Loading...
HomeMy WebLinkAboutAecom Technical Services-12/19/2016AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com FY 2016 SATELLITE RAW WASTEWATER WET WELL REHABILITATION WATER POLLUTION CONTROL FACILITY CITY OF WATERLOO, IOWA CONTRACT NO. 907 SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated February 1, 2016, for design and bidding services for the FY 2016 Satellite Raw Wastewater Wet Well Rehabilitation Project. WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for additional engineering services as described below in the Project Description and Scope of Services. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. PROJECT DESCRIPTION The project includes design and bidding services for the rehabilitation of the existing satellite raw wastewater wet well at the Water Pollution Control Facility (W PCF). The City would like to add rehabilitation of other piping and equipment in this building to this contract. In particular, this includes coating and rehabilitating the following items: 1. The 30 -inch and 48 -inch degritter influent piping, effluent piping and associated valves. 2. The 4 -inch grit pumps influent piping, effluent piping and associated valves. This includes both Grit Pump 1 and Grit Pump 2. The City would also like to include rehabilitation of the sludge transfer wet well to this project. The wet well is located between Sludge Digester Number 1 and Sludge Digester Number 2. This would include coating the inside of the wet well and all associated internal piping. II. SCOPE OF SERVICES The Scope of Services will encompass and include detailed work, materials, equipment, personnel and supplies necessary to provide design services for this project. The Scope of Services is further defined as follows: Design Services Task 1 - Development of Construction Plans and Proiect Manual. Add contract documents, drawings and project manual to the original plan set (Contract No 907) indicating the following: 1. Rehabilitation of piping and equipment in the Raw Wastewater Pumping Building. This would include Items 1 and 2 under Project Description above. 2. Rehabilitation of the concrete and associated piping in the sludge transfer wet well. The wet well cannot be out of service for an extended period of time. Therefore, any rehabilitation will need to be carried out in stages and/or with materials that are fast curing and able to achieve desired results in a short period of time. -1- a= -coni Plans will include sheets detailing the pipes and materials that need coating. Specifications will include specifications for removal methods, surface preparation and coating specifications for these items. Specifications will also detail time restraints that will need to be abided by the contractor for the rehabilitation of the sludge transfer wet well. Task 2 - Estimate of Probable Costs. Prepare an estimate of probable costs based on the contract documents. The items added as part of this supplemental agreement will be added to the project estimate being prepared for the originally contracted project. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement. Total compensation is an estimated fee which shall not exceed Eleven Thousand Five Hundred Dollars ($11,500.00) and is to be integrated with the fees in the original agreement. IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated February 1, 2016. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: AECOM TECHNICAL SERVICES, INC/ Douglas . hindel, P.E. Associate Vice President APPROVED FOR CLIENT: By: CALkSb Date December 7, 2016 Date Quentin Hart Mayor O:\Administration\AGREE\SUPPLE\SA1 Wat WPCF Wet Well Rehab.doc -2- �� / Letter of Transmittal TO: Waterloo Pollution Control Operations 3505 Easton Avenue Waterloo, Iowa 50702 AECOM DATE: December 7, 2016 JOB ID NO.: AI I E,NTION: Mr. Steve Hoambrecker RE: FY 2016 Satellite Raw Wastewater Wet Well Rehabilitation Water Pollution Control Facility WE ARE SENDING YOU: O Attached ❑ Prints ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Change Order ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ COPIES DATE NO. DESCRIPTION 2 Supplemental Agreement No. lfor Above -Referenced Project THESE ARE TRANSMI I"I'ED AS CHECKED BELOW: O For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Resubmit copies for approval ❑ Approved as noted ❑ Submit copies for distribution ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ For Bids due 20 ❑ Prints returned after loan to us REMARKS: Upon your review and approval, please return one (1) executed supplemental agreement for our files. We look forward to continuing to work with the City of Waterloo on this project. COPY TO: SIGNED: If enclosures are not as noted, kindly notify us at once. Ross A. Hillsman, P.E. 501 Sycamore Street, Suite 222 • P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232.6531 • Fax: (319) 232-0271