HomeMy WebLinkAboutPeterson Contractors Inc-4/17/2017Item Coversheet Page 1 of 1 CITY OF WATERLOO Council Communication Motion approving Final Quantity Summary for a net increase of $13,407.00 for the F.Y. 2016 1 lth Street Bridge Deck Joint Repairs, Contract No. 890 and authorize the Mayor and City Clerk to execute said document. City Council Meeting: 4/17/2017 Prepared: 4/12/2017 ATTACHMENTS: Description Type CI Cont 890 Final Otv Summary Cover Memo SUBJECT: Submitted by: Summary Statement: Source of Funds: Motion approving Final Ouantitv Summary for a net increase of $13,407.00 for the F.Y. 2016 1 lth Street Bridge Deck Joint Repairs, Contract No. 890 and authorize the Mayor and City Clerk to execute said document. Submitted By: Wayne Castle, PLS, PE, Associate Engineer This is the accumulated amount of adjustments from original to final quantities that were determined necessary during the construction of the project, which results in an increase to the total project cost. GO Bonds https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8116 4/12/2017 CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2016 11th STREET BRIDGE DECK JOINT REPAIRS CONTRACT NO. 890 Date Prepared: March23,2017 AMOUNT: $13,407.00 INCREASE TO: PETERSON CONTRACTORS, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated JULY 13, 2015. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: TOTAL INCREASE $13,407.00 ‘1/11 PETERSON CONTRACTORS, INC. Mayor ATTEST: 1/l Ci y Clerk Date CONTRACTOR Date BY. a 7/2L(7/) Date TITLE: Tf o APPROVED:® „Xv.t44„.‘..) City Engineer Final Quantity Adjustment Cont. #890 Y/13 f l? Date Sheet 1 of 2 F.Y. 2016 11th STREET BRIDGE DECK JOINT REPAIRS CONTRACT NO. 890 FINAL PERIOD: Due 30 Days from date of acceptance of work Bid Item Bid Item Description Units Original Bid Quantity Final Quantity Quantity Difference PCI Unit Price PCI Unit Price Extended Increase / Decrease 1 Removals, As Per Plan LS 1.0 1.0 0.0 ,, $ 18,000.00 $ 18,000.00 $ - 2 Structural Concrete (Miscellaneous) CY 10.3 10.3 0.0 $ 1,020.00 $ 10,506.00 $ - 3 Reinforcing Steel, Epoxy Coated LB 1,991.0 1,991.0 0.0 $ 2.75 $ 5,475.25 $ - 4 Structural Steel LB 1,050.0 1,050.0 0.0 $ 16.50 $ 17,325.00 $ - 5 Steel Extrusion Joint with Neoprene LF 126.0 126.0 0.0 r $ 475.00 $ 59,850.00 $ - 6 Neoprene Gland Installation and Testing LF 126.0 126.0 0.0 $ 49.75 $ 6,268.50 $ - 7 Safety Closure EACH 4.0 4.0 0.0 $ 250.00 $ 1,000.00 $ - 8 Traffic Control LS 1.0 1.0 0.0 $ 3,000.00 $ 3,000.00 $ - 9 Mobilization LS 1.0 1.0 0.0 $ 7,000.00 $ 7,000.00 $ - 10 Repair Lateral Bracing (Quantity Adjustment) EACH 14.0 14.0 0.0 $ 1,905.00 $ 26,670.00 $ - 1-1 Trail Closure Under Bridge LS 1.0 1.0 0.0 $ 300.00 $ 300.00 $ - 2-1 Bridge Approach Sidewalk Remove and Replace LS 1.0 1.0 0.0 $ 150.00 $ 150.00 $ - 3-1 Bridge Approach Pavement Remove and Replace LS 1.0 1.0 0.0 $ 7,242.00 $ 7,242.00 $ - 4-1 Repair Lateral Bracing (Quantity Adjustment) EACH 3.0 3.0 0.0 $ 1,905.00 $ 5,715.00 $ - $ 168,501.75 $ - TOTAL ORIGINAL CONTRACT AMOUNT TOTAL PAY ESTIMATE #1 $ 119,695.77 PAY ESTIMATE #2 $ 31,955.81 RETAINAGE $ 16,850.17 TOTAL PAYMENTS $ 168,501.75 TOTAL ORIGINAL CONTRACT AMOUNT $ 155,094.75 CHANGE ORDER #1 (ITEM 1-1) $ 300.00 CHANGE ORDER #2 (ITEM 2-1) $ 150.00 CHANGE ORDER #3 (ITEM 3-1) $ 7,242.00 CHANGE ORDER #4 (ITEM 4-1) $ 5,715.00 NEW CONTRACT AMOUNT $ 168,501.75 FINAL NEW CONTRACT AMOUNT $ 168,501.75 FINAL QUANTITY SUMMARY $ - FINAL CONTRACT AMOUNT $ 168,501.75 FINAL QTY. ADJ. Cont. #890 Sheet 2 Of 2