HomeMy WebLinkAboutAecom Technical Services-6/19/2017A COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO 2017 GATEWELL REPAIRS CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated August 1, 2016, for the design survey and final design for the 2017 Gatewell Repairs Project in Waterloo, Iowa; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for construction -related services for the 2017 Gatewell Repairs Project. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of the removal and replacement of five (5) gate valves, which outlet into the Cedar River. The project includes removal and replacement of existing gatewell equipment and operators, storm sewer connections, traffic control and other incidental items for the 2017 Gatewell Repairs Project. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide field review, materials testing and contract administration during the construction phase for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 3. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. .Task 4. Prepare bi-weekly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 5. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 6. Prepare and assist the Client and Contractor in processing contract change orders. A=COM Page 2 Task 7. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 8. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 9. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 10. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 11. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 12. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 13. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 14. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement. Total compensation is an estimated fee of Twenty -Seven Thousand Five Hundred Dollars ($27,500.00) and shall be segregated from the fees in the original agreement. IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated August 1, 2016. Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: CITY OF WATERLOO, IOWA By: a ��' ►'f Quentin Hart Mayor ATTEST: AECOM TECHNICAL SERVICES, INC. By 211.".<1 Douglas W. Schindel, P.E. Associate Vice President O:\Administration\AGREE\SUPPLE\SA1 2017 Gatewell Repairs CRS.doc Date Date June 7, 2017 Item Coversheet CITY OF WATERLOO Council Communication Page 1 of 1 Resolution approving Supplemental Agreement No. 1 with AECOM Technical Services, Inc. for an amount not to exceed $27,500.00 in conjunction with the F.Y. 2017 Flood Control Gatewell Repairs, Contract No. 918; and authorize Mayor to execute said document. City Council Mee ng: 6/19/2017 Prepared: 6/14/20 ATTACHMENTS: Description Type Cont 918 Supplemental Agreement No. 1 Cover Memo Resolution approving Supplemental Agreement No. 1 with AECOM Technical Services, Inc. for an SUBJECT: amount not to exceed $27,500.00 in conjunction with the F.Y. 2017 Flood Control Gatewell Repairs, Contract No. 918; and authorize Mayor to execute said document. Submitted by: Submitted By: Jamie Knutson, PE, Associate Engineer The project consists of the removal and replacement of five(5) gate valves, which outlet into the Cedar River. The project includes removal and replacement of existing gatewell equipment and operators, storm sewer connections, traffic control, and other incidental items for the 2017 Gatewell Repairs Summary Statement: project. The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide field review, materials testing and contract administration during the construction phase for the project defined above. Source of Funds: G.O. Bonds Background Information: https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=8725 6/14/2017