Loading...
HomeMy WebLinkAboutAecom Technical Services-6/5/2017AXOM CITY OF WATERLOO AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com 6TH STREET, 18TH STREET AND ANSBOROUGH BRIDGE REPAIRS CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated June 20, 2016, for the final design of repairs to 6th Street, 18th Street and Ansborough Avenue bridges in Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 on September 26, 2016, for construction -related services for the repairs to 6th Street, 18th Street and Ansborough Avenue bridges; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 for additional construction -related services for the repairs to the Park Avenue Bridge. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of expansion joint and sidewalk repairs to Park Avenue Bridge. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide field review, materials testing and contract administration during the construction phase for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Coordinate submittals to the Iowa DOT for traffic control on state routes. Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare monthly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. A:COM Page 2 Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 10. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 11. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 12. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 13. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, and additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 14. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field reviewstaff and the Contractor showing those changes made during construction considered significant. Task 15. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement. Total compensation is an estimated fee, which shall not exceed Four Thousand Dollars ($4,000.00) and is to be integrated with the fees in Supplemental Agreement No. 1. IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated June 20, 2016. Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: CITY OF WATERLOO, IOWA By: If+zL. Quentin Hart Mayor AECOM TECHNICAL SERVICES, INC. By - * uglas W. Schindel, P.E. Associate Vice President Date Date May 31, 2017 0:\Administration\AGREE\SUPPLE\SA2 Wat 6th, 18th and Ansb Bridge Repairs.doc Item Coversheet CITY OF WATERLOO Council Communication ‘')(61(fij Page 1 of 1 Resolution approving Supplemental Agreement No. 2 with AECOM Technical Services, Inc. for additional construction -related services in an amount not to exceed $4,000.00 in conjunction with the F.Y. 2017 Bridge Repairs - 6th Street, 18th Street, and Ansborough Avenue; Contract No. 916 and authorize Mayor ttp.ex�iic to said document. City Council Meeti Prepared: 5/31/201 ATTACHMENTS: Description Type Cont 916 SA 2 Cover Memo SUBJECT: Submitted by: Summary Statement: Expenditure Required: Resolution approving Supplemental Agreement No. 2 with AECOM Technical Services, Inc. for additional construction -related services in an amount not to exceed $4,000.00 in conjunction with the F.Y. 2017 Bridge Repairs - 6th Street, 18th Street, and Ansborough Avenue; Contract No. 916 and authorize Mayor to execute said document. Submitted By: Wayne Castle, PLS. PE, Associate Engineer This agreement is for additional construction related services for the repairs to the Park Avenue Bridge as part of the above referenced project. The scope of services will encompass and include services, materials, equipment, personnel and supplies necessary to provide field review, materials testing and contract administration during the construction phase of the project. $4,000.00 Source of Funds: GO Bonds https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8584 5/31/2017