Loading...
HomeMy WebLinkAboutBHCo. - MOU - Communication Tower-9/18/2017Please return this copy to: City Clerk & Finance Dept. 115 Mulberry St. Waterloo, IA 50103 MEMORANDUM OF UNDERSTANDING BLACK HAWK COUNTY — CITY OF WATERLOO COMMUNICATION TOWER BLACK HAWK COUNTY (hereinafter "County") and the CITY OF WATERLOO (hereinafter "City") have constructed a replacement public safety tower (hereinafter "Tower") located at 715 Mulberry Street, Waterloo, Iowa, to accommodate present and future antennas, equipment and shelters of the E911 Service Board (hereinafter "Board"). The Tower was constructed to meet all engineering requirements needed to support equipment for public safety and other needs for communication, broadcasting, transmission and reception of wireless communication signals and related services for the mutual benefit of the County, the City, the Board and such other parties and agencies as the parties to this Memorandum of Understanding (the "MOU") may hereafter agree. 1. As of the date of execution of this MOU, the County as current owner of the new Tower located on Waterloo City Hall property, agrees to and does hereby transfer to the City all right, title and interest in and to the Tower. The City hereby accepts all right, title and interest in and to the Tower as of the date of execution of this MOU, and further agrees to maintain ownership hereafter and to maintain future licensing requirements. 2. The construction, ownership and maintenance of the new Tower have been agreed to by the parties, and attached hereto and by this reference made a part of this agreement are copies of relevant documents on the construction, ownership, and maintenance of the new Tower as follows: (a) Memorandum of Understanding dated May 31, 2016, marked Exhibit "A"; (b) Standard Form of Agreement Between Owner and Contractor dated July 6, 2016 (the "Construction Contract"), marked Exhibit "B"; (c) Construction Drawings of the Tower and its component parts, marked Exhibit "C"; and (d) an itemization of Tower loadings as of the date hereof, marked Exhibit I'D". The parties agree that the Tower was built substantially in accordance with the Construction Drawings, and such drawings are hereby adopted by the parties as as -built drawings of the Tower. 3. The City hereby grants to the Board the easement rights for reasonable ingress and egress onto the Waterloo City Hall property for such purposes of maintenance and care of the present and future Board antennas, equipment and shelters as the Board reasonably deems necessary. The Board shall provide no less than 24 hours' advance notice to the City before exercising its access rights, except in cases of emergency, in which case the Board shall contact the City as soon as possible to report the entry that was made and the purpose of same. These arrangements assume and understand that the City shall, nevertheless, be responsible for the general upkeep and care of the Tower and its facilities, including maintenance and repair. Nothing herein shall be construed to make the City liable for the costs of maintenance, repair or replacement of any antenna or related equipment or components that are owned by the Board or parties other than the City. 4. The FAA aircraft warning light on the Tower shall be maintained and operated by the City so long as the City is the owner of the Tower. Additional details and responsibility for the maintenance and the operation of the Tower shall be determined by the Board and the City. This FAA warning light and its controller (located inside the radio equipment shelter) are powered by the Board's electric meter and monitored by RACOM via the site monitoring system, thus conforming to FAA requirements. If the warning light fails, it shall be the responsibility of the City to notify the FAA within the time period specified by FAA regulations and to arrange for its repair. 5. The parties agree that any future equipment placed on the Tower will have to be in compliance with engineer's specifications, by a structural engineer as agreed upon by the City and the Board. Any equipment placed on the Tower in the future shall not interfere with the transmission or reception of the E-911 Public Safety Systems or Emergency Management Equipment on the Tower. It shall be the responsibility of the agency, organization or company adding to or modifying the Tower to insure this compliance. Both the Board and the City will make said party aware of any changes to tower loading before such action occurs. Because the Tower has been designed and installed in accordance with the TINEIA-222G Standard, grounding meeting the Harris AE/LZT 123 4618/1, Rev D Installation Planning Specifications and all antenna mounts also conforming, it is agreed that any future changes or modifications will follow the same requirements. 6. The County hereby assigns to the City all of its warranties and rights arising from or in relation to the Construction Contract, and the County further agrees to cooperate with the City promptly and in good faith in the handling of any warranty claim,'claim for defective workmanship, or any other claim of any type or nature whatsoever that arises from or in relation to the Construction Contract. 7. Amendments to this MOU shall require the written consent of all parties. This MOU may be executed in multiple counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, the parties hereto have executed this Memorandum of Understanding by their duly authorized representatives as of the date set forth beneath each signature. [signatures on next page] 2 BLACK HAWK COUNTY, IOWA CITY OF WATERLOO, IOWA BY: ��fild fXi^.� BY: Chair ATTEST: %'fGt�� Auditor Date: —1/— 020/7 E911 SERVICE BOA BY: ATTESTS Y Date: 0-z3-/ 1 3 Mayor ATTEST. City CI: k Date: /t7 +-�rcdr,. Exhibit "A" MEMORANDUM Oil UNDERSTANDING BLACI{ 11AWK COUNTY -WATERLOO COMMUNICATION 'I'OVVI?R BLACK HAWK COUNTY (hereinafter County) and the CITY OF WA1'iRLOO (hereinafter City) have agreed that as a part of'thc recent bonding project (the Black hawk County Public Safety Radio System, passed by Black Hawk County, January 20, 2015) a portion of the funds from that project ("Bond Funds") shall be used to construct a replacement lower presently used by both parties. I. The present tower located on City !tall property has been used by both parties for siren projection services for the public, and other communication needs. 