE AND REPLACE SANITARY SEWER, 8" LF $225.00 98.0 84 (14.0) ($3,150.00) 83 SANITARY SEWER SERVICE, 6" LF $45.85 1634.0 1828 194.0 $8,894.90 84 STANDARD SANITARY MANHOLE, 48" EACH $4,350.00 7.0 7 0.0 $0.00 85 MAJOR MANHOLE ADJUSTMENT EACH $0.00 0.0 0 0.0 $0.00 86 REMOVE EXISTING STRUCTURE, SANITARY MANHOLE EACH $650.00 6.0 6 0.0 $0.00 87 REMOVE SANITARY SEWER, 12" LF $35.00 235.0 235 0.0 $0.00 88 FURNISH AND INSTALL MANHOLE RING AND COVER EACH $875.00 4.0 1 (3.0) ($2,625.00) 89 TRACE SANITARY SEWER SERVICE EACH $410.00 1.0 0 (1.0) ($410.00) 90 DYE TEST INVESTIGATION EACH $180.00 6.0 2 (4.0) ($720.00) 91 UNDERGROUND INVESTIGATION -SANITARY EACH $425.00 5.0 3 (2.0) ($850.00) TOTAL BASE BID - DIVISION I SECTION III $505.40 BID ITEM DESCRIPTION UNIT ASPRO PLAN FINAL INCR/DECR INCR/DECR DIVISION I BASE BID - SECTION IV UNIT $ QTY QTY QTY AMOUNT 92 HYDROSEED SY $1.80 9878.7 10525.8 647.1 $1,164.78 TOTAL BASE BID $129,670.86 BID ITEM DESCRIPTION UNIT ASPRO PLAN FINAL INCR/DECR INCR/DECR ALTERNATE A UNIT $ QTY QTY QTY AMOUNT 1A 2", HMA 1M S 1/2", 60% CR SY $10.80 21295.2 21919.2 624.0 $6,739.20 2A 2 1/2", HMA 1M 13/4", 60% CR SY $11.95 21295.2 21919.2 624.0 $7,456.80 3A 3", HMA 1M B 3/4", 60% CR SY $14.10 21295.2 21919.2 624.0 $8,798.40 4A 2", HMA 3M S 1/2", 75% CR SY $10.85 5328.4 5328.4 0.0 $0.00 5A 4", HMA 3M 11/2", 75% CR SY $19.65 5328.4 5328.4 0.0 $0.00 6A 3", HMA 3M B 1/2", 75% CR SY $14.15 5328.4 5328.4 0.0 $0.00 7A CURB AND GUTTER, PCC, C-4, 24" WIDE, 7 1/2" THICK LF $13.75 13841.1 14038.9 197.8 $2,719.75 8A CURB AND GUTTER, PCC, C-4, 24" WIDE, 9" THICK LF $15.95 4170.1 4173 2.9 $46.25 9A COLD WEATHER CONCRETE PROTECTION SY $3.90 3029.8 0 (3,029.8) ($11,816.22) 10A LINSEED OIL TREATMENT SY $4.30 1772.6 680.9 (1,091.7) ($4,694.31) 11A PAVEMENT SAMPLES AND TESTING LS $5,000.00 1.00 1 0.0 $0.00 12A EXCAVATION CY $10.50 6845.0 9429.3 2,584.3 $27,135.15 TOTAL ALTERNATE A $36,385.03 Page -2 12/5/2016 3:29 PM F.Y. 2015 STREET RECONSTRUCTION PROGRAM - CONTRACT NO. 873 QUANTITY INCREASE DECREASE SUMMARY DIVISION 11 - WATER MAIN ASPRO PLAN FINAL INCR/DECR INCR/DECR ITEM DESCRIPTION UNIT UNIT $ QTY QTY QTY AMOUNT 1 Ductile iron water main, 6 -inch dia., Class 52 LF $55.64 680.0 655 (25.0) ($1,391.00) 2 Ductile iron water main, 8 -inch dia., Class 52 With Nitrile Gaskets LF $61.20 1,236.0 1253 17.0 $1,040.40 3 Ductile iron water main removal LF $11.35 977.0 996 19.0 $215.65 4 Tapping sleeve, valve and box, 6 on 6 inch dia. EACH $3, 695.00 1.0 1 0.0 $0.00 5 Gate valve and box, 8 -inch dia. EACH $1, 850.00 2.0 2 0.0 $0.00 6 Gate valve and box, 6 -inch dia. EACH $1, 600.00 1.0 2 1.0 $1,600.00 7 Tee, 8 -inch x 8 -inch dia. EACH $600.00 1.0 1 0.0 $0.00 8 Reducer, 8 inch x 6 inch dia. EACH $415.00 2.0 2 0.0 $0.00 9 Cap or Plug, 6 inch dia. EACH $360.00 3.0 1 (2.0) ($720.00) 10 Cap or Plug, 8 inch dia. EACH $360.00 1.0 1 0.0 $0.00 