Loading...
HomeMy WebLinkAboutIowa Department of Transportation-6/12/2017Fare 910012wd 06-14 C Q�JA DO1f AGREEMENT FOR DOT -INITIATED DETOUR OF PRIMARY HIGHWAYS ONTO LOCAL ROADS This Agreement is entered into by and between the Iowa Department of Transportation, hereinafter known as the Department; and the City of Waterloo . hereinafter known as the Local Public Aaencv (LPAI. WHEREAS, the Department has determined the necessity to temporarily close primary highway the entrance ramp connecting from U.S. 63 to northbound U.S. 218 for the purpose of construction, reconstruction, maintenance, natural disasters, or other emergencies; and WHEREAS, it is necessary to provide a detour for the primary highway closure period; and WHEREAS, the LPA agrees to permit the use of its roads as a detour, more particularly described as follows: from the junction of U.S. 63 with West Commercial Street, thence northerly on West Commercial Street to Westfield Avenue, thence northwesterly on Westfield Avenue to Fletcher Avenue, thence southerly on Fletcher Avenue to the northbound U.S. 218 service road (West Washington Street) ; and WHEREAS, Authorized representatives of both the Department and the LPA shall jointly execute and sign a written report concerning the condition of the proposed detour, after jointly inspecting said road, the subject of the proposed detour, said report to be in sufficient detail as to reasonably reflect the condition of the roadway base, surface, shoulders and bridges; and WHEREAS, the Department will review, and inspect when necessary, the bridges on the detour route and determine the maximum vehicle weight (up to 156,000 pounds) that can be safely carried on these bridges and submit this Information to the LPA for its review. The LPA may choose to restrict detour traffic to only vehicles of legal weight or size. If the LPA allows oversize or overweight loads, it shall notify the Department in writing. The Department shall approve the routing of overweight vehicles on the detour route, up to the limits specified by the LPA; and WHEREAS, the Department agrees to perform the following pre -detour maintenance, if any. place pavement markings and detour signs as needed ; and WHEREAS, the Department agrees to maintain the detour and provide all traffic control devices required by the Manual of Uniform Traffic Control Devices (MUTCD), as adopted by the Department pursuant to 761 IAC 130, including the marking of no -passing zones during the period the local agency road(s) and structure(s) are being utilized as a primary road detour, and WHEREAS, Prior to revocation of the detour, the Department shall restore the local agency road to as nearly as possible as good condition as It was prior to its designation as a temporary primary road, or adequately compensate the local agency for excessive traffic upon the local agency road during the period it was used as a temporary primary road, in accordance with Section 313.28 or Section 313.29 of the Iowa Code and Iowa DOT Policy 600.05; and WHEREAS, The detour period Is estimated to begin approximately Sept 18, 2017 WHEREAS, the parties agree to the following additional provisions, if any: and end approximately Sept 21, 2017 (date) (date) The detour is proposed to last 4 days. ; and NOW, THEREFORE, BE IT AGREED that the described road be used as a detour under stipulations outlned above. IN WITNESS WHEREOF, The parties hereto have caused this agreement to be executed by proper officers thereunto duly authorized as of the dates below indicated. District Engineer (or designee) Date Iowa Department of Transportation City representative Date Printed name and title of city representative County representative Date Printed name and title of county representative RATOSO HACKETF 0/10535 $1 ST ANDR[44 AVE MILANO AYE SCOIT AVE MERU 4VE • 1, Man RD FIACRETI RD mum • VINCENT RIADNOUR D UR MR it .f> Item Coversheet Page 1 of 1 CITY OF WATERLOO Council Communication Resolution approving Agreement with Iowa Department of Transportation for use of city streets to detour traffic from the ramp to US 218 NB at Highway 63/Commercial Street in conjunction with the US 218 PCC Patching Project from US 63 to Greenhill Rd. NB (NHSN-218-7(236)-2R- 07)' City Council Meeting: 6/12/2017 Prepared: 6/7/2017 ATTACHIVIENTS: Description Type Q US 218 NB ramp detour agreement Cover Memo SUBJECT: Submitted by: Summary Statement: Resolution approving Agreement with Iowa Department of Transportation for use of city streets to detour traffic from the ramp to US 218 NB at Highway 63/Commercial Street in conjunction with the US 218 PCC Patching Poiect from US 63 to Greenhill Rd. NB (NHSN-218-7(236)-2R-07). Submitted By: Dennis Gentz, PE, Assistant City Engineer This agreement is for the use city streets to implement a detour needed for the contractors work to replace a storm sewer pipe under the ramp to NB 218 at Hwy 63/Commercial St. The portion of the detour using city streets will commence at the junction of US 63/Commercial Street and Westfield Avenue, thence westerly on Westfield Avenue to Fletcher Avenue, thence to US 218. This detour is expected to be in place a maximum of ee days. The IDOT will restore the detour streets, nearly as possible, to as good of condition as it was prior to its use as a detour. Background Information: Detour map is attached. 607) 4coc_ caS c.,,,wct4L-51j lg. 34 https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8664 6/7/2017