HomeMy WebLinkAboutAspro Inc-6/19/2017CONTRACT NO. 921
CITY OF WATERLOO, IOWA
CONTRACT MODIFICATION NO. 1
CONTRACT TITLE F.Y. 2017 STREET RECONSTRUCTION PROGRAM
CONTRACTOR ASPRO, INC.
YOU ARE HEREBY AUTHORIZED TO MAKE THE FOLLOWING CHANGES TO THE CONTRACT DOCUMENTS:
A - DESCRIPTION OF CONTRACT MODIFICATION:
ADD THE RECONSTRUCTION OF THE 1100 BLOCK OF E. 4TH STREET FROM THE NORTH PTR OF ROBY LANE
(FORMERLY KNOWN AS VACATED SAXON STREET) TO THE NORTH PTR OF DANE STREET AS ITEMIZED IN THE
ATTACHED BID ITEMS SUMMARY
B- REASON FOR CONTRACT MODIFICATION:
TO COMPLETE THE RECONSTRUCTION OF E. 4TH STREET SOUTH OF THE CANADIAN NATIONAL
RAILROAD CROSSING IN 2017 TO BETTER ACCOMMODATE TRAFFIC USING ALTERNATE ROUTES
DURING THE RECONSTRUCTION OF U.S. 63
CONTRACT TIME ADJUSTMENT:
CALENDAR DAYS FOR E. 4TH STREET
WHEN AUTHORIZED, CONTRACTOR AGREES TO PERFORM THE WORK OUTLINED ABOVE IN
ACCORDANCE WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS.
7;4-)0,-"K r1 :� y % ,,
.✓l :,a 2 1 C.�"; 1 f1�.„-<
AGREED:
AGREED:
AGREED:
ATTEST:
CONT CTOR: ASPRO, INC.
1.( )L/ 1t.d.A-v•�
CITY ENGINEER: ERIC THORSON
CITY OF WATERLOO: QUENTIN HART, MAYOR
DATE
DATE
DATE
CITY OF WA E' "• 0: ELLY FELCHLE, CITY CLERK DAT
Page 1 of 4
SETTLEMENT FOR COST OF WORK TO BE MADE AS FOLLOWS:
F.Y. 2017 STREET RECONSTRUCTION PROGRAM --- CONTRACT NO. 921
ADDITIONAL
ADDITIONAL
BID ITEM
DESCRIPTION
UNIT
ASPRO
FOURTH ST., E.
TOTAL
UNIT $
QTY
$
DIVISION I BASE BID - SECTION I
1
CONSTRUCT, MAINTAIN, REMOVE TEMPORARY ACCESS &
RESTORE
SY
$ 53.15
0.0
$ -
2
MISC. CURB AND GUTTER, PCC, 6", C-4
LF
$ 37.50
0.0
$ -
3
REMOVE AND REPLACE MISC. PCC, 6", C-4
SY
$ 60.00
0.0
$ -
4
REM/REP CURB AND GUTTER, PCC, 7.5", C-4
LF
$ 42.00
0.0
$ -
5
BRIDGE APPROACH SECTION, PCC, 9", C-4
SY
$ 97.00
0.0
$ -
6
REMOVE AND REPLACE 3" HMA/6" PCC, M-4
SY
$ 169.30
0.0
$ -
7
REMOVE AND REPLACE 4.5" HMA/6" PCC, M-4
SY
$ 173.75
0.0
$ -
8
REMOVE/REPLACE MISC. SEALCOAT W/ 2" HMA
SY
$ 52.85
0.0
$ -
9
HMA DRIVEWAY APPROACH
TON
$ 190.00
0.0
$ -
10
DRIVEWAY APPROACH AND S/W, 6" PCC, C-4
SY
$ 46.25
140.1
$ 6,479.63
11
DRIVEWAY APPROACH AND S/W, 5" PCC, C-4
SY
$ 45.75
0.0
$ -
12
SIDEWALK, 4" PCC, C-4
SY
$ 44.25
26.5
$ 1,172.63
13
SIDEWALK, CLASS A, PCC, C-4
LF
$ 37.00
0.0
