HomeMy WebLinkAboutPella Roofing - CO #2 - Hangar 5 Rehb-8/28/2017CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date August 23 2017 Project Hangar 5 Rehabilitation Owner's Contract No. State Contract No. 18516 Contractor Pella Roofing & Insulation, Inc. Date of Contract Start July 17 2017 You are directed to make the following changes in the Contract Documents. Description: ITEM UNIT DESCRIPTION UNIT QUANTITY AMOUNT NO. PRICE 102 Metal Wall Repairs LS $ 6,000.00 1 $ 6,000.00 TOTALS $ 6,000.00 Reason for Change Order: Item 102 — This change order provides for added repairs to the metal wall system on the existing hangar where metal has rusted near fasteners resulting in the metal siding pulling away from the building. In the areas of these fasteners, additional fasteners will be installed, these areas primed and the areas then sealed with a urethane sealant. The contractor will provide a workmanship and materials warranty for a period of 10 years after installation. Hangar #5 Rehabilitation CO -2 1 Project No — 60532584 CONTRACT PRICE Original: $ 65,994.99 Previous C.O.s (ADD): $ 5,550.00 This C.O. (ADD): $ 6,000.00 Contract Price with all approved Change Orders: $ 77,544.99 CONTRACT TIMES (Calendar Date) Substantial Final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 09/15/2017 0 0 09/15/2017 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMME EED: By: ��G V� G� Engineer (Authorized Signature) APPROVED: By: Q Owner (Authorized Signature) ACCEPTED: By:V'0/..,rui.le Contractor (Authorized Signature) 8730%T Date Date C c 2-)7 �`l 7 Date Hangar #5 Rehabilitation CO -2 Project No — 60532584 2 AECOM RECEIVED SEP 0 1 2017 August 30, 2017 Mr. Keith Kaspari Director of Aviation Waterloo Regional Airport 2790 Livingston Lane Waterloo, IA 50703 SUBJECT: Hangar 5 Rehabilitation 2017 CSVI Program Waterloo Regional Airport Waterloo, Iowa AECOM ID No. 60532584 Dear Mr. Kaspari: AECOM 515 323 7919 tel 500 SW 7th Street 515 244 4803 fax Suite 301 Des Moines, Iowa 50309 www.aecom.com COPY Attached for your review and approval is Change Order #2 on the above referenced project. Change Order #2 is for added repairs to the metal wall system on Hangar No. 5 where metal has rusted near fasteners resulting in the metal siding pulling away from the building In the areas of these fasteners, additional fasteners will be installed, these areas primed and the areas then sealed with a urethane sealant. The contractor will provide a workmanship and materials warranty for a period of 10 years after installation. We have reviewed the information provided by Pella Roofing and Insulation and recommend approval of this change order. Change Order #2 increases the current contract value of $71,544.99 by $6,000.00 to a contract value of $77,544.99. If you have any questions or require additional information, please feel free to contact our office at your convenience. Yours sir erely, Todd L. Allyn, Enclosure: As noted cc: Mr. Shane Wright, IDOT (w/enclosures) Mr. Doug Schindel, AECOM (w/enclosures) P:160532584 ALO -FY 2017 Vertical Infra\300 Communications1310 Client1KK083017.Itr.doc