2. The County agrees that from Bond Rinds it will erect a new tower whose purpose shall he to provide communication, broadcasting, transmission and reception of wireless communication signals and related services for the mutual benefit of the County, the City, and such other parties and agencies as the parties to this Memorandum of Understanding may hereafter agree. 3. As of the date of execution of this Memorandum of Understanding, the parties have not yet agreed who the ultimate owner of the tower shall he. The parties do agree that at the completion of the tower project, ownership of the tower shall be established in one party by written instrument executed by both parties. 4. The County shall be responsible to demolish the present tower and to erect a new tower. The new tower shall he erected pursuant to plans, specifications, and other requirements as set forth in a future. agreement of the parties and shall be designed with the capability to meet the present and foreseeable future communications uses and needs of the parties. Therefore, both parties shall have part in making decisions for the erection and strength of the new tower. 5. If the City chooses to benefit from having additional cellular carriers on the new tower, it shall be responsible for the additional costs to allow for strengthening of the tower. 6. The County intends to place a 35Kw generator to meet the needs of the tower site and components. There will be an alternate bid for a 200Kw generator in the RFP to provide power to the City Hall building as well as the tower sitc. if the City decides to go with the optional price for the 200Kw generator, the cost difference between the 35Kw Generator and the 200Kw shall be borne by the City. 7. During the period of removal of the old tower and construction of the new tower, and ininmediately prior to transfer of ownership, the County shall be responsible and liable for, and shall hold harmless the City from and against, all claims, demands, causes of action, and liabilities of any type or nature. including but not limited to reasonable attorney's fees and expenses, arising from or in connection with all activities relating to said removal and construction that are attributable to any acts or omissions of the County, its agents, or employees. Except as may he set forth in this paragraph or in a separate agreement between the parties, Duce title and ownership to the tower are transferred, the new owner shall be responsible and liable for, and shall hold harmless the other party from and against, any loss or damage arising from any claim to the extent such loss or damage is attributable to any acts or omissions of the owner, its agents, or employees. Thereafter, the owner shall maintain and operate the tower and be responsible for its care and upkeep as the owner of the tower, If the City is the new owner, it shalt not be responsible for the upkeep, care and maintenance of the E91 1 Service Board's radio system antennas, shelters and equipment, which shall be solely the E911 Service Board's responsibility. The E911 Service Board's maintenance of the antennas shall be done in a way that is mutually satisfactory to both parties. In connection with establishing ownership of the completed tower, the parties will enter into an agreement providing for insurance and any other issues of joint cost or responsibility. 8. During the period of construction, the City is to maintain ownership of the new tower due to licensing requirements. 9. Once ownership of the tower is established in one party, the City shall grant to the E911 Service Board the easement rights for ingress and egress onto the property for such purposes of maintenance and care of the E911 Service Board antennas, equipment and shelters as the Board deems necessary. If the E91 1 Service Board is the new owner of the tower, it shall grant to the City an easement of rights for ingress and egress for purposes of maintenance and care of the City equipment . These arrangements assume and understand that the owner shall, nevertheless, be responsible for the general upkeep and care of the tower and its facilities, including maintenance and repair. The aircraft warning light on the tower shall be maintained and operated by the County up to the point of transfer of the tower to the owner. Final details of ownership and responsibilities will be determined between the E911 Service Board and the City of Waterloo. 10. The parties estimate that this project shall take approximately one year to complete. 11. The parties agree that any future equipment placed on the new tower will have to be in compliance with engineer's specifications that the tower was built for. Any equipment placed on the tower in the future cannot interfere with the transmission or reception of the E-911 Public Safety Systems. 12. The parties agree that some antennas on the old tower will need to be moved to the new tower. The old tower is 250 feet and the new tower is planned at 230 with antennas to 250 feet. The parties intend that the new tower shall include the following: A. Three 5.8 GHz Traffic Department radio/antennas (per RC Systems) will be moved to the new tower. a. One for Bridges (120' on southwest leg) b. One for Sullivan ( 150' on the east leg) c. One for Covenant Medical Center (155' on the east leg) B. One Siren activation antenna (per RC Systems) will be moved to the new tower a. Replacement antenna will be located at 200' C. Space for future City department antennas (per RC Systems) at about 100'-115' D. US Cellular BDA antenna for in -building cellular phone support at about 50' l . Verizon BDA antenna for in -building cellular phone support at about 80'. This list is incomplete but a reflection of the expectations of the parties. 13. Also attached hereto is a drawing of the tower and special permit application. These are referred to an incorporated herein by reference as attachment 2 and 3. 14. Amendments to this Memorandum or Understanding will require the written consent of both parties. BLACK HAWK COUNTY. IOWA Chairi>erson Attest: - CITY OF \VATIiRLOO - 13Y:t Mayor COMB Auditor, Grant Vecder Date: f 1 AOIii. ( 251 .