HomeMy WebLinkAboutPeterson Contractors Inc.FORM OF BID OR PROPOSAL
F.Y. 2018 SINK CREEK CHANNEL CLEANOUT AND SHAPING
CONTRACT NO. 924
CITY OF WATERLOO, IOWA
Honorable Mayor and City Council
Waterloo, Iowa
Gentlemen:
1. The undersigned, being a Corporation existing under the laws of the State of _ -owA
a Partnership consisting of the following partners.` re_2s6-3,1 Ce,are,4zmes
having familiarized (himself) (themselves) (itself) with the existing conditions on the project area
affecting the cost of the work, and with all the contract documents listed in the Table of Contents and
Addenda (if any), as prepared by AECOM now on file in the office of the City Clerk, City Hall,
Waterloo, Iowa, hereby proposes to furnish all supervision, technical personnel, labor, materials,
machinery, tools, appurtenances, equipment, and services, including utility and transportation
services required to construct and complete this F.Y. 2018 SINK CREEK CHANNEL CLEANOUT
AND SHAPING, CONTRACT NO. 924, all in accordance with the above -listed documents and for
the unit prices for work in place for the following items and quantities:
F.Y. 2017 SINK CREEK CHANNEL CLEANOUT AND SHAPING
CONTRACT NO. 924
Item .
No.
Description
Unit `
" Est. Qty.
Unit Bid Price .
-
Total Bid Price
1
Clearing and Grubbing
ACRE
2.5
$ -
10.000.
$
75,000 .
2
Excavation, Class 10, Channel
CY
2000.0
$ q -
r
$ ,S rB00r.
3
Topsoil, Strip, Salvage and Spread
CY
1000.0
$ bO
$
eorSot-
4
Topsoil, Furnish and Spread
CY
500.0
$14: 50
$ -,'Z50:
5
Stabilized Construction Areas, Class A Crushed
TON
350.0
$ 2.6,
$ goso .
6
Aprons, Concrete, 18 -In. Dia.
EACH
1.0
$ 1000•
$ 10006
7
Storm Sewer Gravity Main, Trenched, Reinforced
Concrete Pipe (RCP), 2000D (Class III), 18 -In.
LF
138.0
$too
$ $r2��
8
RCP Apron Section Footing
EACH
1.0
$ zsc :
$ 2.500,
9
Engineering Fabric
SY
1150.0
$ 3 ,
$ 3,460:
10
Fence. Field
LF
150.0
$ LC)i
$ 305co,
11
Gate, Field Fence, 16 -Ft
EACH
1.0
$ 50,
$ -750 :-
12
Removal of Fence, Field
LF
150.0
$ 5
$ 1 SO r
FORM OF BID
AECOM #60485896
CONTRACT NO. 924
FB -1 of 3
FY 2018 -Sink Creek Channel Cleanout & Shaping
item
No.
Description
nit
Est. Qty.
Unit Bid •Price
Total Bid Price
13
14
Mobilization
Seeding and Fertilizing (Urban)
LS
ACRE
1.0
3.5
$ IOtf�00r
ZI co
15
Slope and Channel Protection, Wood Excelsior Mat
SQ
935.0
$ 50
$ /6, 42,7:51)
TOTAL BASE BID
$ //8, 0o"f 5°
ALTERNATE BID ITEMS
16
Turf Reinforcement Mat, Type 2
SQ
426.0
$ 31,S3Z.—
TOTAL ALTERNATE BID
$ 3L/,93Z,
TOTAL BASE BID + ALTERNATE BID
$ 152tg39
2. It is the City of Waterloo's intention to evaluate the bids, reviewing both the Base Bid and the
Alternate Bid. The City of Waterloo reserves the right to award the contract based on the Base Bid
only or the Base Bid plus Alternate Bid.
3. It is understood that the quantities set forth are approximate only and subject to variation and that the
unit bid price for the work done shall govern in the actual payment to Contractor.
4. In submitting this bid, the bidder understands that the right is reserved by the City of Waterloo, Iowa,
to reject any or all bids. If written notice of the acceptance of this bid is mailed, telegraphed, or
delivered to the undersigned within thirty (30) days after the opening thereof, or at any time thereafter
before this bid is withdrawn, the undersigned agrees to execute and deliver an agreement in the
prescribed form and furnish the required bond and certificate of the insurance within ten (10) days
after the agreement is presented to him for signature, and start work within ten (10) days after
"Notice to Proceed" is issued.