$ -
14
PEDESTRIAN RAMP, PCC SIDEWALK, 6" PCC, C-4
SY
$ 47.25
10.6
$ 500.85
15
PEDESTRIAN RAMP DETECTABLE WARNING SURFACE
SF
$ 38.85
44.0
$ 1,709.40
16
SIDEWALK CURB SECTION
LF
$ 40.00
0.0
$ -
17
CONCRETE PAVEMENT REMOVAL
SY
$ 4.20
1,929.6
$ 8,104.32
18
ASPHALT PAVEMENT REMOVAL
SY
$ 3.15
0.0
$ -
19
SIDEWALK AND DRIVEWAY REMOVAL
SY
$ 3.15
261.1
$ 822.47
20
SIDEWALK REMOVAL
SY
$ 11.00
0.0
$ -
21
SAW CUT
LF
$ 5.10
90.0
$ 459.00
22
WOVEN GEOTEXTILE
SY
$ 3.50
0.0
$ -
23
MODIFIED SUBBASE
TON
$ 21.00
766.2
$ 16,090.20
24
RECYLED ASPHALT PAVING
TON
$ 62.50
0.0
$ -
25
ROADSTONE, 3/4"
TON
$ 48.00
5.0
$ 240.00
26
DRAIN TILE, 6"
LF
$ 8.00
744.0
$ 5,952.00
27
DRAIN IILE, 4"
LF
$ 25.00
0.0
$ -
28
DRAIN TILE STUB, 4"
LF
$ 7.60
0.0
$ -
29
DRAIN TILE TAP AND COLLAR
EACH
$ 650.00
0.0
$ -
30
SUBDRAINOUTLET
EACH
$ 300.00
4.0
$ 1,200.00
31
CONVERT WATER VALVE MANHOLE TO ROADBOX
EACH
$ 455.00
3.0
$ 1,365.00
32
WATER SERVICE CORPORATION, 3/4"
EACH
$ 45.00
0.0
$ -
33
WATER SERVICE CURB STOP, 3/4"
EACH
$ 149.00
0.0
$ -
34
WATER SERVICE PAVE BOX, 3/4"
EACH
$ 149.00
0.0
$ -
35
COPPER WATER SERVICE, 3/4"
LF
$ 23.48
0.0
$ -
36
WATER SERVICE TAP, 3/4""
EACH
$ 95.00
0.0
$ -
37
WATER SERVICE CORPORATION, 1"
EACH
$ 65.00
0.0
$ -
38
WATER SERVICE CURB STOP, 1"
EACH
$ 169.00
0.0
$ -
39
WATER SERVICE PAVE BOX, 1"
EACH
$ 149.00
0.0
$ -
40
COPPER WATER SERVICE, 1"
LF
$ 26.00
0.0
$ -
41
WATER SERVICE KILL
EACH
$ 350.00
0.0
$ -
42
LOWER WATER SERVICE, 3/4" OR 1"
EACH
$ 695.00
0.0
$ -
43
UNDERGROUND INVESTIGATION -WATER
EACH
$ 320.00
0.0
$ -
44
TOPSOIL, 4"
SY
$ 5.00
198.6
$ 993.00
45
HYDROSEED
SY
$ 1.26
198.6
$ 250.24
46
TOPSOIL REMOVAL FROM PARKING, EARTHWORK
SY
$ 10.50
0.0
$ -
47
CLASS E REVETMENT
TON
$ 50.00
0.0
$ -
48
CONSTRUCTION SURVEY
LS
$ 44,750.00
0.05
$ 2,237.50
49
TRAFFIC CONTROL
LS
$ 15,375.00
0.08
$ 1,230.00
50
DETOUR ROUTE - CUTLER ST.
LS
$ 1,000.00
0.0
$ -
51
DETOUR ROUTE - FRANKLIN ST.
LS
$ 1,000.00
0.0
$ -
52
DETOUR ROUTE - W. MITCHELL AVE.
LS
$ 1,000.00
0.0
$ -
53
PAINTED PAVEMENT MARKING, WATER BASED
STA
$ 50.00
2.25
$ 112.50
54
PRE-CUT PAVEMENT SYMBOL OR LEGEND
EACH
$ 400.00
0.0
$ -
TOTAL BASE BID - DIVISION I SECTION I
$ 48,918.72
Page 2 of 4
Page 3 of 4
ADDITIONAL
ADDITIONAL
UNIT
ASPRO
FOURTH ST., E.
