Loading...
HomeMy WebLinkAboutJasper Const - FY17 Repairs to 6th, 18th & Ansborough Brdges-8/28/2017CITY OF WATERLOO. IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2017 REPAIRS TO 6TH STREET, 18TH STREET & ANSBOROUGH AVENUE BRIDGES CONTRACT NO. 916 Date Prepared: Auqust17,2017 AMOUNT: $62,728.91 INCREASE TO: Jasper Construction Services, Inc. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated September 7, 2016. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. Note: $59,135.59 of this increase is due to repairs on the Park Avenue Bridge, which was not part of the original contract. The remaining $3,593.32 increase is associated with changes to the original project. BY: L/vv Mayor ATTEST: /I, / City Clerk V -a -s A Date kir- Date TOTAL INCREASE $62,728.91 Jasper Construction Services, Inc. CONTRACTOR BY: TITLE: 8//g// 7 Date APPROVED: City Engineer Date Final Quantity Adjustment Cont. #916 Sheet 1 of 2 kV. 2016 REPAIRS TO 6TH STREET, LOTH STREET AND ANSDDROUGH AVENUE BRIDGES CONTRACT NO. 916 FINAL PERIOD: Dun 30 Days from date of acceptance of work OM Item Bld Item Descdptlon Units Odglnal 914 qurntiIV FInoI QvanOty Jerper Unit Jasper Unit Hee Extended Increase/ Decrease 1 Structural Concrete(Mlscddneous) CI' 6.0 6.60 0 $ 1,750.00 $ 11,55000 $ - 2 Reinforcing Street, Epoxy Coated 1.11 700 700,00 D $ 2.50 $ 1,750.00 $ 3 Neoprene Gland lnsteltetlon and Testing IF 584 584.00 0 $ 170.00 $ 99,200.00 $ 4 Concrete Repair Part !al Depth Bridge Deck flnlsh Patch SF SF 22 255 22.00 255.00 0 0 $ 150.00 $ 40,00 $ 3,300.00 $ 10,200.00 $ - 5 - 5 6 Safety Closure EACH 32 32,00 0 $ 100.00 $ 3,200.00 $ - 7 Construction Survey LS LS 1. 1 1_00 1.00 0 0 $ 1,000.00 $ 14,000,00 $ 1,000.00 $ 14,000,00 $ - $ - 8 Traffic Control 9 tvtoblllzetion LS 1 1.00 0 $ 24,000.00 $ 24,000,00 5 - 10 Furnish and Install Ll4htpole Anchorboit Covers EACH 40 40.00 0 $ 75.00 $ 3,000.00 $ • 11 Remove and Replace Expansion Joint Curb Piste EACH 6 6.00 0 $ 800.00 $ 4,800.00 $ - 12 Furnish and Install Expansion Joint Covorptate EACH 10 10.00 0 $ 1,700,00 $ 12,000.00 $ • 13 Remove Existing Floadwell Channel LF 31.5 31.30 0 $ 80.00 $ 2504,00 $ - 14 Furntsh and Install Floodwall Channel LF LF 51.5 19 31,30 19.00 0 0 $ 320,00 $ 50.00 $ 10,016.00 $ 1,710,00 5 - $ - 15 Remove Existing Miley Box Frame 16 Furnish and Install Utility Box Frame and Covers Famish and Install Deflector Plate LF I5 19 1 19.00 1,00 0 0 $ 900.00 $ 4500,00 $ 27,100.00 $ 4,500.00 $ - 5 - 17 EACH ORIGINAL • CONTRACT 1,00 ITEMS 1,00 TOTAL $ 800.00 $ 223,910,90 $ 800.00 $ • $ 800.00 1-1 Furnish and Install Expamlon Joint Curb Pieta 2-1 P■rtial Depth Drklge Deck Finish Patch •6th Street SF - 102.43 102,43 $ 40.00 $ 4,09710 $ 4,09710 3-1 6th Street Traffic Central LS - 1.03 1,00 j (925 00). $ (925,00) $ (925.00) 4-1 6th Street Safety Closures EACH - 6.00 6,00 $ (100,00) S (600.00) $ (500.00) 54 Park Ave Bridge Roadway Plates LS - 1.00 1.00 $ 4,979.84 $ 4,979,84 $ 4,979.84 6-1 Park Ave Othige Expanslon Joint RepairsLS - 1.00 1.00 5 54,155,75 $ 54,155.75 $ 54,155,75 7-1 Ansborov4h Ave Expen0on Joint Adjustment+ 5th Street Sidewalk Cover PlatesLS 1.00 1.00 $ 22L12 $ 221.12 5 221.12 CHANGE ORDER ITEMS TOTAL $ 62,722.91 $ 62,728,91 PARK AVE CHANGE ORDER ITEMS TOTAL $ 59,135,59 $ 59,135.59 $ 286,638,91 PAY ESTIMATE NI $ E00.00 $ 37,314.00 PAY ESTIMATE 22 CHANGE ORDER O3 $ 37,441.08 PAY ESTIMATE 113 1 (800.00) $ 4,401.00 PAY ESTIk1ATE 24 CHANGE ORDER 00 Expansion Joint Repalra on ParkAvonue $ 120,760.00 $ 49,740.17 PAY ESTIMATE LT5 $ 221.12 PAY ESTIMATE 88 $ 62,728,91 s 109.01 RETAINAGE $ 28.663.69 TOTAL PAYMENTS $ 188,038.91 CHANGE ORDER 21 $ E00.00 CHANGE ORDER 82 $ 4 CHANGE ORDER O3 (925,09095.0 $ (0 ) CHANGE ORDER 04 1 (800.00) CHANGE ORDER 05 Temporary else! plalesonPark Avenuo $ 4,B79B4 CHANGE ORDER 00 Expansion Joint Repalra on ParkAvonue $ 54.155.76 CHANGE ORDER A7 $ 221.12 CHANGE ORDER TOTAL $ 62,728,91 ORIGINALCONTRACT AMDUNT $ 223,91020 FINAL QUANTITY SUMMARY $ 82,72491 FINAL CONTRACT AMOUNT 9 209,638,91 FINAL QTY. ADJ. Cont. 0916 Sheet 2 0f 2