Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Peters Construction - 2017 Riverfront Stadium Flood Rpr-9/18/2017 (2)
Please return this copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, JA 50703 sw,�o Document G701TM - 2001 s�o Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 002 2017 Riverfiont Stadium Flood Repair Project for the Waterloo Leisure Services Commission, Waterloo, TO CONTRACTOR (Name and addrevv) Peters Construction Corporation 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 DATE: September 1, 2017 ARCHITECT'S PROJECT N JMRER: R1670.10.00 CONTRACT DATE: March 02, 2017 CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. CR -07: Credit to delete CR -06 (keg cooler frame replacement) previously included in Change Order#1. DEDUCT ($985.I6) TOTAL AMOUNT 01+ THIS CHANGE ORDER; REDUCE CONTRACT SUM BY ($985.16). The original Contract Sum was $ 179.590.00 The net change by previously authorized Change Orders $ -8.344.16 The Contract Sum prior to this Change Order was $ 171,245.84 The Contract Sum will be decreased by this Change Order in the amount of $ 985.16 The new Contract Sum including this Change Order will be $ 170,260.68 The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is May 01, 2017. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, LLC ARCHITECT (Firm name) 314 East 4th Street Waterloo, IA 50703 DRESS C Peters Construction Corporation City of Waterloo CONTRACTOR (First name) OWNER (Firer name) 901 Black Hawk Road PO Box 2940 Waterloo, IA 50704 P ES (Signature) B (Signature)la/T— BY (Signature) � ) 715 Mulberry Street Waterloo, IA 50703 ADDRESS •Q -4141721 ---We' Daniel C. Channel. Bradley Best Quentin Hart (biped ped name) (Typed name) DA (typed name) DATE V � /r� D DATE C1frf1 AIA Document G701"' — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA6' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:54:03 on 09/01/2017 under Order No. 8977062192 which expires on 07/13/2018, and is not for resale. User Notes: (3B9ADA29)