-7t) II ff Date (Note: Attachments referenced above are not included with this Exhibit "A".) Exhibit "B" ,,kfyt.Q 6 Document A101' ® 2007 ZEISEI Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the Sixth in the year 2016 (In wards, indicate day, month and year.) day of July BETWEEN the Owner: (Name, legal status, address and other information) Black Hawk County lv3tmx 91 21 E. G lt-Strast 3 t Ski Nreef Waterloo, IA 50703 and the Contractor: (Name, legal status, address and otter information) Murphy Tower Service, LLC 20220 Hwy 5 Carlisle, IA 50047 for the following Project: (Name, location and detailed description) Tower Site Construction Black Hawk County, IA The Architect: (Name, legal status. address and other information) Edge Consulting Engineers, Inc. 624 Water Street Prairie du Sac, WI 53578 The Owner and Contractor agree as follows. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201'11-2007, General Conditions of the Contract for Constnlclion, is adopted in Ibis document by reference. Oo not use with other general conditions unless this document is modified. AIA Document A101' -2907. Copyright P1915. 191e. 1925, 1937 1951. 1950. 1961, 1963, 1967. 1974, 1977, 1987, 1901, 1997 and 2901 by The Pmerran Ira66ae of Arch9ats, All dyhp reserved. WARNING: This AIA'0ocument i5 protected by U,5 Capynght taw and InternationalTreaties. Unauthorized reproducilon or dlsbibudon of Ole AIA Oocument, or any portion of it, may result In saves chill and cdminal pena0ies, and will be prosecuted to the maximum extant possible under the lax. ibis document'xes creel ed on 07 06,2016 10 40 27 under the terms of AIA Occumenls.on.Oemand^' order no, 2009335045 , a'd's not 'or 'esele. This document is kwued by the Amerman !rsetule of ArchhleCls for one -erne use only. and may nal he 'eeroducsi et 10Its completion. TABLE OF ARTICLES THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT MD SUBSTANTIAL COMPLETION CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addcnda issued prior to execution of this Agreement, other documents listed in this Agreement and Modification; issued after execution of this Agreement, all of which form the Contract, and are as fu11y a part of the Contract as if attached to !his .Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parries hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a ,Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility oJothers. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shalt be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (insert the date of commencement iif k differs fiv,n the date of this Agreement or, applicable, Male that the date 'vi//be jived in a rtarice to proceed.) Commencement date shall be on or before July t8, 2016. (f, prior to the commencement of the Work, the Owner requires rime to fife mortgages and other security interests, the Owner's time requirement ;hall be as follows; § 3,2 The Contract Time shall be measured from the date of commencement. Init. NA Document Alpt"- 2C07. Copyright 61915, 1916. 1925. 1937 1951.1956.196'.1963, 1967, 1974,197? 1907, 1991, 1997 and 2601 by r a Arn&anipssa.1a of Atlilees. All dgins reseived. WARNING: This AIA'Document Is junta -tee by U.S. Copyright Law and Inlenral oral Treaties Unauthnhzed reproduction cr distribution el this AtA Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to Ne maximum extent possible under, he law Ti's droumenl was created an 070162018 10 40 27 under Ire lentis al AIA Cccumenis-or. - ✓+i✓�� 0r resale. Pus deeuiner.in1cenaed by no.merran toslimla;r?me plods for onetime use only. and may col be-epleduced soro0a5Ccmpeion]]5'oi5 .ern �a vol 2 Inn. § 3:3 I h; (',)tra,2tot ;hall )Cn1-10 117,1.11 Comni;uon of the enters: t1f ark not !slot than De::emher 13, 20 ) days from the date of commencement, or as follows. (insert mumbo. of calendar du'. r.. 71(10uttmels a clinoular data nruy be used wh?,t coordtna:ed wird the tar 0/ 2(1(2101.( tt'llell!iappropn'w.Ins.mt'_ptt tree len 7tlrN'.arher5'u1Slan1/0/Oolp genian ofr.•or'ra Ut portions a) rile WO.' k.; Portion nl the Work Substantially Complete All Work Substantial Completion Data December 15, 20)5 Fully Complete All Work May 15, 2017 , subject to adjustments or this Contract Time as provided in the Contract Documents. (Insert provisions, if any. for liquidated damages relating 0 failure to achieve. Substantial Completion of time or/01 bonus payments for early conlplerion of the Work.) ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in eu. rent funds for the Contractors performance of the Contract, The Contract Sum shall be One million twenty six thousand five hundred Dollars (5 1,026,500.00 1, subject ro additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. !f the bidding or proposal documents permit the Owner to accept other alternates subsequent to the exeeu/ion of this Agreement. attach a schedule of such other alternates ;droving the amount for each and the date when that amount expires.) Contract Sum Includes: Base Bids 1, 2, 3, d, 5, 6, 7 and .Alternate Bids IA & I B. § 4.3 Unit prices, if any: (ldentifv and state the Unit price: ;tate quaintly limitations, if any, to which the unit price will be applicable.) Item Units and limitations Price per Unit (.30,00) Additional Tower Foundation Removal per CY beyond 57 Cu.Yds 3300 AA Document AM"'42007.cenydght7Jln'519fa,1025.1927,195119'„8.1061,''192,1067,1974,1977,1937, 1991, 1597 and 7007 bv1ho cher lI rstma of ?¢haecls. Alt dghts Rtm'd.'NARN'INGI ThIn PIA'Doonvmt-1 oroloclod oy 0 3 Copyright lay. and Inca rmAonnl TratentUntudmrhood mmOducaen ar Slim"on of thin PJA'Oecomnsit, or$ny poricn A i1. m:ry n_ncRin marm that and cdmlmd o.net'aea,: and dill ho yrssalyd':o 'nus,n,un,um extent 'ander Ihul294010.1¢umerl ,aaa:galon on 0:. 013,2015 '0 ae 2? onnon na!arms :t AJA Cccumenls.on.Cemard "' tritt no 2009335941 ,rd .2 NA :Cf r=_sou nen :oeananl 3.ur51d iv to -yr9eein 1 slilLte al +Jong ds for try Kira osa orgy n'd say 10t 10 r:ra:eoe5d ^de1'0 ti :cenblor Init• § t,:4 al ;t .: to,:::; sae•: u! t:1: _.i ;ism I. Levo Priea j.SU.C(I) .ARTICLE 5 'ANEW:3 § 5.1 PROGRESS P.AYYlEN'r3 § 5.1.1 Based upon .Applications tor Pa;meat submitted to the Architect by the Contractor and Certificates far Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Cor. mc'o; air provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application kr Payment shall be one al rider month ending on the last day of the month, er as Follov,s: § 5.1.3 Provided :hat an Application for 63 !1 rent i3 nceiv:d by the Architect not later thaa ire 'first .da•, o a month, the owner shall make pa'menr of the 335t1 ped arioenr to the Contractor not later than the 156 dayof d above, the following month. Ilan Application for Payment is received by the Architect after the ap,iicriel date fixepayment shall be made by the Owner nor laser than SixTy-flee i 55 j dayi lir_ the Architect receives the ,Application far Payment (Federal. stare or local laws 'ray regub e' a:gnttnt within a cerfai,t period ultimo.) § 9.1,4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Cana -act. Documents. The schedule of values shall allocate the entire Contract Sum arnieng the various portions of the Work. The schedule of values shall he prepared in such Form and supported by such data to substantiate its accuracy as the ,,+irchirect may require. This schedule, unless objected to by the .