TOTAL
DIVISION I BASE BID - SECTION II
UNIT $
QTY
$
55
STORM SEWER, 2000D, 54"
LF
$ 325.00
0.0
$ -
56
STORM SEWER, 2000D, 33"
LF
$ 155.00
0.0
$ -
57
STORM SEWER, 2000D, 30"
LF
$ 120.00
0.0
$ -
58
STORM SEWER, 2000D, 27"
LF
$ 70.50
0.0
$ -
59
STORM SEWER, 2000D, 24"
LF
$ 63.00
0.0
$ -
60
STORM SEWER, 2000D, 21"
LF
$ 124.00
0.0
$ -
61
STORM SEWER, 2000D, 18"
LF
$ 56.00
0.0
$ -
62
STORM SEWER, 2000D, 15"
LF
$ 45.50
22.0
$ 1,001.00
63
STORM SEWER, 2000D, 12"
LF
$ 44.00
106.0
$ 4,664.00
64
FLARED END SECTION WITH APRON GUARD, 24"
EACH
$ 2,400.00
0.0
$ -
65
STORM MANHOLE, SW -401, 48"
EACH
$ 4,000.00
0.0
$ -
66
STORM MANHOLE, SW -401, 60"
EACH
$ 6,300.00
0.0
$ -
67
STORM MANHOLE, SW -401, 72"
EACH
$ 8,100.00
0.0
$ -
68
STORM MANHOLE, SW -402
EACH
$ 4,850.00
1.0
$ 4,850.00
69
STORM MANHOLE, SW -406
EACH
$ 4,850.00
0.0
$ -
70
REMOVE EXISTING STRUCTURE
EACH
$ 455.00
3.0
$ 1,365.00
71
TYPE E -1-C INLET
EACH
$ 2,550.00
2.0
$ 5,100.00
72
TYPE E -2-C INLET
EACH
$ 3,500.00
0.0
$ -
73
TYPE E -3-C INLET
EACH
$ 5,000.00
0.0
$ -
74
TYPE E -1-C INLET, MODIFIED
EACH
$ 3,895.00
0.0
$ -
75
REM/REPL INLET BOXOUT, E -1-C
EACH
$ 995.00
0.0
$ -
76
REM/REPL INLET BOXOUT, E -2-C
EACH
$ 1,295.00
0.0
$ -
77
TAP AND COLLAR STRUCTURE OR PIPE
EACH
$ 1,275.00
0.0
$ -
78
INSULATE EXISTING COPPER WATER SERVICE
EACH
$ 700.00
0.0
$ -
79
FURNISH AND INSTALL MANHOLE RING AND COVER
EACH
$ 800.00
0.0
$ -
80
STORM WATER PROTECTION FOR STRUCTURES
EACH
$ 485.00
2.0
$ 970.00
81
REMOVE STORM PIPE, 54"
LF
$ 175.00
0.0
$ -
82
REMOVE STORM PIPE LESS THAN 36"
LF
$ 12.50
132.0
$ 1,650.00
TOTAL BASE BID - DIVISION I SECTION II
$ 19,600.00
ADDITIONAL
ADDITIONAL
BID ITEMDESCRIPTION
UNIT
ASPRO
FOURTH ST., E.
TOTAL
DIVISION I BASE BID - SECTION III
UNIT $
QTY
$
83
RECONSTRUCT SANITARY SEWER, 36"
LF
$ 200.00
0.0
$ -
84
RECONSTRUCT SANITARY SEWER, 18"
LF
$ 135.00
0.0
$ -
85
RECONSTRUCT SANITARY SEWER, 15"
LF
$ 75.00
0.0
$ -
86
RECONSTRUCT SANITARY SEWER, 12"
LF
$ 60.00
0.0
$ -
87
RECONSTRUCT SANITARY SEWER, 10"
LF
$ 82.00
0.0
$ -
88
RECONSTRUCT SANITARY SEWER, 8"
LF
$ 57.00
0.0
$ -
89
SANITARY SEWER SERVICE, 6"
LF
$ 43.50
0.0
$ -
90
STANDARD SANITARY MANHOLE, SW -301, 48"
EACH
$ 4,285.00
0.0
$ -
91
REMOVE EXISTING STRUCTURE, SANITARY MANHOLE
EACH
$ 450.00
0.0
$ -
92
REMOVE EXISTING SANITARY PIPE
LF
$ 30.00
0.0
$ -
93
FURNISH AND INSTALL MANHOLE RING AND COVER
EACH
$ 775.00
0.0
$ -
94
TAP AND COLLAR SANITARY MANHOLE
EACH
$ 300.00
0.0
$ -
95
ABANDON SANITARY SEWER, 8"
LF
$ 4.00
0.0
$ -
96
ABANDON SANITARY SEWER, 10"
LF
$ 4.50
0.0
$ -
97
ABANDON SANITARY SEWER, 12"
LF
$ 5.00
0.0
$ -
98
TRACE SANITARY SEWER SERVICE
EACH
$ 375.00
0.0
$ -
99
DYE TEST INVESTIGATION
EACH
$ 150.00
0.0
$ -
100
UNDERGROUND INVESTIGATION -SANITARY
EACH
$ 400.00
0.0
$ -
101
STANDARD SANITARY DROP MANHOLE, SW -301, 72", W/ SW -
307
EACH
$ 15,000.00
0.0
$ -
TOTAL BASE BID - DIVISION I SECTION III
$ -
TOTAL BASE BID
$ 68,518.72
Page 3 of 4
Page 4 of 4
ADDITIONAL
ADDITIONAL
BID ITEMDESCRIPTION
UNIT
ASPRO
FOURTH ST., E.
