Loading...
HomeMy WebLinkAboutMike Dolan Concrete and Masonry-3/13/2017CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2015 Cunningham School Safe Routes to School Program PCC Sidewalks CONTRACT NO. 851 Date Prepared::( -6-13. 27, 2617; AMOUNT: $3,769.95 DECREASE TO: MIKE DOLAN CONCRETE AND MASONRY , Contractor You are hereby ordered to perform the following extra work on your contract dated June 15, 2015. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: Mayor ATTEST: TOTAL DECREASE $3,769.95 MIKE DOLAN CONCRETE AND MASONRY Date CONTRACTOR �r BY: 0400 v a - a 'G1c�d " Date City Cler Date Final Qty. Adj. TITLE: 1 f e 51d Q/lf APPROVED: City Engineer Date Contract No. 851 Sheet 1 of 1 F.Y. 2015 Cunningham School Safe Routes To School Program PCC Sidewalks CONTRACT NO. 851 FINAL PERIOD: Due 30 Days from date of acceptance of work Bid Item Bid Item Description Units Original Bid Quantity Final Quantity Quantity Difference Dolan Unit Price Dolan Unit Price Extended Increase / Decrease 1 Clearing and Grubbing UNIT 120.0 0.0 -120.0 $ 70.00 $ - $ (8,400.00) 2 Excavation, Class 10, Waste CY 108.9 108.9 0.0 $ 30.00 $ 3,267.00 $ - 3 Topsoil, Furnish and Spread CY 328.8 328.8 0.0 $ 25.00 $ 8,220.00 $ - 4 Removal of Curb STA 1.350 1.705 0.355 $ 1,200.00 $ 2,046.00 $ 426.00 5 Surfacing, Driveway, Class A Crushed Stone TON 2.0 11.38 9.38 $ 40.00 $ 455.20 $ 375.20 6 Removal of Sidewalk SY 142.9 145.5 2.6 $ 18.00 $ 2,619.00 $ 46.80 7 Sidewalk, PC Concrete, 4 in. SY 379.8 353.6 -26.2 $ 45.00 $ 15,912.00 $ (1,179.00) 8 Sidewalk, PC Concrete, 5 in. SY 26.6 31.4 4.8 $ 54.00 $ 1,695.60 $ 259.20 9 Sidewalk, PC Concrete, 6 in. SY 73.7 72.9 -0.8 $ 58.50 $ 4,264.65 $ (46.80) 10 Detectable Warnings SF 116.0 116.0 0.0 $ 25.00 $ 2,900.00 $ - 11 Curb and Gutter, PC Concrete, 2.0 ft. LF 135.3 170.5 35.2 $ 20.00 $ 3,410.00 $ 704.00 12 Driveway, PC Concrete, 5 in. SY 20.7 21.8 1.1 $ 54.00 $ 1,177.20 $ 59.40 13 Driveway, PC Concrete, 6 in. SY 67.4 76.5 9.1 $ 58.50 $ 4,475.25 $ 532.35 14 Removal of Paved Driveway SY 88.1 96.4 8.3 $ 18.00 $ 1,735.20 $ 149.40 15 Safety Closure EACH 15.0 15.0 0.0 $ 55.00 $ 825.00 $ - 16 Perforated Square Steel Tube Posts LF 11.0 11.0 0.0 $ 11.00 $ 121.00 $ - 17 Type A Signs, Sheet Aluminum SF 15.0 15.0 0.0 $ 20.00 $ 300.00 $ - 18 Construction Survey LS 1.0 1.0 0.0 $ 2,000.00 $ 2,000.00 $ - 19 Traffic Control LS 1.0 1.0 0.0 $ 2,000.00 $ 2,000.00 $ - 20 Mobilization LS 1.0 1.0 0.0 $ 500.00 $ 500.00 $ - 21 Mulching, Wood Cellulose Fiber ACRE 0.1 0.0 -0.1 $ 10,890.00 $ - $ (1,089.00) 22 Seeding and Fertilizing (Urban) ACRE 0.1 0.1 0.0 $ 10,890.00 $ 1,089.00 $ - 23 Perimeter and Slope Sediment Control Device, 6 in. dia. LF 40.0 50.0 10.0 $ 7.00 $ 350.00 $ 70.00 24 Removal of Perimeter and Slope Sediment Control Device LF 40.0 50.0 10.0 $ 1.00 $ 50.00 $ 10.00 8001 Combined Concrete Sidewalk and Retaining Wall CY- 5.75 5.75 $ 750.00 $ 4,312.50 $ 4,312.50 $ 63,724.60 $ (3,769.95) TOTAL PAY ESTIMATE #1 $ 56,070.35 PAY ESTIMATE #2 $ 447.45 PAY ESTIMATE #3 $ 3,65.53 RETAINAGE $ 3,1161.23 TOTAL PAYMENTS $ 63,724.60 TOTAL ORIGINAL CONTRACT AMOUNT REQUIRED DEDUCTIONS PER IOWA DOT CONTRACT SPECIFICATIONS $ 67,494.55 NEW CONTRACT AMOUNT (500.00) $ 66,994.55 FINAL NEW CONTRACT AMOUNT $ 66,994.55 FINAL QUANTITY SUMMARY $ (3,769.95) FINAL CONTRACT AMOUNT $ 63,224.60 FINAL QTY. ADJ. Cont. 9851 SRTS-U-8155(728)-8U-07 Sheet 2 of 2 Item Coversheet Page 1 of 1 CITY OF WATERLOO Council Communication Motion approving Final Quantity Adjustment for a net decrease of $3,769.95 for the F.Y. 2015 Cunningham School Safe Routes to School, Contract No. 851 and authorize the Mayor and City Clerk to execute said document. City Council Meeting: 3/13/2017 Prepared: 3/8/2017 ATTACHMENTS: Description Type Cont 851 Final Qty Summary Cover Memo Motion approving Final Quantity Adjustment for a net decrease of $3,769.95 for the F.Y. SUBJECT: 2015 Cunningham School Safe Routes to School, Contract No. 851 and authorize the Mayor and City Clerk to execute said document. Submitted by: Submitted By: Wayne Castle, PLS, PE, Associate Engineer Summary Statement: This is the accumulated amount of adjustments from original to final quantities that were determined necessary during the construction of the project, which results in a decrease to the total project cost. Source of Funds: Safe Routes to School Grant GO Bonds for Sidewalk Repair http://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=7752 3/8/2017