`Architect. 3 aJJ !:e used as a basis for reviewing the Contractor's Applications For Payment. §-5.1.6 Applications for Payment scall show to percentage of completion of each portion of the Work as of the endo` the period covered by the Application far Payment, § 5.1,6 Subject to other provisions of the Contract Documents, the amount of each progress payment sea:! ba complied 33 follows: •h Take that portion of the Contract Sum properly allocable to completed Work as der:m ined by multiplying the percentage cemplaion of each portion of the Node by chc share of the Cord3c Sun allocated to that portion of the 'Mork in the schedule of values, less retainage of Ten percent ( 10%). Pending final dei ten tination of cost !e the Owner of changes in the Work, amounts not in dispute shall be included as proaided in Section 7.3 9 of AIA Document A201 n'_2C07, General Conditions of the Contract for Consmie:ion: .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site fer subsequent incorporation in the completed construction (or ii applo°.ad in advance by the Owner, suitably stored ail the site at a location agreed upon is tstritine . t3.5, rstaina3: of Ten percent iq%). .3 Subtract the aggregate of previous payments made by the Owner, and .d Subtract 3muunts, if any For v.hich the Architect has withheld or nullified 3 Cerif.cate for Payment 3s provided in Section 9S of AAA. Document A20I -2007, 11.4Oacumnnt 0.10l- 250.CopryttV lar i 1911:W73,1937 1351 Ire '3e1, 1381 IS37 117119 8 Ira 13-47 are - c — 3a1 •ych tads All ,ight3 yy d'dWPPt G Mit: a_:' 3 n t 3 a: r ds/U' cayngh I, .,rd!r r nJ 1 1 WI 1 r . t ;. 'Ftnb 5I' tial ant. 111 rta`.rl (mv A07ae,t 'I377027 ie th car3: AM CcCJ-dI cr-7, asa:cna.alzter r... pr rf0 Ja ..I his ver tel s Crvalid rt:.47rat•t IJ 70 27 . ;CirIha !•ie 1,:r A.16eevmatel•" cai -.:,wYR I .l �1Gri11:'1-. rC., Std 1•.34Yr[n r•i'Iy13r +,,i¢%-r:,'Cyjt^d.r3CJ i( +'lY ,9t `LI :+LIrCIC:d''1 a 1 o 1 I '��Srr.r Init. ,j 1.1. 1i9•2 pr•r;r.es.; payment ,Irtml,nt la a, .:otdann .evh Sstion 5 i 6 shail be flther modified ua. er fileCollowing citu,nstanres: Add, upon Substantial Completion or the Wink, 1 ;um suFndent to increase the total payments !o the tilll amount Of the Contract Sum, less such amount.; as the Architect shall determine for icon;pkte Work, retainage applicable to such work and unsettled claims.; and (Section R8.5 of .1 L! Document .4201 -2 007 requires release inapplicable reraDmge upon Sa,'r.cimuiai Completion of W014 with consent o/sure .% '/ any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault or the Contractor, any additional amounts payable in accordance with Section 9 10.3 of ALA Document .A201 -2007. § ii.1.0 Reduction or limitation of retainage, if any, shall be as follows: (if it is intended, prior to Substantial Completion of the entire (Vat to reduce or lirllir the rekinago resulting front the percentages inserted in Sections 51.6, ! and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents. insert here proidsians fa• such reduction or limitation.) None. 109a Retainage until Final Completion. 5.I.$ Except with the O`.vner's prior approval, the Contractor shall not make. advance payments to suppliers for materials or equipment which have not been delivered and stored at the sire. 5.2 E1NAL PAYMENT 5,2.1 Final payment, constituting the entire unpaid balance of dee Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract weeps for the Contractor's responsibility to corecr 'Shirk as provided in Section 12,2,2 of AIA Document .A201 -2007, and to satisfy other requirements, if any, which extend beyond final payment, and ? a final Certificate for Payment has been issued by the Architect. § 0.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 8 DISPUTE RESOLUTION § 8.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision 1b(aker pursuant to Section 15.2 of AIA Document A201 2007, unless the parties appoint below another individual, not a party to this Agreement to serve as Initial Decision Maker. (lithe parties mutually agree. insert die name, address and other cona3et infmrntation Ohne initial Decision ,Maker, if other than the Architect) PIA DCW1r9nt A101 '- 407. Capydght ]1]b 1919. 1925. 1917, 1151, 3 161 1963, 1987, 1974 377, 1197 S: s atU 2cbr 1 Ynt+sr anpn rSaLia ai amAt:da Altdgir:31IA0'U. `OI,u;J,,ini ,-cna/t, mw nP ipra15ycr al J. 1.1 crIIrs T End th,.pd'g0c 1.'.1C1L .t, P'cuIta 1L.Ic'J 91slritMion 011hlu del m ere t,a� at aordcn 612 m3=y , titin tVer II nd 611130! a 31.1 1. enI .Inti ca ndm:d v :NJ lr; <i0 53:91.9f.1 379 0 ardrctht 07, rnis aceta rt -vas crealad On 9705120 3 13 4 v', md- na m AM um els cr Cenand" 00tH o. "7053336-ri std 9 <c1 911,t 91.3 ma dour .1s i9d ay hal vino tsrrt1 01. 99:blectYr pre.99,9±4o orq. rtl 9:1, d.35r91r at Cr re :is t's19Ro 2CCp 5 31 n,th?1a1131)1Si'ir'_ lig;{. it.i1 T'li{11 1.r, to nccc' o• �_ h I 1.3pi,_ ,.;,u t 1, 1 1a1, o_ s ,13110, 03: 1:r,,su +J el Co+31 1.ht', the -1ei,m e bred by t ;911M: m a r i[m pJ , ort p -r 1 I )'au.r .i i r r,.,l,,, Jcl rn r l l ;'7il r .,' ,t 0 4.a.btra'.ton pursuant rD Semon 15.4 or A(-\ Document A201-2001 L(nyanon 'n a cow -tar competent turr:,dic wn ❑ Otter: ARTICLE 7 TER INA T Ig21 OP,, Si13Pc; 651061 y 7,1 The Contract may be terminated by the Owner or the Contactor as provided in Amick id o(AJA Document A201-2007. q 7.2 The Work may be suspended by the 0wner as provided In Ari:cie 14 of AIA Document A201 200'' ARTICLc 3 d41:3SELLvy500s PR0VIS10PL3 5 1.1 Where reference is made in this P.g;e smear 'o a provision of -\IA Co Document, he reference. :ter i0 :hat provision ns amen: ed or suppler -nen Documents. . amenr A20! 