5. Security in the sum of 5% Dollars
($ ) in the form of 12j1o ' Ff)-,MD is submitted herewith in
accordance with the INSTRUCTIONS TO BIDDERS.
6. Attached hereto is a Non -Collusion Affidavit of Prime Contractor.
7. Attached hereto is a Resident Bidder Certification ( V ), or Non -Resident Bidder Certification
( ). (Mark one.)
8. The bidder is prepared to submit a financial and experience statement upon request.
9. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in
work for the City in the current calendar year, are prepared to submit an AAP or Update and an
EOC, within ten (10) days of notification that the bid submitted is lowest and acceptable.
10. The bidder has received the following Addendum or Addenda:
Addendum No. 1 Date 5 '2I 7
FORM OF BID
CONTRACT NO. 924 FB -2 of 3
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
11. The bidder shall list the MBENVBE subcontractor(s), amount of subcontracts and bid items on the
City of Waterloo Minority and/or Women Business Pre-bid Contact Information Form submitted with
this Form of Bid or Proposal. The apparent low Bidder shall submit a list of all other Subcontractor(s)
to be used on this Project to the City of Waterloo by 5:00 p.m. the business day following the day
Bids on this Project are due along with the Non -Collusion Affidavits of All Subcontractor(s).
The Contractor shall submit information on subcontractors on "SUBCONTRACTOR REQUEST AND
APPROVAL" Form to be provided by City prior to approval of contract.
The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer
cannot be changed except for the following reasons:
1) The City of Waterloo does not approve the subcontractors.
2) The subcontractors submit in writing that they cannot fulfill their subcontracts.
12. The bidder has filled in all blanks on this proposal. Those blanks not applicable are marked "none"
or "NA".
13. The bidder has attached all applicable forms.
14. The Owner reserves the right to select alternates, delete line items, and/or to reduce quantities prior
to the award of a contract due to budgetary limitations.
< ConttR6kC 17YR-S -n!G
(Name of Bidder) /////J
BY: 7-#gte -
Official Address: (Including Zip Code):
fog FlAcki+AwK. S
Title
101 aidari
(Date)
GS T//%%fl?VJIZ
gmloP cK/ iA ,tl2(e9
I.R.S. No. Ogci go `J q
FORM OF BID
CONTRACT NO. 924 FB -3 of 3
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
INFORMATION NEEDED
FOR
IOWA CONSTRUCTION SALES TAX EXEMPTION CERTIFICATE
CONTRACTOR NAME: - 'i 2co-Nt CaTh`incr is 4te-
ADDRESS:
ge4eitinde: 5,7"
(Check One)
FEDERAL ID#:
PROJECT NAME:
PRIME ✓ SUBCONTRACTOR
IAa- 0ga16)5 LI
i' Y '7 c (R N K &PM alba (°Nair" Shomb
PROJECT CONTRACT NO.: 394
DESCRIPTION OF WORK:
E Brickwork
• Carpentry
Lj Concrete
• Drywall -Plaster -Insulation
E Electrical
><EExcavation/Grading
Flooring
_il Heavy Construction
11 Heating -Ventilating -Air Cond.
SALES TAX EXEMPTION
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
El Landscaping
^I Painting
Paving
u Plumbing
LI Roofing -Siding -Sheet Metal
11 Windows
Hi Wrecking -Demolition
E Other (Please specify)
CONTRACT NO. 924 STE-1 of 1
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we,
as Principal, and
as Surety are held and firmly bound unto the CITY OF WATERLOO Iowa, hereinafter called
"OWNER." In the penal sum
Dollars ($ ) lawful money of the United States, for the payment of which
sum will and truly be made, we bind ourselves, our heirs, executors, administrators, and successors,
jointly and severally, firmly by these presents. The condition of this obligation is such that whereas the
Principal has submitted the accompanying bid dated the day of
, 20 for
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form
specified and shall furnish a bond for his faithful performance of said contract, and for the payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all other respects
perform the agreement created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in
liquidation of damages sustained in the event that the Principal fails to execute the contract and provide
the bond as provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its
bond shall be in no way impaired or affected by any extension of the time within which the Owner may
accept such Bid or execute such contract; and said Surety does hereby waive notice of any such
extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and
such of them as are corporations, have caused their corporate seals to be hereto affixed and these pres-
ents to be signed by their proper officers this day of A.D. 2017.
