Loading...
HomeMy WebLinkAboutPeters Construction-5/8/2017Item Coversheet Page 1 of 1 CITY OF WATERLOO Council Communication Resolution approving Change Order No. 6 (Extra Work) for $48,903.18 for the FY 2016 W 2nd, Cedar W. 3rd Streets Street Improvements, Contract No. 912, and authorize the Mayor and City Clerk to execute said document. City Council Meeting: 5/8/2017 Prepared: 5/3/2017 SUBJECT: Submitted by: Summary Statement: Expenditure Required: Resolution approving Change Order No. 6 (Extra Work) for $48,903.18 for the FY 2016 W 2nd, Cedar W. 3rd Streets Street Improvements, Contract No. 912, and authorize the Mayor and City Clerk to execute said document. Submitted By: Eric Thorson, PE, City Engineer This extra work will relocate and reconstruct one of the driveways to the Center for the Arts parking lot to help with the maneuvering of large semis into the loading dock for the Single Speed Brewery. The driveway to the parking lot was planned to be reconstructed in the future, so this is just doing it earlier to accommodate truck movements for Single Speed Brewery. $48,903.18 Source of Funds: G.O. Bonds https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8369 5/3/2017 CHANGE ORDER NO. 6 Owner City of Waterloo Date; 04/26/2017 Project FY 2016 W 2nd, Cedar and W 3rd Streets Improvemeents Owner's Contract No. 912 Contractor. Peters Construction Date of Contact Start 20 -Jun -16 Contract Amount $ 810,810.09 You are directed to make the following changes in the Contract Documents. Desaiption: Unit Estimated Unit Price Quantity Cost 6-1 (5) MODIFIED SUBBASE CY 37.44 88 3 3,305.95 6-2 (6) STND OR SLIP FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 6 IN. SY 36.95 43 7 1,614.72 6-3 (7) STND OR SUP FORM PCC PAVEMENT, CLASS C, CLASS 3 DURABILITY, 9 IN. SY 62.79 301.3 18,918.63 6-4 (10) REMOVAL OF UGHT POLES & FOOTINGS (Modified to Remove/Reinstall) EA 3056.7 10 3,056.70 6-5 (20) INTAKE, SW -603, TOP ONLY EA 2354.63 1.0 2,354.63 6-6 (27) REMOVAL OF PAVEMENT SY 8.6 481,6 4,141.76 6-7 (30) SIDEWALK, P.C. CONCRETE, CLASS C, CLASS 3 DURABIUTY, 5 IN. SY 33.7 29.7 1,000.89 6-8 (41) ELECTRICAL CIRCUITS (Modified to Each Price] EA 2300 1.0 2,300.00 6-9 (42) HANDHOLES AND JUNCTION BOXES EA 862.5 1.0 86150 6-10 (45) PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT BASED STA 50.72 6,0 304.32 6-11 (46) PAINTED SYMBOLS AND LEGENDS, WATERBORNE OR SOLVENT -BASED EA 48.3 L0 96.60 6-12 (47) TRAFFIC CONTROL L5 1150 1.0 1,150.00 6-13 (48) MOBIU2ATION LS 5232.5 1.0 5,232 50 6-14 (49) DETECTABLE WARNINGS SF 33.81 14 0 473.34 6-15 (52) PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 4.05 250 0 1,012.50 6-16 (53) REMOVE PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 0.76 250.0 190.00 6-17 (54) INTAKE PROTECTION EA 91.05 4.0 364.20 6-18 (55) REMOVAL OF INTAKE PROTECTION EA 24.15 4,0 96.60 6-19 (65) 500 SY 11.2.9 215.0 2,427.35 TOTAL ADDITIONS $ 48,903.18 Reason for Change Order 6-1 to Construct new driveway opposite Single Speed Brewery Dock to accommodate truck movements. 6-19 CONTRACT PRICE Original: Previous C.O.s (ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: 5 810.810.00 Original Completion Date: $ 58,424.46 $ 48,903.18 Revised Completion Date: 6/15/20171 6/15/20171 CONTRACT TIME To Substantial Completion 10/30/20161 To Fina' Completion 10/30/2016 $ 918,137.64 It is agreed by the Contractor that this Change Order Includes any and all costs associated wth or resulting from the changes) ordered herein, Including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND CONVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPRO BY: Owner (Authorized Signature) ACCEPTED: BY: IA -a Lir �� CatCractor (Authorized Signature) ACCEPTED: BY: ECO fie/ t1 Date Date -5 /r 7 Date AECOM 60509363 1 6 Project No C.O. No