2047 or eaoncer C;,c. ct -,1b;•• other p; _ ,s:nes of Me CoIrnct § 3.2 Payments due and unpaid under the Contract shall bear interest From the data pn'ment is due 33 the rata stated below, or in the absence thereof, ar the legal rate prevailing from time to time al the place where the Pro, ect in located. arisen rata of interest agreed upon, i any.), 58.3 The Owner's representative: Warne, address and other informs%ton) Richard Holtman Black Hawk County E911 Service Hoard 225 E. 6th. Street Waterloo, IA 50703 3 3.01 The Contractor's representative: (Wave, address and otter inforaranonr Clyde Murphy Murphy Tower Service, LLC 20220 Hwy 5 Carlisle, IA 50047 3,5 Neither the Owners' '1e: the Contra so other parry Int[. 4IA Dccamcrt,ll ]1' . _r;. Geyf£M J 1319. Ira 1325 ,i¢nI1cls 1 4. a tit f Iti ] UA oc l31I ia A(1, r r 13a risei. f13 [:loa cl' rlr.,+J 1t 5'rr h:nv''roLF. .eors::ntahve ;hall c ch an^;ed wo•,+r Lr ,, Ca ..._;:'c 6. the 1037 1251, I9 a 12E1.'98a lau7 1971 19� c row cats `� 3 3 ia> dsa rnrt- :I 1 n ii 113ira(Yir1 11 L>., , aamrl,' a0)( it a, I:In l.ttl 030103,1 ,3311.4113A a.Am1d 1 ,afad u,. ,.Lf nlerrl a'Ia? tl] 1 arms of U4 c ,r 1. o Crroro`'Ma 1 ,,trl., 31 Jg133201 tr 3neair3 53:P 3rli"1023' - )0 3A9.. tA.la are 9'nl § 3.6 Other pro l ions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agrecmeut, are enumerated in the sections below. § 9.1.1 The Agreement is this executed ALA Document A101-2007, Standard Furn1 of Agreement Between Owner and Contractor. § 0.1.2 The General Conditions ar••3 ALA Document A201 -2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages 00 73 00 Supplementary Conditions - AIA May 27, 2016 3 § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement) Project Manual for Tower Site Construction, Black Ha'.vk County, Iowa, dated May 27, 2016 including all specification sections ai identified in the table of contents (Attached). Section Title Date Pages AIA Document Ale/ _200y, copyright 91915, 1918, 1525, 1937, 1951, 1959. 1961, 1963, 1967, 1974. 1977. 1087, 1991, 1997ax12907 by The Ameri&n!ra ieof MIi,lects. All dghts ro5erved, WARNING: This AIA'Oocumenl Is protected by V.S. Copyright Lew and International Treaties. Unauthorized reproduo0on or distribution of /his MA'Oocunlent, or any portion of it, may result In sov¢to rivlt and odminal penalties, and will bo prosecuted to Uae maximum extent possible under No law This document was created en 07/06/2018 10 40 27 under the terms Of AlA 0ocum00Ie ,nAomard "' order no. 2009335645 and is not (cc esa!e This document us Icansed by the Ameacan Inslitule or orct,ilecc ter one-0ma use arty, and may nal be reproduced odor to its dompleUon 7 INt 1319 I 5 Ts f'r_vo. Project Jlr tel for Tower 3i Cm. ir.n, ata ;..; :cur,;- fres dated ed.i.y ". 6 Ir.:i,:,f;-i is 1 xaon .. ._rc er..:; 333niir':. n 1,,3 :able o ..,,nrati ..-I,reeti L. Atuml)or Titla § 9.1.6 The Addenda, if any: Date Number Date Pages Addendum NI June 17, 20:5 6 Addendum 42 lune 23, 3015 Portions of Addenda relating to bidding requirements 3re ant part of the Contract Documents unless the bidding cequimmcae3 .3re 3130 enumerated in this Apicic 9. 9.1.7 Additional documents, if any, foaming pact of the Contract Documents: .1 AIA Document E201115L2007. Digital Data Protocol Exhibit, if completed by the paares, or the following: .7. Other documents, if any, Listed below: (List here any additional ducualears than ve intended to forst part of the Contract Document!. .111 Document .1201 2007 provides that bedding requirements 311th as ad',er sernenr or invitation ro bid instructions to Bidders. ;ample fortis and the Conrsuctor'r mrd are not purr of the C'onn'aet alcualentr unless znnmerunrl in this .lgreenreett Tae. ;ho,Jti be listed here o,Jv (% intender/ to be part of the Contract Documents.) Invitation to Bid, Supplementer/ Instmctions to Bidders, and Information Available to Bidders as identified in the table of contents for Project Manual for Tower Site Construction, Black Hawk County, Iowa. dated May 27 201.5 including all seecii:caiion >eccicns as identified in the table of contents (Attached), AOcnun o o n )1915, 1313 '325, 133 1931, I39 l70', 113 0 '974 '377 193 :931,1931 3rd 2307 ay 73e 4n r hIo raI t' ;t 3L1o nInt r id :y 33opf9`i_a v.md'nr radon ra .6_, Uneutola:J.- ri oftc3 a CI.X.S1b1.02:011 a' in\i\0oa-ren;a;my tjno,i,rt d •i c )a I w:mr,r9 rnA4.-; :End will are -cub. a'1a 'h r Pel ni-vat':r al J in ) f r f•1 I- d,r try : pea'. N 031^•n adm n n 1 i frn ;;;t1 Tr.:z. n'e' / d_.eerrd3 45 atT.marnc 3rlarno. '3 r 3.a r ;ern r wrsN ay fa �,, ,rte, nsIC4 ;1 ,, ;r,;irs bre ru, - ;F mclali9r •. .... !rd •=1 vy ¢d'.e:a CnCr!a � o: ARTICLE 10 INSI1ftANCE AND VOPIDS rhe Contndror shall purcila,o and mrmlato insutonec and aroV!JC bonds as zee Borth Ih Artie Ir, 11 of ALA Document A20i 2007, ()tate_ bonding r?quirau'ents iiJ uq, lad limits o/'li rfii(.n;J�a' uerlu'lnt: regsrred rn .!rr.'c(e (1 oJ.Iti Cry 2unl2n? .4101.2'0j . Type of Insuranca or 8ond Limit of Liability or Sand Amount (li0.00) Refer to Supplementary Conditions This Agreement entered into '(044N �ignaturel n (Friuli faille am! tart'.; of the rlay and year tirsr written above. Chiir CONT CTOR (Signature) i757/ • CVO 4' Li �a e � sdf t�f ytce..,; (Preyed :wine earl title) I ,llA OccumantA101111— TC07. Copyr'.9id 7 1515. 1313. 1025, :037. 1951. 1994. 1951. 11167, 1557 1373, 1077. 1987. 1901 1597 and 2607 by The ?mencan'rst&Ue at %crdecla. All VAR Insar ?0.,14at I' CG: thin AU1` Oocunont in p,•ob,ct J'ly 1JS Coppr'yhtLaw anp'ntaingettN Tma5ev Unauthwryd c9croducticn or dlstibuhan of thisAleOccurnent. or sly piston oGt,MP/ n�uf in sotto. twit uld etlmind pfx1910459,:md v.111 a9mtl 0 ,ma secutolin 'Wan! savable undortI91ww is dccomertw/as ;mated on 07:,?:20151RJ02r 'nor!hu e:ermof AODocumonla.o.O:ma7d`N once. no 2;M:139.15 and S'CI Int 'sale. rnis eccvmenl s stoned ;y 1-9 ?warm, Irsl.iule of -a.rnacs'Cr )1,1- /Are raa orly, ?rd may 101 he teprr h;ced pact 'o [5 ccwa Brun 3 Tov;er Site Construction 131aek Hawk County, Iowa SECTION 00 01 10 TABLE OF CONTENTS Section Title MISCELLANEOUS DOCUMENTS 00 01 10 Table of Contents BIDDENG REQUIREMENTS 00 11 16 Invitation to Bid 00 21 13 Supplementary Instructions to Bidders - AIA ALA Form A701 Instruction to Bidders (1997) 00 31 00 Information Available to Bidders Geotechnical Report - Waterloo PD Geotechnical Report - Hudson Tower 00 41 13 Bid Fonn - Stipulated Price CONTRACTING REQUIREMENTS 00 50 00 Agreement - AI_A AIA Form A101 Standard Fonn of Agreement Between Owner and Contractor- Stipulated Price (2007) 00 72 00 General Conditions - ALA 00 73 00 Supplementary Conditions - AIA Sheet Tbru 00 01 I0-6 00 1 1 16-2 00 21 13-3 A701-6 00 31 00-1 36 Pages 38 Pages 00 41, 13-5 00 50 00-1 A101.8 00 72 00-1 00 73 00-3 DIVISION 1 -GENERAL REQUIREMENTS 01 10 00 Summary 01 10 00-8 01 20 00 Price and Payment Procedures 01 20 00-3 01 23 00 Alternates 01 23 00-2 01 30 00 Administrative Requirements 01 30 00-4 01 33 00 Submittal Procedures 01 33 00-5 0! 