TOTAL
ALTERNATE A
UNIT $
QTY
$
IA
2", HMA STANDARD TRAFFIC(ST) SURFACE, 1/2" MIX, PG 58-
28S, 75% CR., NO FRICTION REQD.
SY
$9.90
1,761.4
$ 17,437.86
2A
2.5", HMA STANDARD TRAFFIC(ST) INTERMEDIATE, 1/2" MIX,
PG 58-28S, 60% CR.
SY
$10.95
1,761.4
$ 19,287.33
3A
4", HMA STANDARD TRAFFIC(ST) INTERMEDIATE, 1/2" MIX, PG
58-28S, 60% CR.
SY
$17.55
0.0
$ -
4A
3", HMA STANDARD TRAFFIC(ST) BASE, 3/4" MIX, PG 58-28S,
60% CR.
SY
$12.80
1,761.4
$ 22,545.92
5A
2", HMA HIGH TRAFFIC(HT) SURFACE, 1/2" MIX, PG 58-28S, 75%
CR., NO FRICTION REQD.
SY
$10.60
0.0
$ -
6A
4", HMA HIGH TRAFFIC(HT) INTERMEDIATE, 1/2" MIX, PG 58-
28S, 75% CR
SY
$19.10
0.0
$ -
7A
5", HMA HIGH TRAFFIC(HT) INTERMEDIATE, 1/2" MIX, PG 58-
28S, 75% CR.
SY
$13.60
0.0
$ -
8A
CURB AND GU ITER, PCC, C-4, 24" WIDE, 7 1/2" THICK
LF
$13.50
753.3
$ 10,169.55
9A
CURB AND GUTTER, PCC, C-4, 24" WIDE, 9" THICK
LF
$16.25
0.0
$ -
10A
CURB AND GUTTER, PCC, C-4, 24" WIDE, 10" THICK
LF
$18.00
0.0
$ -
11A
COLD WEATHER CONCRETE PROTECTION
SY
$4.25
0.0
$ -
12A
LINSEED OIL TREATMENT
SY
$4.50
0.0
$ -
13A
PAVEMENT SAMPLES AND TESTING
LS
$3,500.00
0.03
$ 105.00
14A
EXCAVATION
CY
$11.00
139.1
$ 1,530.10
TOTAL ALTERNATE A
$ 71,075.76
TOTAL BASE BID DIVISIONS 1, 2, 3 AND ALTERNATE A
$ 139,594.48
JUSTIFICATION FOR COST(S):
THE UNIT COSTS RECEIVED WITH THE COMPETITIVE BIDS FOR CONTRACT 921 ARE FAVORABLE TO THE CITY OF WATERLOO FOR ADDING THIS
WORK TO THIS CONTRACT. THE CITY OF WATERLOO HAD PLANNED TO INCLUDE THE 1100 BLOCK OF E. 4TH STREET IN THE F.Y. 2018 STREET
RECONSTRUCTION PROGRAM. HOWEVER, DUE TO COSTS AND COORDINATION WITH FUTURE PROJECTS IN THE AREA, IT IS BETTER TO
COMPLETE THIS WORK IN 2017.
Page 4 of 4
Item Coversheet
CITY OF WATERLOO
Council Communication
Page 1 of 1
Motion approving Contract Modification No. 1 for a net increase of $ for the FY 2017 Street Reconstruction Program, Contract
No. 921; and authorize thel ay and City Clerk to execute said document.
City Council Meetin
Prepared: 6/14/2017
SUBJECT:
Submitted by:
Recommended Action:
Summary Statement:
Source of Funds:
Background Information:
Motion approving Contract Modification No. 1 for a net increase of $lam' 'i r" 3for the FY
2017 Street Reconstruction Program, Contract No. 921: and authorize the Mayor and City Clerk to
execute said document.
Submitted By: Dennis Gentz, PE, Assistant City Engineer
Approve Contract Modification No. 1
To complete the reconstruction of E. 4th Street from Walnut Street through Dane Street in 2017
to accommodate traffic using E. 4th Street as an alternate route during the reconstruction of US 63 in
2018 and 2019.
This would add the reconstruction of the 1100 block of E. 4th Street from the North PTR of Roby
Lane (formerly known as vacated Saxon Street) to the North PTR of Dane Street.
Local Option Sales Tax Funds
US 60, between Franklin Street and Newell/Conger Street, will be under construction during the 2018
and 2019 construction seasons. During this time a lot of traffic is expected to use E. 4th Street as an
alternate route. Completing this block of E. 4th Street in 2017 will avoid it being closed during the US
63 project. Also the unit prices for this work to be done with the FY 2017 Street Reconstruction
Program, Contract No. 921, are favorable to the City.
https://waterloo.novusagenda.com/AgendaWeb/CoverSheet.aspx?IternID=8726 6/14/2017