Loading...
HomeMy WebLinkAboutAecom Technical Services-6/5/2017 (2)ACOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO 2017 BIENNIAL BRIDGE REVIEW PROGRAM ADDITIONAL STRUCTURE REVIEW SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated September 20, 2016, for the 2017 Biennial Bridge Review Program in Waterloo, Iowa; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for the review of two additional bridges. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of the review of two additional bridge structures. • Bridge 1: Prairie Crossing Trail Over Black Hawk Creek • Bridge 2: Prairie Crossing Trail Over Black Hawk Creek The bridges are located approximately 1/4 mile south of Ranchero Road in Section 12, T - 88N, R14W. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide field review and summary report for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct field review for said bridges. Task 2. Prepare condition rating and appraisal for said bridges. Task 3. Prepare summary of said bridges for inclusion in the summary report. Task 4. Prepare copies of rating forms and photographs of said bridges for inclusion in the appendix of the summary report. III. Compensation Compensation for the above services shall be a lump sum fee of Three Thousand Five Hundred Dollars ($3,500.00), which shall be integrated with the fee in the original agreement. IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated September 20, 2016. AECOM Page 2 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: CITY OF WATERLOO, IOWA By: �� `� Date (r5_/ Quentin Hart Mayor AECOM TECHNICAL SERVICES, INC. t By (id( M 4t ouglas W. Schindel, P.E. Associate Vice President O:\Administration\AGREE\SUPPLE\SA1 2017 Biennial Bridge Review.doc Date Mav 31, 2017 Item Coversheet CITY OF WATERLOO Council Communication /„:tpu'lL/ Page 1 of 1 Resolution approving Supplemental Agreement No. 1 with AECOM Technical Services, Inc. for an amount not to exceed $3,500.00 in conjunction with the F.Y. 2017 Bienn' •.: - _e Review Program; and authorize Mayor to execute said document. City Council Meeti Prepared: 5/31/2017 6/5/2017 ATTACHMENTS: Description Type 2017 Biennal Bidge Review SA 1 Cover Memo SUBJECT: Submitted by: Recommended Action: Summary Statement: Expenditure Required: Source of Funds: Background Information: Resolution approving Supplemental Agreement No. 1 with AECOM Technical Services, Inc. for an amount not to exceed $3 500.00 in conjunction with the F.Y. 2017 Biennial Bridge Review Program; and authorize Mayor to execute said document. Submitted By: Wayne Castle, PLS, PE, Associate Engineer Review of two additional bridge structures: 1. Prairie Crossing Trail Over Black Hawk Creek 2. Prairie Crossing Trail Over Black Hawk Creek $3,500.00 G.O. Bonds - Bridge Inspections Under the FY2017 Biennial Bridge Inspection contract, the consultant will: 1) Inspect the 63 bridges and culverts within the City limits for which Structure Inventory and Appraisal (SI&A) sheets are required. This number includes the two bridges, University Avenue over Black Hawk Creek and University Avenue over abandoned CNW Railroad (Sergeant Road Trail) that the City will acquire from the IDOT with the University Avenue transfer of jurisdiction. 2) Complete an FHWA Level 1 Underwater Bridge Inspection for the Park Avenue over Cedar River bridge using Westbrook Associated Engineers, Inc. as a subcontractor. This inspection is required by the FHWA every four years due to the condition of the bridge piers. 3) Update and prepare bridge load ratings, as necessary, for the IDOT's SI&A database. 4) Compile and submit a report of the bridge and culvert conditions, highlighting maintenance concerns and updated load ratings. This report shall be delivered by October 30, 2017. AECOM has been conducting the biennial bridge and culvert inspections for a number of years. AECOM staff is familiar with our structures, have the records for each structure, and have the manpower and expertise to complete the inspections and submit the required reports. https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8585 5/31/2017