50 00 Temporary Facilities and Controls 01 50 00-4 01 70 00 Execution and Closeout Requirements 01 70 00-2 DIVISION 2 - EXISTING CONDITIONS 02 41 13 Demolition 02 41 10-3 DIVISION 3 - CONCRETE 03 30 00 Cast -In -Place Concrete 03 30 00-6 May 27, 2016 Table of Contents 000110- Tower Site Constriction Black hawk County, Iowa DIVISION 26 - ELECTRICAL 26 32 00 26 36 00 Packaged Generator Assemblies Transfer Switches DIVISION 31 -EARTHWORK 31 05 13 31 05 16 31 1000 31 22 13 31 23 16 31 23 17 31 23 23 DIVISION 32 3231 13 DIVISION 33 33 11 00 33 79 00 333100 333200 333300 Soils Cor Earthwork Aggregates for Earthwork Site Clearing Rough Grading Excavation Trenching Fill -EXTERIOR IMPROVEMENTS Chain Link Fences and Gates -UTILITIES LP Net Systems Grounding and Lightning Protection Communication Towers Transmission Lines Antennas DRAWINGS - Bound Separately WATERLOO PD Cover Sheet Boundary and Topographic Survey Demolition Plan Overall Site Plan Compound Plan Grading Plan Site Details Site Details Tower Loading/Elevation Transmission Line Installation Details Antenna Installation Details Ice Bridge Details Utility Site Plan Grounding Site Plan Shelter Grounding u. Electrical Plan Grounding Details Grounding Details 26 32 00-10 26 36 00-5 31 05 t3-3 31 05 16-5 31 1000-3 31 22 13-6 3123 16-3 312317.5 31 23 234 32 31 13-4 33 1 t 00-5 33 79 00-7 33 31 00-13 33 32 00-3 3333002 Sheets Th]v G-001 C-100 C-101 0-102 0-103 0-501 C-502 T-201 T-501 T-502 T-503 E-101 E-102 E-103 E-501 E-502 May 27, 2016 Table of Contents 000110- 2 Tower Site Construction B lad FIaw!k County, Iowa Ltility Details E-503 Diesel Generator Detail E-504 Shelter One Line E-60! Shelter One Line (Alternate 41B) E-602 Shelter [tern List A-001 Shelter Floor Plan A-101 Shelter Reflected Ceiling Plan A-102 Shelter Exterior Elevations A-201 Shelter Interior Elevations A-202 Shelter Foundation Details S-501 Landscape & Irrigation Systetn Plan L - l0! Landscaping Details L-501 DUNKERTON (USCC) Cover Sheet G-00! Overall Site Plan C-101 Compound Plan C-102 Site Details C-501 Site Details C-502 Generator Fuel System Details C-503 Tower Loading/Elevation T-20 I Transmission Line Installation Details T-501 Antenna Installation Details T-502 tee Bridge Details T-503 Utility Site Plan E-101 Grounding Site Plan E-IO2 Shelter Grounding & Electrical Plan E-103 Grounding Details E-501 Grounding Details E-502 Shelter One Line E-601 Shelter [rem List A-001 Shelter Floor Plan A-101 Shelter Reflected Ceiling Plan A-102 Shelter Exterior Elevations A-201. Shelter Interior Elevations A;201 Shelter Foundation Derails 5-501 LA PORTE CITY (TowerCo) Cover Sheet 0-001 Overall Site Plan C -tot Compound Plan C-102 Grading Plan Site Details C-103 Site Details C-501 0-502 Generator Fuel System Details C-503 Tower Loading/Elevation 'f-201 May 27, 2016 Table of Contents 000110- 3 Tmvcr Site Construe' inn Black Hawk County, Iowa Transmission Line Installation Details T-501 Antenna Intal lation Details -I-.503 Ice Bridge Details T-503 Utility Sire Plan E-101 Grounding Site Plan E-102 Shelter Grounding & Electrical Plan E103 Grounding Details ESO Grounding Details E-502 Shelter One Line 8-601 Shelter Item List 001 Shelter Floor Plan A -A-101 Shelter Reflected Ceiling Plan A-101 Shelter Exterior Elevations - 201 Shelter Interior Elevations A_)02 Shelter Foundation Derails S-50( f-IUDSON Cover Sheet G-001 Overall Site Plan C-(01 Compound Plan C-102 Grading Plan C-103 Demolition Plan C -I04 Sire Details C -SOI Site Details C-502 Generator Fuel System Details C-503 Tower Loading/Elevation 1-201 Transmission Line Installation Details T-50 1 Antenna Installation Details T-502 Ice Bridge Details T-503 Utility Site Plan E-101 Grounding Site Plan 8-102 Shelter Grounding & Electrical Plan E-103 Grounding Details E-501 Grounding Details E-502 Utility Details E-503 Shelter one Line E-60 t Shelter Item List A-001 Shelter Floor Plan A-101 Shelter Reflected Ceiling Plan A-102 Shelter Exterior Elevations A-201 Shelter Interior Elevations A-1707 Structural Notes 5-001 Tower Foundation Modification Plan 5-101 Foundation Modification Details 5-501 Foundation Modification Details S-502 Shelter Foundation Details S-503 May 27, 20(6 Table of Contents 0001(0-4 Tower Sin: Con: u-ucnon Black Hawk Crum',, Iowa CEDAR FALLS (Towerco) Cover Sheet 0-001 Overall Site Plan C-101 Compound Plan C-102 Grading Plan C-103 Site Details C-501 Site Details C-502 Tower Loadim_ Elevation T-201 Transmission Line Installation Details T-501 Antenna Installation Details T-502 lee Bridge Details T-503 Utility Sire Plan - E-101 Grounding Site Plan E-102 Shelter Grounding & Electrical Plan E-103 Grounding Details E-501 Grounding Details E-502 Diesel Generator Detail E-503 Shelter One Line E-601 Shelter Item List A-001 Shelter Floor Plan A-101 Shelter Retlected Ceiling Plan A-102 Shelter Exterior Elevations A-201 Shelter Interior Elevations A-202 Shelter Foundation Details 5-501 SUNY 5 [DE (American Tower) Cover Sheet G-001 Overall Site Plan C-101 Compound Plan C-102 Site Details C-501 Site Details C-502 Generator Fuel System Details C-503 Tower Loading/Elevation T-201 Transmission Line Installation Details "-501 Antenna Installation Derails T-502 Ice Bridge Details T•503 Utility Site Plan E-101 Grounding Site Plan E-102 Shelter Grounding & Electrical Plan E-103 Grounding Details E-501 Grounding Derails E-502 Shelter One Line E-601 Shelter [tem List ,x-001 Shelter Floor Plan A -1D1 Shelter Reflected Ceiling Plan A-102 Shelter Exterior Elevations A-201 May 27, 2016 Table of Contents 000110-5 Power Site Construction Black Hawk County, Iowa Shelter Interior Elevations Shelter Foundation Detaik JESUP WT ,x.202 S-501 Cover Sheet 0,001 Overall Site Plan C -1O1 Site Platt C -t02 Compound Plan C-103 Grading Plan C-104 Site Details C -50L Site Details C-502 Generator Fuel System Details C-503 "['ower Loading/Elevation T-201 Tower Cross Sections T-301 Tower Cross Sections T-302 Antenna Installation Details 1'-501 Antenna Installation Details T-502 Ice Bridge Details T-503 Utility Site Plan E-101 