11 Megalugs, 6 -inch dia. EACH $135.00 1.0 6 5.0 $675.00 12 Megalugs, 8 -inch dia. EACH $160.00 4.0 5 1.0 $160.00 13 Concrete blocking EACH $395.00 4.0 5 1.0 $395.00 14 Hydrant assembly EACH $4,995.00 3.0 3 0.0 $0.00 15 Hydrant removal EACH $725.00 2.0 2 0.0 $0.00 16 Bend, 6 inch, any degree EACH $250.00 1.0 2 1.0 $250.00 17 Bend, 8 inch, any degree EACH $330.00 1.0 0 (1.0) ($330.00) 18 Sleeve, 6 inch dia. EACH $275.00 2.0 1 (1.0) ($275.00) 19 Sleeve, 8 inch dia. EACH $350.00 1.0 0 (1.0) ($350.00) 20 Temporary PVC water main LF $21.25 717.0 658 (59.0) ($1,253.75) 21 Removal of temporary PVC surface water main connections to ductile iron water main EACH $1,540.00 2.0 1 (1.0) ($1,540.00) 22 3/4" short side water services EACH $1,185.00 8.0 9 1.0 $1,185.00 23 3/4" long side water services EACH $1,800.00 20.0 20 0.0 $0.00 24 1" short side water services EACH $1,410.00 1.0 0 (1.0) ($1,410.00) 25 1" long side water services EACH $2, 025.00 1.0 1 0.0 $0.00 26 Kill and plug service line at water main EACH $450.00 4.0 4 0.0 $0.00 27 Remove inactive pave box and abandon water service line stub in place EACH $325.00 2.0 0 (2.0) ($650.00) EXTRA 01 Offsets, 6 -inch x 8 -inch, install only EACH $150.00 0.0 2 2.0 $300.00 Total estimated amount -Division II ($2,098.70) TOTAL INCREASE $163,957.18 4.48% ORIGINAL CONTRACT AMOUNT $3,494,504.20 CHANGE ORDER NO. 1 $3,162.50 CHANGE ORDER NO. 2 $527.50 CHANGE ORDER NO. 3 (QUANTITY ADJUSTMENT SUMMARY) $163,957.18 FINAL CONTRACT AMOUNT $3,662,151.38 PAYMENTS TO CONTRACTOR ESTIMATES 1-25 $3,479,933.25 RETAINAGE $182,218.13 TOTAL $3,662,151.38 Page - 3 12/5/2016 3:29 PM ° Item Coversheet Page 1 of 1 CITY OF WATERLOO Council Communication Motion approving Change Order No. 3 for a net increase of $163,957.18 for the F.Y. 2015 Street Reconstruction Program, Contract No. 873; and authorize the Mayor and City Clerk to execute said document. City Council Meeting: 12!5/2016 Prepared: 11/30/2016 SUBJECT: Submitted by: Summary Statement: Source of Funds: Motion approving Change Order No. 3 for a net increase of $163,957.18 for the F.Y. 2015 Street Reconstruction Program, Contract No. 873: and authorize the Mayor and City Clerk to execute said document. Submitted By: Dennis Gentz, PE, Assistant City Engineer This is the accumulated amount of adjustments from original to final quantities that were determined necessary during the construction of the project, which results in an increase to the total project cost. The majority of this increase is attributed to: 1) additional excavation and rock base needed due to poor soil conditions encountered during construction and 2) addition of approximately 250 feet of Mourning Dove reconstruction near the Hummingbird intersection due to it's poor conditions. Local Option Sales Tax http://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=6973 11/30/2016