(Seal)
Principal
By
(Title)
(Seal)
Witness Surety
By
Witness Attorney-in-fact
BID BOND CONTRACT NO. 924 BB -1 of 1
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
NON -COLLUSION AFFIDAVIT OF PRIME BIDDER
State of -L.. u„ A
—p )ss
County of 'i Arlt' aAWV
4 r
He is
being first duly sworn, deposes and says that:
Owner Partner Offic- `e.resentativ
r Agent) of
the Bidder that has su.mitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
employees, or parties in interest, including this affiant, has in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a
collusive or sham Bid in connection with the Contract for which the attached Bid has been
submitted or to refrain from bidding in connection with such Contract, or has in any manner,
directly or indirectly, sought by agreement or collusion or communication or conference with any
other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or,
to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to
secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and
The price or prices quoted in the attached Bid are fair and proper and are not tainted by any
collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its
agents, representatives, owners, employees, or pa in ' res nclu.;' gar's affiant.
(Signed) l i
Title
Subscribed and sworn to before me this // /q�j day of leAlt___- 2017.
My commission expires ' 3O I i
NON -COLLUSION AFFIDAVIT
Title /U6 rC-
A AL. CLARK
MY
Number 798999
uW.. My Commission Expires
August 30, 2019
CONTRACT NO. 924 NCA -1 of 2
AECOM #60485896 FY 2018 Sink Creek Channel Cleanout & Shaping
CONTRACT NO:
RESIDENT BIDDER CERTIFICATION
q(N
PROJECT NAME:
DATE OF LETTING:
(2)/e3 cc/QK. (1.2/9 -74/6: -Cr
0;2 /ter 7
To be a qualified resident bidder, the bidder shall be a person or entity authorized to
transact business in this state and having a business for at least three years prior to the
date of the first advertisement for the public improvement. If another state or foreign
country has a more stringent definition of a resident bidder, the more stringent definition
is applicable as to bidders from that state or foreign country.
This qualification as resident bidder shall be maintained by the contractor and his subcontractors at the
work site until this project is completed.
I hereby certify that I am a resident bidder as defined above.
COMPANY NAME 1' 2 Scsrl NCS
CORPORATE OFFICER
TITLE T eIr
DATE /V/07
RESIDENT BIDDER CONTRACT NO. 924 RB -2 of 3
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
CON '• CT NO.:
PROJEC ME:
DATE OF LET \G:
NON-RESIDENT BIDDER CERTIFICATION
I hereby certify that I am an lo - non-resident bidder.
COMPANY NAME:
CORPORATE OFFICER:
TITLE:
DATE:
STATE/COUNTRY OF RE . IENCY:
Stated below e the preference(s) to resident bidders in the state/country of
(Preferenc= o bidders, labor force, or other preferential treatment to bidders or la
rers, etc.
RESIDENT BIDDER CONTRACT NO. 924 RB -3 of 3
AECOM #60485896 FY 2018 -Sink Creek Channel Cleanout & Shaping
Ali
a1"`1ao�3 MBE/WBE BUSINESS ENTERPRISE
PRE-BID CONTACT INFORMATION FORM
Prime Contractor Name:? 'EC&sA `oarraAcC YLs Project: ,.-0/9i/B S U.�/
92detting Date: /002 /XI
NO MBE/WBE SUBCONTRACTORS: If you are NOT using any MBE/WBE subcontractors to complete this project, sign below. Attach a brief
explanation as to why subcontracting was not feasible with this project. If any MBE/WBE subcontractors will be used, please use the bottom
portion of this form.
Contractor Signature: _ Title: _ Date:•
_
SUBCONTRACTORS APPLICABLE: You are required, in order for your bid to be considered responsive, to provide the information on this form
showing ALL of your MBE/WBE subcontractor contacts made for your bid submission. This information is subject to verification. Any questions
should be directed to Contract Compliance Office 319-291-4429.
You are required, in order for your bid to be considered responsive, to provide the information on this Form showing your MBE/WBE Business
Enterprise contacts made prior to your bid submission. This information is subject to verifications and confirmation.
If you are unable to identify MBE/WBE firms to perform portions of the work, please contact Louis Starks, Contract Compliance Officer, for
assistance at (319) 291-4429.
In the event it is determined that the MBE/WBE Business Enterprise goals are not met, then before awarding the contract the City of Waterloo will
make a determination as to whether or not the apparent successful low bidder made good faith efforts to meet the goals.