Grounding Site Plan E-102 Shelter Grounding & Electrical Plan E-103 Grounding Details E-501 Grounding Details E-502 Utility Details E-503 Shelter One Line E-601 Shelter (tem List A--001 Shelter Floor Plan A-101 Shelter Reflected Ceiling Plan A-IO2 Shelter Exterior Elevations A-201 Shelter Interior Elevations A-202 Structural Notes 5.001 Handrail Modification Plan 5-101 Shelter Foundation Details S-501 Handrail Modification Details S-502 Handrail Modification Details 5-503 Tank Penetration Details 5-504 END OF SECTION vlay 27, 2016 Table of Contents 0001[0-6 Exhibit "C" • 0000041050* SITE LOCATION -- SITE LOCATION MAP BLACK HAWK COUNTY WATERLOO PD BLACK HAWK COUNTY WATERLOO, IOWA CONSTRUCTION DRAWINGS PROJECT DIRECTORY: an PROJECT INFO: SHEET INDEX; NO.: PAGE TITLE r.w u�nu .000 COVER SHEET 1 BOUNDARY ANO TOPOGRAPHIC SURVEY an oFewsmoo G-100 OEMOL2l0OH ALAI! ropAtehM 01•111 WATLI.D...41.1 C-101 OVERALL SITE PLAN C-102 COMPOUND PLAN TrItniWittm 0.103 ORAOING PLAN tit INLYMIT 0.501 SITE DETAILS 1.11.400.4 WM 0.502 SITE DETAILS .Wa O1M14r 1-201 TOWER LOA 'NG/ELEVATION T-501 TRAN5MI551 N 1010 INSTALLAPON DETAILS T502 ANTENNA IN TALLATION OETAILB 8502 ICE BRIDGE RAILS •o uc n' 7 0.101 UTILITY SIT PLAN E -l02 GROUNDING SDE PLAN 0.102 SHELTER GROUNDING & ELECTRICAL PLAN 0.001 GROUNDING DETAILS itIcv, •0-^4^^' 0-502 GROUNDING DETAILS 1-503 UTILITY OET ILS ""L"'1 "' 0400 DIESEL GENERATOR DETAIL m.m wQcomAC.wy 0000 ELECTRICAL ONE LINE E-502 ELECTRIC* ONE LINE (ALTERNATE HB) A-001 SHELTER ITEM LIST A-101 SHELTERELOOR PLAN A-102 SHELTERR ELECTED CEILING PLAN A-201 SHELTER EXTERIOR ELEVATIONS A-202 SHELTER INTERIOR ELEVATIONS 5.501 SHELTER FOUNDATION DETAILS 0-101 LAN05CAP A IRRIGATION SYSTEM PSAN 0.501 LANDSCAPING DETAILS COVER SHEET 0-001 O ounonnY All O TOPOOMPiOO 54nVEY WATEOLOO Pouf DEPARTMENT OLAMIAwK covxTY, IOA& VICINITY MAP uvo DEMO LEGEND 5 (INIS54EEi) GDDUIIDIIIfl NOTES ITl11i 911EET 0 W 5 L r I � EXISTING BUILDING lj tcr r Nth _• H 'YWOTL9 I1 113 31 GI- WAAL110(11 111113SIIEETI COMPOUND P T ca02 GR/ DING b EROSION C UDR LN T C•103 On J� ...,.. _i Holy A A4.0 yeC�\ I WATERLOO PD BLACK HAWK COUNtt WATERLOO, IOWA N lagv v r n e n L n.. Y.nematrci Q o 0 ONIVEV/AY SECTION LOIAYOONO SECl1011 O _., a .... I. 4 gni /4 0, 7 a. .y nur ra (((It ...r.. e 0 ICE BRIDGE I U ILRY HACK POS i FOUNDATION J PIPE BOLL APO � `GONCPEiE PAD J v C -r' $U1x . Ecl Edge 0 \ „,i •-a44,7"...iy,-,=7:=-,1 -.....„., ‘s. • '; - ± -. : IL. _ : ' - vi :._ :___-::. ; \-,- A.'" ' , . 1 _ I _ ........... 1 WATERLOO PO BLACK HAWK COUNTY WATERLOO. IOWA SITE DETAILS 1 ii,„-Ii ,p-,. -,,i, ,r , ____ , , [1 , _,„--- - ;,,,r,:::,,,,„„ _ ,...., dr, ” • —_7„ --- 1 H ., I.' , ;,, :J{' I t - . .. • ,,,,--,- , MAN GATE I i [_ "'" ,g1K--1,4`„•,;:','"-"" FENCING DETAILS 1-riat Ans l'r.',.":.-1•." it '37..z.gt.- .,...,,,. au _,----- /1 r E -- - - \ \ 1----' i ( . 1 ; ,,...,_ .. ,‘„,,,,,,,,,,,,,,Q,.„.,,,, '?'..,Rti,'"FiLt'i-i•Erj.-?,.1r,:fh';'0.!..1';',4`ag.7.:-.1,i,,nir." ' • • •-•• • pal. ._.. -„---. :,';', UTILITY TRENCH ASA SIGNAGE DETAIL FIAER HANDHOLEDETAA AEA, lova r canal C.502 0 0 0 0 0 TOWER ORIENTATION TOVEOR LOGGING LEGEND I I • •-• • ...! . .., - I TOWER LOADING /ELEVATION •-.- • ^. I . , rem) TOWER LOADING LEGEND TOWER PROFILE (ELEVATION) T-201 --------- E Edge LA -91:1031J ":f ,0 cfi c.) crs t . 2 NI :". 2 : : \ A‘c„.,„, c „D„rucccr "" {1-1 I " " \‘ WATERLOO PO BLACK HAWK COUNTY tVATERLCA IOWA TRANSMISSION LINE INSTALLATION DETAILS II: l. " n '' nil .(. i)1( ( : : :r k—k —A: — _ LODEN ,13 0nal NOEL 1 0 VIEWED MOO moo! GREATER/ E' IL: -4-4 • ' 4- Y - L - 4 -4 4 4-1} COAX LEGOID n n n n n n 4 4 4 4 4 COAX LEGEND D upozq i in,u3 on,c.1 p. 1 MrclegotTZ tIVAVVVierat, TRANS/MSS/1On LINE LADDER ROUTING ENTRY PANEL ROUTING 0 0 r /-1EEADNEED- //'/, A.,41 .7 .F.4" 1 L I I , 2 , i „,... _____ VERTICAL - **TRANSMISSION TRANsMISSION 1 LINE ---- ... LINE INSTALLATION LADDER OET NOT PART rC TO SHELTER BY OF CONTRACT c OAR ENTRY DETAIL OTHERS** ..„...... „. T -5O1 0 0 IR Edge ,�; k �.. - .. ..,.. e4evnnou=.. Lv+ T -i CI poo o Jap a ANTENNA INSTALLATION DETAILS r ..�..., .- • _.0 - - _ ���.,. .,. .�...... PI sN MOUNTING 4' STAND OFF MOUNT 00 O NNNN * * ALL WORK THIS NOT PART OF They. sN ice Ck PAGE BY OTHERS * * CONTRACT \THi ssG )340€ C F 4 /hFNTio NI_ T,50i 117 1--jr No__) NN I 6: 0.) , CE ClitIDGE 110TES 1 (MIS SWUM ICE MIDGE OFTAILS 12 WIDE DRIP SIRYjailiDGE i 24 WIDE GRIP STRUT ICE BRIDGE ICE BRIDGE DETAILS DEM IIENTIRCATIONI T.503 ITE UNLEFY DOTES: 0 HS SHEET. 7 EXISTING BUILDING xr rs!"."VrEit”.1.Eret.W.Igr.ES.WrIWIS1 \ k-4.) Li) t UTILITY SITE PLAN MENNWir ION E.101 , ----- --- nerrvoies:EHIS SHEEIE EE . GROUNOmO NOTES. (THIS SHEET/ ' L','EE'E"-e-E-EL-EE:-E-E.'E-,EEELELEIEEELEEE GROUNDING LEGEND f THIS SHEET) • —• VE=EEEZEIEWErAE.; EE -Err, P EXISTING DUILDING 1 Ei E:TEEEVEEEEEEEEEE'E;EEJEEEIEEEEEEEiEEEWEEEW-7E=ESEEEEEEEE!4EEV'EttfltELEE.EEEEEE'EEIEEEEEEEEEEEEEEEESEE ;%ij .1 I g *N r I i ir 4) • i-7-4?, i i • L ol I I , i I 5 I GROUNDING SITE PLAN 1 61ErylVrffIliql E-102 . • • ,jffly 2j ,..zi. --L 6)-py-t-e-,-,.ir.2e-qs,'------:--5:' ,cy 1 • -.1] L I. ' °i c - - ----- C— 1— l 4Z ( A SHELTER GROUNDING &ELECTRICAL PLAN 17 OrEPI . PANEL DIRECTORY SHELTER GROUNDING & ELECTRICAL PLAN coancrur.a. E-103 ISE) 100%t 1 4 IS 11i E Edge F., WATERLOO PD BLACK HAWK COUNTY WATERLOO. IOWA GROUNDING DETAILS 1 � INSPECTION j WELL * ✓... ` TRENCH FENCE POST GROUNDING O O OGROUNDING L'i'l iP: FEIICE GATE G ROUNDING EENCE FABRIC &DETERRENT WIRING BONDING DETAIL TOWER, REIT ER FOUNDATION GROUNDING win lmm_ E-sni O O O C?) 441,14 0 DP EDO TIP_ ,...nrro VI, 70 V GROUNDING OCTAILS fc- OINTERIDNIEXTER1011. SHELTER GROUND OARS 0 TRANSMISSION LINE GROUND KITS °ah o_ 9xo w if cr 35; GROUNDING DETAILS E-502 LI,FAO.:11921 UTILITY RACK LJU ELEVATION 0 CONDUIT STUB.UP 0 CONDUIT SIUR.UP M SHELTER 08Q 04c d j < U UTILITY DETAILS --- Mkt% 11101110“.Thile E -S03 ----- --- n DIESEL GENERATOR DETAIL DIESEL GENERATOR DETAILS .I I E-504 EY UTILITY PROVIDER 1 I vmputiv , IT'il —T cx,, I i-11W'c[1, (1-T-1 BY OTHERS ERn 44144144 PERM -WITHIN SHELTER (SEE NOTE 7) E14-- r - c.(1. pa4 3E1 vl • M.Q, ;ten. is C.—. a ni aLTA .4 .SFE ..IC • Lt401t. 4",, 0. 089 0 z cE ELECTRICAL ONE LIME E-601 EY UI1LtTY PROVIOER )_' TLTERHATE RID RIR FY,Is'TII to wlTtll l CITY HALL L_ PANEL INTMNSNFLTER {SEE NOTE T) HY OTHERS 0 ELECTRICAL ONE LINE DIAGRAM ELECTRICAL ONE LINE (ALTERNATE #1B E-602 E Edge C 'I'll"' " I"mril SHELTER ITEM LIST „ Wasp,. Emy pm fw pare0 „„, j03t,j),,, fir-R•C4ti37,„ Doom EMIscellaneous I 4 , 354.94314 r„F1!lL5!31!4355 st 6.1i:c.a., 1 ?T5, ecrtrtn.