BUS STOP LOCATIONS ADA DESIGN - PHASE I
CITY OF WATERLOO
SUPPLEMENTAL AGREEMENT NO. 1
WHEREAS, a Professional Service Agreement was entered into by City of Waterloo (Client), and
AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated March 21, 2016, for construction of
approximately 27 bus stop locations within the City of Waterloo for compliance with the American
Disability Act (ADA) standards; and
WHEREAS, the Client and ATS desire to enter into Supplemental Agreement No. 1 to provide
construction -related services to the City of Waterloo for construction staking, construction review, testing
and project administration for ADA Bus Pad 7-8 at Maynard Avenue and Greenhill Road and Bus Pad
8-5 at S. Hackett Road and Downing Avenue.
NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as
follows:
PROJECT DESCRIPTION
The project consists of the construction of two bus stop locations within the City of Waterloo for
compliance with the American Disability Act (ADA) standards.
II. SCOPE OF SERVICES
The Scope of Services for this project is to provide construction -related services to the City of
Waterloo for construction staking, construction review and project administration for ADA Bus
Pad 7-8 at Maynard Avenue and Greenhill Road and Bus Pad 8-5 at S. Hackett Road and
Downing Avenue. The scope is further described by the following tasks:
Task 1. Provide construction staking for the bus stop pads and sidewalks at both locations.
Task 2. Answer design interpretation questions from the Client during construction..
Task 3. Perform construction site visits by design personnel at appropriate stages of
construction to review the quality of the work and to determine whether the work conforms to
the contract documents.
Task 4. Provide periodic field observation during construction to review the work to determine if
the work is proceeding in general accordance with the contract documents and that completed
work appears to conform to the contract documents. Staffing requirements may be adjusted
during the project in relation to the level of construction activity.
Task. 5. Participate in a review of the project with the Client and review staff near project
completion and prepare a list of items to be completed or corrected.
Task 6. Participate in a field observation of the completed project with the Client and review
staff before final acceptance.
Task 7. Provide the Clientwith a copy of revised drawings of the construction plans (record
drawings) for the project based on the construction observation records of the field review staff
and the Client showing those changes made during construction considered significant.
AECOM
III. COMPENSATION
Page 2
Compensation for the Services shall be on an hourly basis in accordance with the hourly fees
and other direct expenses in effect at the time the services are performed. Total compensation
is an estimated fee of Two Thousand Four Hundred Dollars ($2,400.00) and shall be
segregated from the fees estimated for Part VI of the original agreement.
IV. In all other aspects, the obligations of the Client and ATS shall remain as specified in the
Professional Services Agreement dated March 21, 2016.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement, No. 1 as of
the dates shown below:
AECOM TECHNICAL SERVICES INC.
By
7
Douglas W. ch ndel, P.E.
Associate Vice President
CITY OF WATERLOO, IOWA
Date September 26, 2017
By Date y,
Quentin art
Mayor