TABLE OF INFORMATION SHOWING BIDDER'S PRE-BID
MBE/WBE BUSINESS ENTERPRISE CONTACTS
Quotes Received Quotation used in bid
MBE/WBE
Subcontractors
Dates
Contacted
Yes/No
Dates
Contacted
Yes/No
Dollar Amount Proposed to
be Subcontracted
/1r EbAJc& 5Eey
14/1
y�S
16'lk
YES
oe
5621c'4 .
MIA - Akr ftseuaN lei IRK
60( 7Al Po=er:
(Form CCO-4) Rev. 06-20-02
MBENVBE PARTICIPATION
AECOM # 60485896
CONTRACT NO. 924
M-6 of 6
FY 2018 -Sink Creek Channel Cleanout & Shaping
BID BOND
KNOW ALL. MEN BY THESE PRESENTS, that we, Peterson Contractors, Inc.
as principal, sand Travelers Casualty and Surety Company of America
as Surety are held and firmly bound unto the CI TYOF yVAT E RI.00: , Iowa, :hereinafter called
"OWNER." in the penal sum Five Percent (5%) of Total Amount Bid
Dollars ($v_ 5% —.) lawful money of the United States. for the payment of which
sum will and truly be made, we bind ourselves: our heirs, executors, administrators, and successors,
jointly and severally, firmly by these presents. The condition of this obligation is such that whereas the
Principal has submitted the accompanying bid dated the 12th _ day of October
20 17_ , for FY 2018 Sink Creek Channel Cleanout and Shaping in the City of Waterloo, IA -
Contract No. 924 _
NOW, THEREFORE,
(a) If sad Bid shall be rejected, or in the alternate,
(o) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form
specified and shrill furnish a bond for his faithful performance of said contract, and for tlx: payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all other respects
perforin ti're agreement crested by the acceptance of said Bid,
Then this obligati -On shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority: the full amount of this bid bond shall be forfeited to the Ower in
liquidation of damages sustained in the event Ibat the Principal fails to execute the contract and provide
the bond as provirled in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that they obligations of said Surety and its
bond shall be in no way impaired or affected by any extension of the time wither which the Owner may
accept such Bid or execute such contract: and said :;urcty does hereby waive notice of any such
extension.
IN WITNESS WHEREOF, the Principal and the Surety, have hereunto set their hands and seals, and
such of them as are corporations, have caused their corporate seals to be hereto affixed and these pres-
ents to be signed by their proper officers this 29th day of September,_. A.D 2017
Peter Qp..;�ontractors, Inc.
far'- ...)al
Travelers Cage
piiiritent
(Seal)
Ity and Su ty Company of America (Seal
S
Witness — Brian Deimerly
010 B0N
AEGOM 06448fiB:;(3
GON`r r ii.4CT NO cr ,4
rn ey-in-fact
Anne Crowner
ofr
FY 2015 ---Slit Gre:tk Chin trtilI inc:kt & shapin_
TRAVELS
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
Attorney -In -Fact No. 231471
POWER OF ATTORNEY
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
Surety Bond No. or Project Description: Principal: Peterson Contractors, Inc.
Bid Bond Obligee: City of Waterloo
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian
Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of
America, and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and
Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance
Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the
Companies do hereby make, constitute and appoint Craig E. Hansen, Jay D. Freiermuth, Brian M. Deimerly, Cindy Bennett, Anne Crowner,
Tim McCulloh, Stacy Venn, Shirley 5. Bartenhagen, and Dione R. Young of the City of West Des Moines State of Iowa, their true and lawful
Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds,
recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing
the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 24th day of
October, 2016.
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
St. Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
State of Connecticut
City of Hartford ss.
By:
Robert L. Raney, Senior Vice President
On this the 24th day of October, 2016, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President
of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and
Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company,
Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do,
executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
In Witness Whereof, I hereunto set my hand and official seal.
My Commission expires the 30th day of lune, 2021.
cAALL C. .L41Axakt
Marie C. Tetreault, Notary Public
VYM_Vviak
'a'AIRACAMS
BOX A
REINBECK, IOWA 50669-0155
ro VgatSibt
Kt CM% CMI L CAEAMIiAl
CoNstitcar1J, 92q
eery or 1A1Aitcti-oo #7A
DEiER50H
2AUACZORS
0�1C.
BOX A
REINBECK, IOWA 50669-0155
05 to cMb
Swat Cum Cuus4.0. CsaAtiatT
Cm a WA -moo