-cb c 1 1,4c,„, 55 055!! /3 Mar.,. 4e,&155 WATERLOO PD SLACK HAWK COW11, WATERL00,10WA SHELTER REM LIST ¢,creil F.; a „ 19 „ i 5: H /ALL,. isr.,17 saia„ Ent. ,,c,,,.,,texel,;n.......t. 22 n " I ,.„.,,., a ,c„...,F „„.„ co.„,„,c„.., ,,011513433 FE ot,„64„„4eu5Cvserre4a, n A C.,,,, „„il _n C. -en,. , ra e) • 5..4.c.....4....4.44,44p...e4.4 .2.•, 54)2(41.„153453..115“,414 5,4555 „ itAt540r:o,”3,),„Se__%, 35 I eS ;IA»: So„,„„),JC,). C:„1,t, 2,2 nn'anP•nn.n 44)24n22,224)4..'n' )2 is.)„..)sp,..c.f 545).-!! 5544455414.555 '2 2.9`E"P`n..222-2 6'"t2222 V 14)555515443 eme„4e4.5).044 :0 rriul-L,NiCir, I: 1 51 r ), 44 0135,3544 04153311414 43 x Dsc 102,..). 7r4„ 4..: .N.IA C.Iel, 25 n3",,,,3.)41),5_!!in1E95 nn.„, n) :), C4.,,412)4,„0».‘,41,354 20 "nnmn'n'2"22 420 '225222542 nn"'22.2 222•22" " 5n2222 -"‘"n22'1224262" 2222222" " 22"122."2".2"''" 'Ec " Gnn2:212'2"22"" "a .22222"'" 21 5,9sInttneu,„.„E„,,) (41. Ona„ ....„ . 2 .„.”. 33544031 3,0,040 .ev el.... . .... . I maripti„Wncn A-.001 , Ito„.". <G--tp I, v„ „ v, it> SHELTER FLOOR PLAN (79 .57 SHELTER FLOOR PLAN A-101 GIIELlElt (INFLECTED CEILING PLAN a 089 OYO W iJ 353 SHELTER REFLECTED CEILING PLAN A-102 k EXTERIOR ELEVATION J B EXTERIOR ELEVATION EXTERIORELEVATON SHELTER EXTERIOR ELEVATIONS • A-201 \,n 0 INTERIOR ELEVATION sza, „..., : I I 1 FLL11._,-e' r) \ C. „, o INTERIOR ELEVATION I? INTERIOR ELEVATION yet, -.-7 s.1,..h.pThi' ' , Ter 'Pt L—c, (.. INTERIOR ELEVATION fl 082 3co Ea r6 u SHELTER INTERIOR ELEVATIONS 10t,dfgrAc,,. A402 , i 0 f , 01,11!2,?G 11ffiP,' WATERLOO PO SLACK HAWK COUNTY WATERL00,10WA SHELTER FOUNDATION DETAILS ,,.. /7-7.----'—itit.8.:(21178.41:ii.•.'..//1';"" C) SHELTER FOUNDATION DETALL / 1 . , . SHELTER STOOP OETNL 0 E ' ,T.,88g8..w;.th../Itiv,tYe.co,•;/8,g...?::-8,1,..., .... I f-T--,-.:,_.1, 4 '--:--:- - •6-7,4.74:. . • i 0 TIE DOWN PLATE DETAIL —I' ''-' I -::: ......_ .......„ ,_. 5-501 0 KEYNOTES (THIS SP EET) / 1 EXISTING OUROING WATERLOO PD BLACK HAWK COUNTY WATERLOO. IOWA LANDSCAPING &IRRIGATION SYSTEM PLAN fi--:3 9 ' r --. i, c*-'- G t: - /, ! . WI I I ("'eorz u,x.,. L.107X L �, rite r 5 ..-"3.15.,k,R— a u PLANTING BED EDGE DETAIL 1 mp ` W• 8' lai WATERLOO PD OACK HAWKC011NTY WATERL00.IOWA LANDSCAPING DETAILS CADBALLS. BURLAP TREE PLANTING DETAIL O Ili! Il .III L-501., Exhibit "D" TOWER LOAD ANTENNA ID ANTENNA TYPE ANTENNA MODEL, DESCRIPTION & (QTY) TOWER LEG ANTENNA MOUNT MOUNTING HEIGHT C/L HEIGHT C/L ELEV. (NAVD 88) Al OMNI (1) DSBA12F36U-N 22.3.11.63 Ib C (1) 118600 6' Standoff Mount 225.0 250.0 A2 OMNI (1)D58Al2F36U-N8 22.3 11,63 Ib (1)118600 6' Standoff Mount 225.0 167.0 A3 MW DISH (1) HP6-59RS w/ RadomeA Eft dia.. 251 Ib (1)4-1/2" O.D. x 96" Dish Mount (PM-SL4-96) 220,00 220.0 A4 OMNI (1) DB224E-(A)8 22.5 fl, 38 Ib (1) PB-G3T-2 3' Standoff Mount w) top brace 200.00 210.3 A5 YAGI (1)Y7505 72 in. long, 5 l C Leg Mount 190.00 190.0 A6 MW DISH (1) HP6-11RS w/ RadomeC 6(1 dia., 251 Ib (1)4-1/2" O.D. x 96" Dish Mount (PM-SL4-96) 176.00 176.0 A7 PANEL (1) Ubiquiti airMax SectorA #AM -9M13; 50"x12"x5.5" 2-3/8" OD Leg Mount Universal Pole Mount 171.00 771.0 A8 PANEL (1) Ubiquiti airMax Sector #AM -9M13; 50"x12"x5.5" B 2-3/8" OD Leg Mount Universal Pole Mount 777,00 171.0 A9 PANEL (1) Ubiquiti airMax SectorC #AM -9M13; 50"x12"x5.5" 2-3/8" OD Leg Mount Universal Pole Mount 171.00 171.0 A10 PANEL (1) Ubiquiti airMax Titanium Sector #AM-V5G-Ti; 29"x6"x3" A 2-3/8" OD Leg Mount Universal Pole Mount 166.00 166.0 All PANEL (1) Ubiquiti airMax Titanium Sector NAM-V50-T#29"x6"x3" 8 2-3/8" OD Leg Mount Universal Pole Mount 766.00 166.0 Al2 PANEL (1) Ubiquili airMax Titanium Sector #AM-V5G-Ti: 29"x6"x3" C 2-3/8" OD Leg Mount Universal Pole Mount 166.00 166.0 A13 PANEL (1) Ubiquiti airFiber58 37" long, 35 Ib 2-3/8" OD Leg Mount Universal Pole Mount 161.00 161.0 A14 PANEL (1) Ubiquiti airFiber5 37" long, 35 Ib C 2-3/8" OD Leg Mount Universal Pole Mount 161.00 161.0 Ash PANEL Cellular LOA 12"x12" 0 2-3)8" OD Leg Mount Universal Pole Mount 158.00 156.0 A16 PANEL (1) Ubiquiti Rocket M58 AMO -5G110 2-3/8" OD Leg Mount Universal Pole Mount 156.00 156.0 Al7 DIPOLE (1) DB -4088A 9.4 ft, 171b. (1) PB-G3T-2 3' Standoff Mount 156.00 160.7 ING LEGEND ANTENNA AZIMUTH TILT (+/-) TX LINE SIZE USE FREQUENCY (MHz) Power (Watt) USE OWNER NOTES 070° (1) 1.114" (1) 1/2" P25 806-869 P25 Remeve Black Hawk Co. w/TTA 90° (1) 1-1/4" P25 806-869 P25 Transmit Black Hawk Co. 60.22° (1) EW63 uW 5925-6424 To Dunkedon Black Hawk Co. No Ice Shield 180` (1) 7/8" Sirens 138-150 VHF (EMA Civil Defense) Black Hawk Co. See Note #3 240' (1) 1/2" VHF 150-174 VHF (Helmond LEA) Black Hawk Co. 277.87' (1) EWP90-107 P25 5925-6424 To Cedar Falls Black Hawk Co. w/ Ice Shield (Eupen MIS6C) 0' (1) CAT5 City 902-928 City of Waterloo Future 120' (1) CAT5 City 902-928 City of Waterloo Future 240° (1) CATS City 902-928 City of Waterloo Future 0° (1) CAT5 City 5450-5850 City of Waterloo Future 120° (1) CATS City 5450-5850 City of Waterloo Future 240° (1) CAT5 City 5450-5850 City of Waterloo Future 240° (1) CAT5 City 5800 Sullivan Park City of Waterloo Police Salvaged from existing lower Reinstall on new lower 240° (1) CAT5 City 5800 Covenant Hospital City of Waterloo Traffic Salvaged from existing tower Reinstall on new tower 270° (1) CATS City Cellular BOA City of Waterloo Future 120° (1) CAT5 City 5800 City Gas Pumps City of Waterloo Cental Garage Salvaged from existing tower Reinstall on new tower 0' (1) 7/8" Paging 450-469 UHF Paging Black Hawk Co. , 1 1 A18 -A29 PANEL (12) Coll Panels(1) 60 lbs, e'x1'x6" Heavy Duty V -Frame on 2"x72" Mast Pipe 150.00 150.0 A30 DIPOLE (1) DB -222A 10.5 fl, 161b B (1) P8-G3T-2 3' Standoff Mount 135.0 140.25 A31 DIPOLE (1) DB -222A 10.5 ft, 16 Ib C (1) PB-G3T-2 3' Standoff Mount 125.0 130.25 A32 PANEL (1) Ubiquili Rocket M5 AMO -5G110 C 2-318" OD Leg Mount Universal Pole Mount 120.00 120.0 A33DIPOLE (1) DB -222A 10.5 ft, 16 Ib A (1) PB -63T-2 3' Standoff Mount 115.0 120.25 A34 -A45 PANEL (12) Cell Panels 60 lbs, 8'815c6" ABC (1) Heavy Duty V -Frame on 2"x72" Mast Pipe 100.00 100.0 A46 MW DISH (1)HP2-18 2 0 dia., 27 Ib C (1)4-1/2"O.D.x96" Dish Mount (PM -5L4-96) 87.0 87.0 A47 -A58 PANEL (12) Cell Panels 60 lbs, 8'xi'x6" ABC (1) Heavy Duly V -Frame on 2"x72" Mast Pipe 80.00 60.0 A59 YAGI Cellular BDA 8x18" 6 Element C 2-3/8" OD Leg Mount Universal Polo Mount 25.00 25.0